ARTICLE I - SCOPE OF WORK
The Contractor shall perform and guarantee everything required to be performed or guaranteed
and shall provide. and furnish all labor, material, except as otherwise specifically provided,
necessary tools, expendable equipment and all utility and transportation services required to
perform and complete in a workmanlike manner all the work required for the construction known
as:
121ST STREET AND SHELBORNE ROAD WATER MAIN EXTENSION
CARMEL, INDIANA
All in accordance with the plans and specifications, including any and all addenda, prepared by
Beam, Longest & Neff, L.L.C., acting and in these Contract Documents referred to as the
"Engineer", which plans and specifications are made a part of this contract, and to the other
Contract Documents herein mentioned which are a part of this contract; and the Contractor shall
do everything required by this contract and in accordance with other documents constituting a part
hereof.
ARTICLE II -CONDITIONS
Contractor agrees to warranty the work against defects for a period of one year after completion
and acceptance by the Owner.
ARTICLE III - THE CONTRACT PRICE:
The Owner shall pay to the Contractor for the performance of this contract, subject to any
additions or deductions provided therein, the following amount:
$177.471.00 Base Bid $18.135 MandatorvBid.
(Figures)
(in words) One hundred seventy-seven thousand four hundred and seventy one dollars Base Bid
and eiqhtteen thousand one hundred and thirty five dollars Mandatory Bid
ARTICLE IV- PAYMENTS
Payments are to be"made to the Contractor in accordance with the progression of the work; and
are conditioned upon 'the Contractor furnishing the Owner with the satisfactory evidence that all
payrolls, material bills and other cost incurred by the Contractor in connection with the
construction of the work have been paid in full. A 5% retainage is to be until 61 days after work"
completion.
CD-2
~
ARTICLE V - COMPONENT PARTS OF THIS CONTRACT
. This contract shall consist of the following component parts all of which are as fully a part of this
contract as If herein set out verbatim, or if not attached, as if hereto attached:
1. This Instrument
2. General Conditions
3. Supplementary General Conditions
4. Specifications, including all Addenda
5. Plans
6. Proposal
7. Information.For Bidders
8. Advertisement For Bids
9. Performance and Payment Bonds
In the event that any provision in any of the above component parts of this contract conflicts
with any provision in any of the other component parts, the provisions in the component part
first enumerated above shall govern over any other component part which follows it numerically
except as may be otherwise specifically stated.
.In witness whereof, the parties hereto have caused this instrument to be executed in three (3)
original counterparts the day and year first above written.
CONTRACTOR:
OWNER:
CITY OF CARMEL
1j}rj ~p f). rJ 1F
(By) . .
...... . . .-~-rl./
.....--:. .~ -" . r' "\.,
. -..' ..
; (Corporate Seal)
: -- -- ...;
-: .- -.:
. ',- >- .---~..~:..~ ~ ,
~ #. :, ~"
ATTEST:
/ 4/UuLa~o/
. )fs"~) (/
CD-3