Loading...
HomeMy WebLinkAbout06030092 State Release Would you like to reduce your turnaround time? ELECTRONICALLY FILE YOUR PROJECT WITH STATE OF INDIANA AT .fUe24_7@dhs.state.ln.us, Or VISIT OUR WEB SITE AT www,ln.gov/dhs/osbc Project number CONSTRUCTION DESIGN RELEASE State Form 41191 (R915-98) Report Printed on: March 10,2006 316623 Construction type V-B E~Filed. No hard copy will be mailed 03/10/06 Occupancy classification Release dale A-3, REM Scope of release Indiana Department of Homeland Security DIVISION OF FIRE SAFETY I PLAN REVIEW 402 W. Washington St., Room E245 Indianapolis. IN 46204 INDIANA 021 ~o~.Q.QPO Available AI Your Local Ucence Branch SUPPORT HOOSIER SIl.FETY ELEC ARCH PLUM Type of release Standard To: Owner f Architect J Engineer Design Aire Engineering Inc Earl Wade Boulware 16277 220 N College Ave Indianapolis IN 46202 Project name Fire Station Museum Restroom Addition Street address 210 First Avenue SW c;ty C4.1<P1/U- ax & e-mail: 3174649393, mforney@cripe.biz H4.5If~IS ~ n,1fc;rrJ The plans, specifications and application submitted for the above referenced project have been reviewed for compliance with the applicable rules of the Fire Prevention and Building Safety Commission" The project is released for construction subject to, but not necessarily limited to, the conditions listed'below.'~THIS'IS'NOT~A'BUIl.:DJNG'PERMIT7"AIt required'local'permits and'licenses'must be'obtained.prior to'beginning construction work. All construction work must be in full compliance with all applicable State rules. Any changes in the released plans and/or specifications, must be filed with and released by this Office before any work is"altered.'This' release may be"suspended'or revoked if it is determined,to be issued in, error, in violation of any rules of the Commission or if it is basedoh incorrect or insuffici"ent information; This release shall expire by liniitation, and become null and void, if the work authorized is not commenced within o'ne (1).year from the above 'date. CONDITIONS: ,. . I. . . Note :(A1A & A1B): In accordance with:the affidavit swam under penalties of pe~ury 10 the application for construction design release the plans and specifications filed in conjunction,with this project shall comply with all of the applicable rules and laws of Fire Prevention and S'uilding Safety Commission. Providing false information constitutes an act of perjury, which is a Class D felony punishable by a prison term and a fine up to $10,000. l J-' In accordance with Section 19 ofthe General Administrative Rules (675 lAC 12.6~19) a complete set of plans and specifications that conform exactly to the designt'that was released by the office of Ihe state building commissioner shall be maintained on the construction jobsite as well as a copy at the design release. ' i" i4G0412AC: .No,addition or alteration shall cause an existing building, structure, or any part of the permanent .heatiNg, v",ntilating, air conditioning, electrical, plumbing, sanitary, emergency detection, !emergency communication, or fire or explosion suppression systems to become unsafe or overloaded under the provisions of the rules of the Commission for new construction in accordance with 675 lAC 12-4- 12(c). No addition, alteration, or repair shall reduce existing exit capacities to less than that required under the provisions of the rules of the Indiana Fire and Building Safety Commission for new construction in accordance with 675 lAC 12-4-12(d). pj'eas'e"be advised ih"at^iYanacfmTn"islrative review of this-action is desired, a written petition for reviii'w m-ustbe 'filed -at the- abo-ve address with the Fire Prevention and Building Safety Commission identifying the malter for which a review is sought no later than eighteen (18) days from the above ~ staled date, unless the eighteenth day falls on a Saturday, a Sunday, a legal holiday under State statute, or a day in which the Department of Fire and Building Services is closed during nonnal business hours. In the latter case, the filing deadline will be the first working day thereafter. If you choose to petition, and the before-mentioned procedures are followed, your petition for review will be granted, and an administrative proceeding will be conducted by an administrative law judge of the Fire Prevention and Building Safety Commission. If a petition for review is not flied. this Order will be final, and you must comply with its requirements. I i4G0412AF Filed By Code review official Code Enforcement & Plan Review Branch Director PATRICIA CRAYTON v~d/S'~..~ Address (name,title of local official,street.city,state and ZIP code SR. DEV. COMPLIANCE ANALYST State Fire Marshal V7l'O~ KIRT HAVLIN OIVISION OF COMPLIANCE 604 NORTH SHERMAN DRIVE INDIANAPOLIS, IN 46201 Fax & e~mail: 3173275174 arinos/6)indvoov.oro Page 111