Loading...
HomeMy WebLinkAboutC800 - Construction Details-C80460160JGV-R1 AEC BKR CARMEL, CLAY TOWNSHIPHAMILTON COUNTY, INDIANA06/16/21File Name:S:\60160JGV-R\DWG\C800 - Construction Details.dwg - C804Modified / By:March 19, 2022 4:24:37 PM / ecarsonPlotted / By:March 19, 2022 5:00:23 PM / Erik CarsonJACKSON'S GRANT VILLAGESECTION 101/18/22CITY OF CARMEL REVIEW COMMENTSAEC03/18/22CITY OF CARMEL & TRICO REVIEW COMMENTSAECDATEMARKREVISIONSBYCERTIFIED:S & A JOB NO. SHEET NO. DRAWN BY:CHECKED BY:S T O E P P E L W E R T HA L W A Y S O N7965 East 106th Street, Fishers, IN 46038-2505phone: 317.849.5935 fax: 317.849.5942THIS DRAWING IS NOT INTENDED TO BE REPRESENTED AS A RETRACEMENT OR ORIGINAL BOUNDARY SURVEY, A ROUTE SURVEY OR A SURVEYOR LOCATIONREPORT.CONSTRUCTION SPECIFICATIONS & DETAILSC804 TRANSVERSE CONTRACTION JOINTS TOP OF CURB CURB JOINT DETAIL MAX. 50' TRANSVERSE EXPANSION JOINTS PAVEMENT ***** ***** BOTTOM OF CURB WHEN BUILT IN CONJUCTION WITH CONCRETE PAVEMENT, EXPANSION AND CONTRACTION JOINTS SHALL BE PLACED AT THE SAME LOCATIONS AS IN THE PAVEMENT SLABS. THE CURB AND GUTTER SHALL BE TIED TO THE PAVEMENT BY 1/2" ROUND DEFORMED BARS AT ABOUT 3 FOOT INTERVALS. IF NO CONCRETE PAVEMENT IS BEING BUILT AT THE TIME THE CURB IS CONSTRUCTED, EXPANSION JOINTS SHALL BE PLACED AT THE ENDS OF ALL RETURNS AND AT INTERVALS NOT TO EXCEED 50 FEET. CONTRACTION JOINTS ON TANGENT SECTIONS SHALL BE INSTALLED AT 10 FOOT MAX. SPACING. CONTRACTION JOINTS ON RADII SHALL BE INSTALLED AT 5 FOOT MAX. SPACING. MAX. 50'***** MINIMUM COVER FOR PIPE CROSSINGS OF CITY STREETS: THE MINIMUM COVER FROM THE TOP OF THE INSTALLED PAVEMENT TO THE TOP OF THE TINSTALLED PIPE SHALL BE THE PAVEMENT SECTION, THICKNESS (ALL BITUMINOUS AND AGGREGATE MATERIAL ABOVE THE SUBGRADE) PLUS 1'-0", BUT UNDER NO CIRCUMSTANCES SHALL THE COVER ALONG ANY PART OF THE PIPE FROM THE FINAL PAVEMENT ELEVATION TO THE TOP OF THE PIPE BE LESS THAN 2.5 FEET. NOTE: ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT-OF-WAY SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED CITY RIGHT-OF-WAY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT ALL STATE HIGHWAYS, CITY, AND COUNTY PERMITS HAVE BEEN OBTAINED BY THE DEVELOPER PRIOR TO START OF CONSTRUCTION. SIDEWALK NOTE: 1. ALL TRANSVERSE JOINTS SHALL BE TOOLED OR SAWCUT JOINTS 1/4 THE THICKNESS OF THE CONCRETE SIDEWALK. 2. WALKS ACROSS DRIVEWAYS SHALL BE 6" OR THE THICKNESS OF THE PROPOSED DRIVEWAY WHICHEVER IS THICKER. NOTE: ALL PAVING IS TO BE COMPLETED IN ONE PAVING SEASON. 116TH ST. 50' 5'13'5'13' OTTO LANE KEATON DRIVE KEATON CIRCLE VILLAGE CREEK DRIVE 52' TO 77' 13'13' SPRINGMILL RD.