AEC BKR CARMEL, CLAY TOWNSHIPHAMILTON COUNTY, INDIANA06/16/21File Name:S:\60160JGV-R\DWG\C800 - Construction Details.dwg - C804AModified / By:March 19, 2022 4:24:37 PM / ecarsonPlotted / By:March 19, 2022 5:00:28 PM / Erik CarsonJACKSON'S GRANT VILLAGESECTION 101/18/22CITY OF CARMEL REVIEW COMMENTSAEC03/18/22CITY OF CARMEL & TRICO REVIEW COMMENTSAECDATEMARKREVISIONSBYCERTIFIED:S & A JOB NO.
SHEET NO.
DRAWN BY:CHECKED BY:S T O E P P E L W E R T HA L W A Y S O N7965 East 106th Street, Fishers, IN 46038-2505phone: 317.849.5935 fax: 317.849.5942THIS DRAWING IS NOT INTENDED TO BE REPRESENTED AS A RETRACEMENT OR ORIGINAL BOUNDARY SURVEY, A ROUTE SURVEY OR A SURVEYOR LOCATIONREPORT.CONSTRUCTION SPECIFICATIONS & DETAILSC804A
MINIMUM COVER FOR PIPE CROSSINGS OF CITY STREETS:
THE MINIMUM COVER FROM THE TOP OF THE INSTALLED PAVEMENT TO
THE TOP OF THE TINSTALLED PIPE SHALL BE THE PAVEMENT SECTION,
THICKNESS (ALL BITUMINOUS AND AGGREGATE MATERIAL ABOVE THE
SUBGRADE) PLUS 1'-0", BUT UNDER NO CIRCUMSTANCES SHALL THE
COVER ALONG ANY PART OF THE PIPE FROM THE FINAL PAVEMENT
ELEVATION TO THE TOP OF THE PIPE BE LESS THAN 2.5 FEET.
NOTE:
ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT-OF-WAY
SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF
ENGINEERING. THE CONTRACTOR SHALL CONTACT THE DEPARTMENT OF
ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW
THE DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF
NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN
STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE
DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND
PROPOSED CITY RIGHT-OF-WAY.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT ALL
STATE HIGHWAYS, CITY, AND COUNTY PERMITS HAVE BEEN OBTAINED BY
THE DEVELOPER PRIOR TO START OF CONSTRUCTION.10"24"5-3/4"18" RADIUS
3" TOP SOIL
COMPACTED
BACKFILL
NOTES:
INTEGEGRAL CURB WITH CONCRETE PAVEMENT SHALL BE SIMILAR SHAPE
CURVE ALL EXPOSED SURFACES
DAMPEN SUBGRADE BEFORE PLACING CONCRETE
CONTROL JOINTS EVERY 5' ON RADII OTHERWISE EVERY 10' MAXIMUM. PREFORMED EXPANSION
JOINT EVERY 50' MAXIMUM.
NO BACKFILLING OR COMPACTION MAY OCCUR 12' FROM CURB UNTIL 5 FULL DAYS HAVE
PASSED AFTER PLACING CONCRETE
SHALL CONFORM TO CITY'S CONCRETE CURB POLICY IN ALL RESPECTS
CONCRETE ROLL CURB & GUTTER
NOT-TO-SCALE
(REVERSE LIP)
GUTTER TO FORMED TO
ENSURE DRAINAGE AWAY
FROM CURB
FLOW
CLASS A CONCRETE