HomeMy WebLinkAboutApplication ADLS Date DOCKET NO.
APPLICATION for ARCHITECTURAL DESIGN, LIGHTING, and SIGNAGE
FEE: $500.00
Name of Project: M mem I.1IV ZA Titit,54 Em.cLoluitts
Address: IO41 4 oi_-r0 l'Ilealbusr4 STtzr` Ti IworAtn..pt_i_1 S 1Kinib,Ix. Obi o
Type of Project: Trz.As Er(GL OSv R.(r
Applicant: C5 0 Ern1 cheerer Phone No.3C7- $443-7BOD
Contact Person: --06C1Z,T TL. a SDKS Phone No.3I')- pal;.$-7
Address: ')IBC' ( ,Ys7avE. OtoSSIM 14ucii 240i IhdrnNnp/AAS ( to.4b4 0
Legal Description: To be typewritten on a separate sheet
Area (in acres) f SO tkauss Zoning B 5
Owner of Real Estate: p14 EON t.f. Ott VTvXL LIFE MKS. C.o.
Carmel: V Clay Township: ✓ Annexation:ar N
Other Approvals Needed: Qrnrr4D AOtl,.
PARKING
No. of Spaces Provided: Nils. No. Spaces Required: NJ/k. MO +44
P
Pcoap OIc zeC T
DESIGN INFORMATION
Type of Building:770414 EtneS0 v24 No. of Buildings: I
Square Footage: 3 VZ., Height: &I- I L7 No. of Stories I
Exterior Materials: 4a.,vest (,EI=15 Colors: Gr t
Maximum No. of Tenants: NI A Type of Uses: fl $ (. c1 DSvir
Water by: q 1L Sewer by: dv/A
s : \forms\adls . app revised 01/07/97
--'4111111111111111111.
LIGHTING
Type of Fixture: N)d.. Height of Fixture: N'
No. of Fixtures: N �- Additional Lighting: Ni NO i.4 f it1�s r.4 S�N4 AOD
* Plans to be submitted showing Footcandle spreads at property lines, per Ordinance.
SIGNAGE
No. of Signs: N oav Type of Signs: N a NreE.
Location(s): IUf(•
Dimensions of each sign: N(
Square Footage of each sign: ���►
Total Height of each sign: N��
LANDSCAPING
* Plans to be submitted showing plant types, sizes, and locations
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
I, the rsigned, the best of my knowledge and belief, submit the above information as true and
corr
ACSOctra - / 4Mr efClai<< 6,6 .
Signature of Applicant Title
(Print) Date
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
State of Indiana,
SS:
County of j1 i7l1Azd�1,
Before me the undersigned, a Notary Public for county,
State of Indiana, personally appeared i�-rA � oi( and acknowledged the
execution of the foregoing instrument this /02 t day of W7.7 , 199 P. .
My Commission Expires:
//07 94j),V-dia
Notary Public
s : \forms\adls . app revised 01/07/97
CITY OF CARMEL AND CLAY TOWNSHIP
DEPARTMENT OF COMMUNITY SERVICES (DOCS)
1 Civic Square, Carmel, IN 46032
(317) 571-2417
ARCHITECTURAL DESIGN, LIGHTING SIGNAGE REVIEW AND
DEVELOPMENT PLAN (REVIEW AND APPROVAL)
Procedure for Plan Commission
For zones B-4, B-7, B-8, U.S. 31 Meridian Street Corridor, U.S. 431 Keystone Avenue Corridor and
the U.S.421 Michigan Road Corridor
1. Allow plenty of time for review and approval process (approx.two (2) months).
2. Discuss proposed project with DOCS staff (please call for an appointment to discuss review
procedure and appropriate dates) first week of the month, works the best to begin a project.
3. INFORMATION NEEDED for formal DOCS staff and Plan Commission review:
a. Two copies of formal application with required information
b. Two copies of legal description
c. Two location maps showing location of subject site, zoning and existing land uses of
all adjacent properties.
d. Two copies of a detailed site development plan showing:
1. Detailed drainage plan with drainage calculations. If project is in Clay
Township, take to Kent Ward, County Surveyor(776-9626) and John South,
U.S. Soil Conservation Service (773-1406). If project is in City of Carmel,
discuss with Tom Welch, City Engineer at 571-2441..
2. Lighting plan
- footcandle limits
- type of fixture
- size or fixture
3. Landscaping plan
- location of plantings
- type and sizes of plantings
- planting legend
- planting details
- mounding locations and details
4. Signage plan and details
- size and location
- materials and colors
s : \forms\adls . app revised 01/07/97
111111.
5. Parking plan: Show handicapped spaces/total spaces needed per zone/spaces
proposed
6. Site plan with:
- side,rear and front yard setbacks
- perimeter drainage and utility easements
- sewer and water line locations
- special setbacks or greenbelts
- building square footage
- dimensions of building
-location of mechanical equipment and trash receptacle with screening and
details
- pavement and curbing details
- proposed road improvements
- sidewalks
- loading and dock areas
- fire hydrant and siamese locations
7. Building Elevations (all sides)
- dimensions
- materials and colors
- samples of materials will need to shown at the Plan Commission meeting
- signage location
8. Soils map and floodplain information
9. Technical Advisory Committee correspondence
10. Ifpublic hearing required, list of adjacent property owners two properties deep or
660 feet, whichever is less (obtain from Hamilton County Auditor's office,
Noblesville, Indiana)
4. Once all information is presented to DOCS and a review completed for compliance, a
docket number will be released when the filing fee is submitted.
5. a. If a public hearing is required, mail notices of development plan hearing to adjacent
property owners and put public notice in the Noblesville Ledger at least twenty-five
(25) days prior to the hearing date.
b. At least five (5) working days prior to the hearing the petitioner must submit proof
of publications (2), proof of adjacent property owner notification (both the white
and green cards), and a completed Petitioner's Affidavit of Notice of Public Hearing
to the DOCS.
s : \forms\adls . app revised 01/07/97
6. Petitioner or representative must appear at the Carmel/Clay Plan Commission (public
hearing) and give a presentation. Information should be presented on a poster board so
that it can be seen from 20 feet. In addition, reduced(8-1/2" x 11") packets of the poster
board project information should be handed out for each Plan Commission member.
7. Petitioner or representative must attend the Technical Advisory Committee (TAC)
meeting on the third Wednesday of the month.
8. Petitioner or representative must attend the Special Study committee to review all
pertinent information.
9. Petitioner or representative must attend the second Plan Commission meeting for final
vote (questions may need to be answered).
10. Once Plan Commission has voted on the project, it is up to the petitioner to work with
the staff to obtain proper building permits.
s : \forms\adls . app revised 01507/97