Loading...
HomeMy WebLinkAboutMinutes TAC 07-19-84 ^ ,. -+ o► 1 DEPARTMENT OF COMMUNITY DEVELOPMENT • TECHNICAL ADVISORY COMMITTEE MINUTES Juey 19, 1984 Committee Memberus Pnesent: Steve Couts, Stan Puckett, Chuck K,iphatct, Tom (each, Kent (Qwtd, John South CREEKSIDE SUBDIVISION S.ing&.e Fami y--a-ttached 1.4,41 Petitionercts pnesent: At Oak, Jim Netison, John Lewito eir,;• "-' 444 . pruivate sewett, watett and streets proposed, to be noted in covenant _,i-st.1 no easements needed on 6eweA S wa-etc City will not maintain sewett S watett tines—this will be the respons,ib-IP. ity os the homeownercto' association sewers 8 water tines to be .instatted pert City specs wateit mete't w.itt be City pnopenty, w-Ltt be maintained by -the City do we need spec 6ic easements on hydrant 8 watett? ThLs to be woAked out by Utit ties D-vtecton by August 7, 1984 and so noted on ate ptans I second s.ute hydrtant needed pert appnovae ob Fine Ch-ies--to be amended by August 7, 1984 . site engine wilt use a,L.E noadwa ys inctuding proposed 18' dre,ives - D . 26 I . iJs there a need to .coop water tines? to be detenm.i.ned by City EngLneen and Ut tit.%es D,utecton by August 7, 1984. It . Requested street vaJi ante: much discussion waA heed contemning th.iz matter; the show-i coneensus was agrteed to by TAC membetus 1. TAC membetus would pnesen that the ond.inance be uphe-Pd as written 2. Is the Plan Commission, -Ln their judgment, .6eets that the vaAi.ance requested is vati.d, TAC membetus wou.2d neeomment the soliowing: 22' pavement , with inverted ettown s -'teet; with storm inPetts--no cuttbs on two drti.ves os cul-de-sac . S.idewa ks-deve2open will be nespons.ible son s-ideRratbs inside subdivision and auong Westb-Le.2d Road to edge os petitionett'- prtoperoty tine. . Drta,inage--remove obstttue-lions snom Cartme2 Creek on petiti.onett's prtope-'ty . Gutter water and sump pump to 8" P.V.C. on di test to cheek On att unites . no geo thettmat heat pumps as pen covenants . yattd atteas between units to slope to streets V% put .inlet in center attea os cud.-de- ac TA . put storvn ,inlet at entrance drr i.ve both sides Au T.A.C. Ju'y 19, 1984 Page 2 CREEKS1DF--continued . netenti.on/detenti.on project not needed .in ondeA to not a4kct peak discharge watek gow o 4 Calcine e CAeek . Wes-t(),i.e.ed B.evd. R-D W 50' hats needed . pe it onen needs -to dedicate additiona.e 92 lit. • wee-t4ie.2d Btvd. .ttraWc show existing and proposed West4ietd B vd. R-O-G! • peti tionen showed be AegwIAed -to put in passing bt is-teA on west side o4 Wesxli.ietd B.evd. same distance as one on east wit need addition. R-O-f'l T.A.C. gives -techn icat appnova,e pen att above being .inconponated into pan by August 7, 1984, inceud.ing Finat Pta . WO0DCREEK Petitc:onen present: Dave Benny . otiginae.. F.inat P.ea.t approved Novembeh 26, 1979 • sidewatks both sides shown on F-inat plan . san,i tarry sewer, watetc, some storm sewers are .ins.tatted . sanitary sewetrs, storm sewers and wwteA to be ceeaned and tested . need manho.ees -instated at 6oun £oca ions by tots 133, 114, 113 and 108 . when base toads are .instaeeed in Section III, peti ionen w.i i ,ins,ta t .6inat coat os as phc t .in Sections I g II yet -this yeah wateA .dine -eoop to be -n to led pen plans annexation ,is in pnogness NO building penm.i wilt be -issued untie annexation iz eomp.eete. Aoad bindetc must be down be4one Department o6 Community Devetopmevtt witt ,issue any bwieding pehmits in any subdivision aee tots to have diAect on. pen easement access to storm sewer dolt sump pumps and geo thetrmae heat pumps no retention/detention need enos.ion contAo.t plan on p.eans recommends appnovae pelt above nequinements being .ineonpon.ated in a t plans by ,us-t 7, 1984