Loading...
HomeMy WebLinkAboutM004.0 - TRUSS LAYOUTStart 2' O.C. Spacing Start 2' O.C. Spacing Start 2' O.C. SpacngStart 2' O.C. Spacing Start 2' O.C. Spacing Start 2' O.C. Spacing Start 2' O.C. Spacing Start 2' O.C. SpacingStart 2' O.C. Spacing Start 2' O.C. Spacing Start 2' O.C. Spacing Start 2' O.C. SpacingTruss Connector Total List Manuf Product Qty MiTek HUS26 21 MiTek HJC26* 1 MTek JUS26* 1 MiTek RT7A* 100 LAY1 C01M06M04M03M02M01J02J03J04 M07M07HJC26 JUS26 (3) C02 (8) M05 (3) J01(6) M08(6) EB01(12) HUS26 B03 B01 F02 F01 (9) HUS26D01 E01E02A01A04D03 V01 V02 V03 V04 V05 V06 V07 V08 (5) B02(2) D02(3) A02 (9) A03 35-10-0 10-4-0 17-8-0 7-10-0 3-10-8 6-5-8 60-0-05-0-052-0-025-4-021-8-01-0-0 4-0-03-0-035-10-0 5-0-020-4-07-10-028-0-0 12-6-012-8-0 1-0-01-10-060-0-05-0-052-0-03-0-030-8-016-4-0 5-0-0 1-10-0 3-2-010-3-020-5-04-7-015-10-010-01-0-81-8-8 6-810-8 IMPORTANT THIS DRAWING IS FOR FIELD PLACEMENT OF INDIVIDUAL COMPONENTS ONLY, AND DOES NOT CONSTITUTE AN ENGINEERED DOCUMENT. NOTE PROPER BEARING AND BEARING DESIGN INCLUDING ANCHORAGE, IS THE RESPONSIBILITY OF THE BUILDING DESIGNER, ARCHITECT AND / OR BUILDING ENGINEER. REFER TO INDIVIDUAL TRUSS DESIGNS FOR REACTIONS, MINIMUM REQUIRED BEARING SIZE, UPLIFT, AND ADDITIONAL LOADS. 84 COMPONENTS DOES NOT ASSUME RESPONSIBILITY IN THESE AREAS OF CONCERN. BRACING ERECTION, TEMPORARY, AND PERMANENT BRACING IS THE RESPONSIBILITY OF THE CONTRACTOR AND / OR BUILDING DESIGNER. REFER TO INDIVIDUAL TRUSS DESIGNS FOR ADDITIONAL BRACING REQUIREMENTS. REFER TO BCSI-B1 SUMMARY SHEET. THE STRUCTURAL BUILDING COMPONENTS ASSOCIATION COMMENTARY, AND RECOMMENDATIONS FOR HANDLING, INSTALLING & BRACING METAL PLATE CONNECTED WOOD TRUSSES.www.sbcindustry.com INSTALLATION DO NOT CUT, DRILL, OR ALTER TRUSSES. ANY QUESTIONS CALL 84 COMPONENTS. PROPER INSTALLATION, AND HANDLING OF COMPONENTS IS THE RESPONSIBILITY OF THE ERECTING CONTRACTOR. 84 COMPONENTS MUST BE NOTIFIED OF ANY PROBLEMS, AND AFFORDED THE OPPORTUNITY TO REVIEW, AND MAKE NECESSARY CORRECTIONS, OR NO BACK CHARGES WILL BE ACCEPTED OR APPROVED. WARNING WARNINGS, AND INSTRUCTIONS FOR ERECTION OF COMPONENTS ARE INCLUDED IN THE DELIVERY PACKAGE. KEEP THIS INFORMATION ON THE JOB SITE. THESE DOCUMENTS WILL ALSO BE NEEDED FOR JOB SITE INSPECTION. MISUSE AND IMPROPER INSTALLATION OF COMPONENTS MAY RESULT IN FAILURE, BODILY INJURY, LOSS OF PROPERTY, AND / OR LIFE. Roof Area: Overhang Length: Eave Length: Hip Length: Valley Length: Ridge Length: SHEET NUMBER: R1.1 Roof Truss Placement Plan SCALE: NTS Job#: 2200212-2200212A PO#: Date: 4/19/2022 Drawn By: MM Designed By: MM Checked By: ROOF LOADS: TCLL: 20.0 lb/ft² TCDL: 10.0 lb/ft² BCLL: 0.0 lb/ft² BCDL:10.0 lb/ft² Building Code: IRC 2012 Wind Speed: 115 mph On-Center Spacing: 24" U.N.O. 2339.19 SF 172.83 LF 210.74 LF 16.22 LF 73.74 LF 85.67 LF ROOF DATA THIS LAYOUT IS INTENDED FOR THE PURPOSE OF TRUSS LOCATION AND PLACEMENT ONLY. REFER TO THE BUILDING PLANS FOR ACTUAL BUILDING CONSTRUCTION.TG43Berkeley,ROOF TRUSS PLACEMENT PLAN2200212-2200212A1850 N Graham RoadFranklin, Indiana 46131Office:(317) 346-4274Fax: (317) 346-0916