HomeMy WebLinkAboutResolution_BPW_06-01-22-07_PRIF_Agreement_-_1st_on_Main_-_Add-onRESOLUTION NO. BPW 06-01-22-07
A RESOLUTION REQUESTING THE PROVISION OF CERTAIN INFRASTRUCTURE
OR OTHER IMPACT ZONE IMPROVEMENTS IN LIEU OF AND AS A CREDIT
AGAINST THE PAYMENT OF PARKS AND RECREATION IMPACT FEES (“PRIF”)
AND APPROVING A PRIF CREDIT AGREEMENT
WHEREAS, Indiana Code 36-7-4-1335 permits the application of a credit against the payment of
impact fees for persons who construct or provide certain infrastructure or other improvements of a type for
which a unit imposes an impact fee in an impact zone; and,
WHEREAS, City of Carmel Unified Development Ordinance 1.30(F) permits the City of Carmel
Board of Public Works and Safety (“Board”) to request that any person otherwise required to pay PRIF to
instead finance, construct, and dedicate certain infrastructure or improvements in the Parks and Recreation
Infrastructure Impact Zone (“Impact Zone”) located in Clay Township, Indiana and over which the City of
Carmel, Indiana (“City”) exercises planning and zoning jurisdiction; and,
WHEREAS, City of Carmel Unified Development Ordinance 1.30(F) also permits the Board to
determine the amount of PRIF credit any person requested to finance, construct, and dedicate certain
infrastructure or improvements in the Impact Zone in lieu of PRIF payment shall receive, and to memorialize
this determination in a credit agreement (“Credit Agreement”); and,
WHEREAS, the Board now desires to request that Lot One Partners, LLC, an Indiana limited
liability company (“Lot One Partners”), finance and construct, within two (2) years of which this Resolution
is approved by the Board (the “End Date”), those certain infrastructure and improvements set forth on
attached Exhibit A, the same being incorporated herein by this reference, in exchange for a PRIF credit the
Board has determined should be in the amount of exactly One Hundred Twenty Seven Thousand, Seven
Hundred Ninety Six Dollars ($127,796.00); and,
WHEREAS, Lot One Partners covenants that the infrastructure and improvements set forth in
Exhibit A shall remain open to the public for their use and enjoyment in perpetuity; and,
WHEREAS, Lot One Partners shall maintain, repair and replace, at its sole cost and expense, the
infrastructure and improvements set forth in Exhibit A as necessary and to the satisfaction of the City, in
perpetuity; and,
WHEREAS, Lot One Partners, shall execute and return to the Board, by and through the Carmel
Office of Corporation Counsel, the Credit Agreement set forth on attached Exhibit B, the same being
incorporated herein by this reference, prior to the issuance of the improvement location fee for that ce rtain
improvement identified on attached Exhibit C, the same being incorporated herein by this reference; and
WHEREAS, PRIF in the amount of $127,796.00 is due and owing by Lot One Partners to the City
by virtue of that certain improvement identified on attached Exhibit C (the “Targeted PRIF”); and,
WHEREAS, Lot One Partners’ obligation to pay the Targeted PRIF to the City shall be held in
abeyance until the earlier of the acceptance by the Board, in its sole discretion, of the infrastructure or
improvements set forth on attached Exhibit A (“Board Acceptance”) or the End Date. Upon Board
Acceptance, the City shall promptly enter the credit identified herein against Lot One Partners’ Targeted
PRIF obligations. If Board Acceptance does not occur by the End Date, no credit shall be entered against
the Targeted PRIF and the same shall thereafter become immediately due and owing to the City.
By Jon Oberlander at 2:33 pm, May 31, 2022
DocuSign Envelope ID: BFEF0FAF-F3CA-45F8-B4C9-F77A2E2A819A
NOW, THEREFORE, BE IT RESOLVED by the Board of Public Works and Safety of the City
of Carmel, Indiana as follows:
1. The foregoing Recitals are incorporated herein by this reference.
2. The Board hereby requests that Lot One Partners, LLC finance and construct those certain
infrastructure and improvements set forth on attached Exhibit A, in exchange for a PRIF credit of exactly
$127,796.00, pursuant to the terms and conditions set forth hereinabove.
3. The Board hereby approves the Credit Agreement in the form as set forth in attached Exhibit B.
4. That Henry Mestetsky, on behalf of the City and the Board, is hereby authorized and directed to
take such actions as are lawful, necessary, and proper to effectuate the transaction approved by this
Resolution.
SO RESOLVED.
Approved and adopted this ________ day of __________________, 2022.
CARMEL BOARD OF PUBLIC WORKS AND SAFETY
By:
__________________________________
James Brainard, Presiding Officer
Date:______________________________
__________________________________
Mary Ann Burke, Member
Date:______________________________
__________________________________
Lori S. Watson, Member
Date:______________________________
ATTEST:
__________________________________
Sue Wolfgang, Clerk
Date:______________________________
DocuSign Envelope ID: BFEF0FAF-F3CA-45F8-B4C9-F77A2E2A819A
June1st
6/3/2022
6/3/2022
6/3/2022
6/3/2022
-
-
2022-02-03
CONTACT
(YYYY-MM-DD)
CONSULTANTTITLE:DRAWING NO.(YYYY-MM-DD)
DATEREV.DESCRIPTION
PROJECT:
DATE TITLE:CERTIFIED BY:
CONSULTANT
JOB NUMBER
SHEETOFTELEPHONE:
LAUTH GROUP, INC.
PROJECT:
CONTACT:
PROJECT NUMBER:
STATE NUMBER:
E-MAIL:
FAX:
2022-02-03 ISSUED FOR PERMIT
1ST ON MAIN
OVERALL DEVELOPMENT
41 N. RANGELINE ROAD
CARMEL, INDIANA 46032
1ST ON MAIN
KEN STROKE
317.848.6500
317.848.6511
kstroke@lauth.netL100100% SITE LAYOUT PLAN
SITE LAYOUT PLAN1 DETAIL REVISIONS2022-02-07Clock, foundation, and plantingsBenches(Typ.) 5 thisAreaPlanters (Typ.)4 this areaPlaza stair &rampsLarge planting areasBenches (Typ.) 7 This areaRectangular planters (Typ.) 4 this areaSquare planters (Typ.) 11 this areaOverhead string lightsMulti-color paver system running length ofLinear ParkMulti-color,patterned paversystemLarge Planting AreaClouded area included in the PRIFAgreement dated 6-1-2022.Exhibit A:1st on Main PRIF AgreementDocuSign Envelope ID: BFEF0FAF-F3CA-45F8-B4C9-F77A2E2A819A
10 West Carmel Drive, Suite 100 • Carmel, IN • 46032 • 317.848.6500
www.lauth.net
1st On Main
5/13/2022
Est. Linear Public
Qty Total Park Plaza
Clock Foundation &
conduit 1 $ 12,500 $ 12,500
Linear Park Conc. Paving 2200 $ 15,400 $ 15,400
Pavers 5800 $ 102,300 $ 92,300 $ 10,000
Plaza Stairs 1 $ 18,000 $ 18,000
Benches 12 $ 23,500 $ 16,450 $ 7,050
Planters 35 $ 6,800 $ 3,600 $ 3,200
Planting Beds 1 $ 55,500 $ 55,500
Totals $ 234,000 $ 183,250 $ 50,750
Exhibit A:
1st on Main PRIF Agreement
DocuSign Envelope ID: BFEF0FAF-F3CA-45F8-B4C9-F77A2E2A819A
DocuSign Envelope ID: BFEF0FAF-F3CA-45F8-B4C9-F77A2E2A819A
833.06
829.80830.76831.33
833.75835.25835.25835.25835.67
A201
SCALE:
03 NORTH ELEVATION
3/32" = 1'-0"BuildingElevationsApartmentsLIMIT OF PROJECT SCOPESCALE:
01 SOUTH ELEVATION
3/32" = 1'-0"SCALE:
02 EAST ELEVATION
3/32" = 1'-0"LIMIT OF PROJECT SCOPE20063
Dec. 17, 20211st on MainCarmel, INIssued for Bid/Permit
MATERIAL LEGENDDIMENSIONAL ASPHALT SHINGLES
FIBER CEMENT PANEL, SMOOTH FINISH, FIELDPAINTED, WITH PREFINISHED ALUMINNUM TRIMMANUFACTURER: JAMES HARDIEBRICKMANUFACTURER: PALMETTO BRICK CO.EIFS- SEE ELEVATIONS
MC METAL COPING. COLOR TO MATCH ADJACENT TRIM/MATERIAL.
PMB PREFIN/PREFAB METAL BALCONY
MR METAL RAILING
FCT FIBER CEMENT TRIM
AS ASPHALT SHINGLES
PSA PREMANUFACTURED STONE ACCENT
BSC BRICK SOLDIER COURSE
CSB CAST STONE BANDING
MG MECHANICAL GRILLE
BRICK SOLDIER COURSEMANUFACTURER: PALMETTO BRICK CO.EXTERIOR FINISH KEYEXTERIOR PAINT COLOR FINISHPAINT COLOR - SHERWIN WILLIAMSSW 7048 - "URBANE BRONZE"P1P2P3 PAINT COLOR - SHERWIN WILLIAMSSW 6147 - "PANDA WHITE"PAINT COLOR - SHERWIN WILLIAMSSW 9088 - "UTAUPEIA"
ALL FIBER CEMENT PANEL TO BE P21
2
3
B1 BRICK COLOR 1PALMETTO BRICK COMPANYCOLOR 'CHOCOLATE' (OR EQ.)B2 BRICK COLOR 2PALMETTO BRICK COMPANYCOLOR 'WHITESTONE' (OR EQ.)B3 BRICK COLOR 3PALMETTO BRICK COMPANY
COLOR '.75 GREYSTONE' (OR EQ.)
BRICK SOLDIER COURSE TO BE B1
CSC CAST STONE CORNICE
EC EIFS CORNICE
PJB PREFIN/PREFAB METAL JULIET BALCONY
BCJ BRICK CONTROL JOINT
CSP CAST STONE PILASTER
BRM BRICK MOLDING
DS DOWNSPOUT
PB PREMANUFACTURED BALUSTRADE
EIFS WINDOW TRIM TO BE P1
SEALREVISIONSSECOND FLOOR
+14'-5 1/8"
THIRD FLOOR
25'-1 1/8"
W1
MC
W1
W1 W1
W1
W1 W1
W1
W1
W1
10'-718"10'-8"10'-8"FOURTH FLOOR
35'-9 1/8"
FIRST FLOOR
+3'-10"2'-0"1'-0"10"SECOND FLOOR
+14'-5 1/8"
THIRD FLOOR
25'-1 1/8"10'-718"10'-8"10'-8"FOURTH FLOOR
35'-9 1/8"
FIRST FLOOR
+3'-10"
SECOND FLOOR
+14'-5 1/8"
THIRD FLOOR
25'-1 1/8"
FOURTH FLOOR
35'-9 1/8"
FIRST FLOOR
+3'-10"10'-718"10'-8"10'-8"01
A301
TRUSS BEARING
EL: 47-1 1/8"11'-4"EC
TRUSS BEARING
EL: 47-1 1/8"11'-4"W2W2W2W2W3
W3
W3 W3
W1*W1*
W1*W1*
W1*
W1*
W1*
W1*W1*W1*
W2*W2*W2*
W1*W1*W1*
W1*W1*W1*
W3 W3 W3 W3 W3 W3 W3
W1*
W1*W1*
W1*
W1*
W1*
W2*W2*W2*W2*W2*
W3 W3 W3
W1*W1*W1*
W1*W1*W1*
TRUSS BEARING
EL: 47-1 1/8"
W3W3W3W3W3
W1*W1*
W1*W1*
W1*W1*
W1*W1*
W1*W1*
W1*W1*W1*W1*W1*W1*
W1*
W1*
W1*
PMB
PJBBSC
EC
BCJ
BCJ
W5
W5
W5
BCJ
FIBER CEMENT PANEL3'-6"FIBER CEMENT PANEL
01
A301
SIM
B1
P3
P1
P2
01
A302
03
A302
01
A301
SIM.
MC
PMB PJB
MR
BSC
BSC
B1
P3
P1
P2
B3
B2
P2 P3 P1
B2 B3 B1
P2 P2
1st on Main PRIF Agreement, Exhibit C:Multi Family Building: 35 unitsCondo Building: 8 unitsTotal Residential units: 43 unitsDocuSign Envelope ID: BFEF0FAF-F3CA-45F8-B4C9-F77A2E2A819A
829.80
832.50 832.50
832.50
AC201
SCALE:
03 NORTH ELEVATION
3/32" = 1'-0"Building ElevationsCondominiums20063
Dec. 17, 20211st on MainCarmel, INIssued for Bid/Permit
MATERIAL LEGENDDIMENSIONAL ASPHALT SHINGLES
FIBER CEMENT PANEL, SMOOTH FINISH, FIELDPAINTED, WITH PREFINISHED ALUMINNUM TRIMMANUFACTURER: JAMES HARDIEBRICKMANUFACTURER: PALMETTO BRICK CO.EIFS- SEE ELEVATIONS
MC METAL COPING. COLOR TO MATCH ADJACENT TRIM/MATERIAL.
PMB PREFIN/PREFAB METAL BALCONY
MR METAL RAILING
FCT FIBER CEMENT TRIM
AS ASPHALT SHINGLES
PSA PREMANUFACTURED STONE ACCENT
BSC BRICK SOLDIER COURSE
CSB CAST STONE BANDING
MG MECHANICAL GRILLE
BRICK SOLDIER COURSEMANUFACTURER: PALMETTO BRICK CO.EXTERIOR FINISH KEYEXTERIOR PAINT COLOR FINISHPAINT COLOR - SHERWIN WILLIAMSSW 7048 - "URBANE BRONZE"P1P2P3 PAINT COLOR - SHERWIN WILLIAMSSW 6147 - "PANDA WHITE"PAINT COLOR - SHERWIN WILLIAMSSW 9088 - "UTAUPEIA"
ALL FIBER CEMENT PANEL TO BE P21
2
3
B1 BRICK COLOR 1PALMETTO BRICK COMPANYCOLOR 'CHOCOLATE' (OR EQ.)B2 BRICK COLOR 2PALMETTO BRICK COMPANYCOLOR 'WHITESTONE' (OR EQ.)B3 BRICK COLOR 3PALMETTO BRICK COMPANY
COLOR '.75 GREYSTONE' (OR EQ.)
BRICK SOLDIER COURSE TO BE B1
CSC CAST STONE CORNICE
EC EIFS CORNICE
PJB PREFIN/PREFAB METAL JULIET BALCONY
BCJ BRICK CONTROL JOINT
CSP CAST STONE PILASTER
BRM BRICK MOLDING
DS DOWNSPOUT
PB PREMANUFACTURED BALUSTRADE
EIFS WINDOW TRIM TO BE P1
SEALREVISIONSLIMIT OF PROJECT SCOPESCALE:
01 SOUTH ELEVATION
3/32" = 1'-0"SCALE:
02 WEST ELEVATION
3/32" = 1'-0"
SCALE:
04 EAST ELEVATION
3/32" = 1'-0"
MC
SECOND FLOOR
+14'-4 5/8"
THIRD FLOOR
25'-0 5/8"10'-8"FOURTH FLOOR
+35'-8 5/8"
FIRST FLOOR
+1'-6" (833.50)10'-8"12'-1058"W2
W1
W2
W1
W8
W5*W10
W6 W6W6W5*W5*
W1*
W2*W10*W5*W5*W5*W5*W5*W5*
W7
W7
W12
W11
W11
W12
W4*W11W11W9*W9*W4*W4*W4*W4*
W4*W4*W4*W4*W4*W4*W9*W9*
W10*W10*
W13
W3*W5*W5*W5*W14
W9 W9
W5*W5*W5*
W1*
W10*
W1*
W2*
W3*
W1*
W4*
01
AC301
01
AC302
01
AC302
SIM.
01
AC303
ROOF TRUSS BRG
+48'-0"12'-338"FIBER CEMENT PANEL
FIBER CEMENT
PANEL
FIBER CEMENT
PANEL
MC
MC
PJB PJB PJB
PJB
PMB
PMB
PMB
PMB
PMB
PJB
MR
MR
MR MR
AS
AS
DS
PB
EC
BSC
01
AC304
CSP
PB
CSCPSA
LIMIT OF PROJECT SCOPECSB
CSC
PB
SECOND FLOOR
+14'-4 5/8"
THIRD FLOOR
25'-0 5/8"
FOURTH FLOOR
+35'-8 5/8"
FIRST FLOOR
+1'-6" (833.50)
ROOF TRUSS BRG
+48'-0"
SECOND FLOOR
+14'-4 5/8"
THIRD FLOOR
25'-0 5/8"
FOURTH FLOOR
+35'-8 5/8"
FIRST FLOOR
+1'-6" (833.50)
ROOF TRUSS BRG
+48'-0"
SECOND FLOOR
+14'-4 5/8"
THIRD FLOOR
25'-0 5/8"
FOURTH FLOOR
+35'-8 5/8"
FIRST FLOOR
+1'-6" (833.50)
ROOF TRUSS BRG
+48'-0"LIMIT OF PROJECT SCOPECSB
CSC
CSC
PB
CSC
CSB
LEVEL 1 GARAGE STAIR LANDING
+1'-6" (833.50)
LEVEL 2 GARAGE STAIR LANDING
+14'-6"
LEVEL 3 GARAGE STAIR LANDING
+25'-2"
LEVEL 4 GARAGE STAIR LANDING
+35'-10"
LEVEL 5 GARAGE STAIR LANDING
+46'-6"
LEVEL 1 GARAGE STAIR LANDING
+1'-6" (833.50)
LEVEL 2 GARAGE STAIR LANDING
+14'-6"
LEVEL 3 GARAGE STAIR LANDING
+25'-2"
LEVEL 4 GARAGE STAIR LANDING
+35'-10"
LEVEL 5 GARAGE STAIR LANDING
+46'-6"
B1
B2
B3
P2P3P1
B1
B2
P2P2
P2
3'-6"3'-6"1st on Main PRIF Agreement, Exhibit C:Multi Family Building: 35 unitsCondo Building: 8 unitsTotal Residential units: 43 unitsDocuSign Envelope ID: BFEF0FAF-F3CA-45F8-B4C9-F77A2E2A819A