AS -BUILT RIM = 802.36
MH-SOM024
AS -BUILT RIM = 802.39
LOT 27 SUNRISE ON THE MONON
CARMEL, INDIANA
1484 WINDPUMP WAY
�F
l
�F `P
F
O.c, O �ao�O,nO
GRAPHIC SCALE
0 15 30 60
SCALE :. 1 " = 30'
� o
LEGEND
SURFACE FLOW DIRECTION
S.D. & U.E. SANITARY, DRAINAGE &
UTILITY EASEMENT
D. & U.E. DRAINAGE & UTILITY EASEMENT
U.E. UTILITY EASEMENT
FYS FRONT YARD SETBACK
SYS SIDE YARD SETBACK
PLAN GRADE
'SEE SHEET 2 FOR ADDITIONAL DETAILS & NOTES*
_ 6/01/2017
.:# LS20500017 DATE: .0
FOR: OLD TOWN DESIGN GROUP
BY: JD HALL LAND SURVEYING
803S. OHIO STREET
SHERIDAN, INDIANA 46069
Phi.317-696-3594
Fz: 317-756-5510
NO! 17-006'(29) SHEET
A - KENTUCKY BLUEGRASS 100 LBS/ACRE; CREEPING'ROD FESCUE 100 LBS./ACRE:
PLUS 2 TONS STRAW NULCN/ACRE, OR ADD ANNUAL RYEGRASS 20 LBS/ACRE
B - KENTUCKY BLUEGRASS 120 LM/ACRE; CREEPING RED FESCUE 120 LBS./ACRE:
PLIES 2 TONS STRAW MULCH/ACRE. OR ADD ANNUAL RYEMASS 30 LBS/ACRE
C - SPRING OATS 3 BUSHELS/ACRE
D - WHEAT OR RYE 2BUSHELS/ACRE
E - ANNUAL RYEGRASS ID LBS./ACRE ( 1 LB/10DO SO. FT. )
F - SOD
O - STRAW MULCH 2 TONS/ACRE
-/I/- - IRRIGATION NEEDED DARING AINE .SILT. AUGUST AND/OR SEPTEMBER
" a IRRIGATION. NEEDED FOR 2 TO 3 WEEKS AFTER SUPPLYING SOD
SEEDBED, PREPARATION: FOR PERMANENT SEEDING:
LRSr a TO orm"W PH AND uUnR T iEYFLS.
(CONTACT COUNTY Brm M COOFERAOM 11xi61mw arIm FOW ASSISTANCE AND
SOBS N0011IA11OK INg30010 AVAJLAB1E 111031M0 SERMOS)
iro S131. I F UMSW=SW Im SPEOEIDmE IDI S,TO BE S4. APTLY LINE ACCONO
3.. FBITILM'a I1ECOWETOED BY nE S4 TEST. IF 110E1•NO WAS Nor DOS CONSIDER
APPL11110 A 100 fti OF 12-,2-,2.A 101$ OR. EUWNEiI11.. FWRID1t
C 111 TOP Sm TO OBMDI:A LYDOBI SFIDBEp,. WORKING THE FERIAND .0 E INTO
THE SOL 2-I FOQ O WITH A DISK OL A MAKE OfRA= A01®.1K SILPC
RULE 5 REQUIRES ALL DBRDffD AREAS LIKELY TOO p2R FOR SHALL NAM: SURFACE
STABIIIAOIIN APPLIED W1R/1 2GTIER.mDLTIONG gEVpNT AAM m00MT10N LAY, GRASS
Or THEN x/AC IOA'RIL BE USED m 11382E GROUND,i STABLID.. IEMIM- C ARE MEL
r NON WOVEN SPACE POSTS�PER
GEOTEKTILE MANUFACTURER
FABRIC RECOMMENDATIONS
'Z 7=II=1 I 1 i3 ItT�1.1 III I_117Tii11-
I1mo�-1
�1
��DI
TO
SURFACE
WIRE
NOTE
FILTER FABRIC
.tl
WOO) POST POSTSSHALL HAVE A. MINIMUM LENGTH OF
36 INCHES PLUS BURIAL DEPTH. POST: MATERIAL
FLOW
SHALL BE WOOD. STEEL.. OR SYNTHETIC.. AND SHALL
BE OF SUFFICIENT STRENGTH TO RESIST DAMAGE
DURING INSTALLATION AND TO SUPPORT APPLIED
ry
LOADS.
I I 1 I1-i
FABRIC SHALL BE A WOMENGEOTExTILE FABRIC
CONSISTING RESISTANTMATERIALS STRONG; ROT ERIORA O
M FROM
I11
1 I t'
11 if
{ 1 fl ULTRAVIOLET ANDHEAT. EIPOSURETIN
SILT FENCE CONSTRUCTION
NTS
MAINTENANCE:
1. LAND ALTERATION WHICH STRIPS THE LAND OF
VEGETATION, INCLUDING REGRADING; SHALL BE ,DONE IN A
WAY THAT WILL MINIMIZE EROSION;
2. CONTRACTOR SHALL COMPLY WITH ALL STATE AND
LOCAL ORDINANCES THAT APPLY.
3. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE
AS THE CONTRACTOR SHALL TAKE ALL NECESSARY
PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING
THE SITE.
4. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES
WILL BE INSTALLED IF DEEMED NECESSARY BY ON SITE
INSPECTION. I
5. SEDIMENT LADEN WATER SHALL 'BE; DETAINED BY
EROSION CONTROL PRACTICES AS NEEDED TO MINIMIZE
SEDIMENTATION IN THE RECEIVING STREAM. NO 'STORM
WATER SHALL BE DISCHARGED FROM THE SITE IN A
MANNER THAT CAUSES EROSION AT THE POINT OF
DISCHARGE.
6. WASTES' AND UNUSED BUILDING ,MATERIALS SHALL NOT
BE ALLOWED TO BE CARRIED FROM THE SITE BY STORM
WATER RUNOFF. PROPER DISPOSAL OF ALL WASTES AND
UNUSED BUILDING MATERIALS IS REQUIRED:
T
z'
S I
I '-
Aoi NIMMUI NON 1110MEN EASIING GROUND
G:OIEKTILE FABRIC_ LINE.
I m
EXISTING GROUND—_�
STABILIZED CONSTRUCTION ENTRANCE
NTS SITE PLAN
7. SEDIMENT BEING TRACKED ONTO PUBLIC OR' PRIVATE LOT 27 SUNRISE ON THE MONON
ROADWAYS SHALL BE MINIMIZED. CLEARING OF' CARMEL, INDIANA
ACCUMULATED SEDIMENT SHALL NOT INCLUDE FLUSHING' 14843WINOPUMP WAY
WITH WATER. CLEARED SEDIMENT SHALL BE 'RETURNED TO Eoro'
THE SITE FOR DISPOSAL. Erosion and sedimentplan.residential
for this lot, shall, at previously includes
row d SW the following measures and at all times follow the
guidelines for Individual residential lots and the ,previously approved SWPPP for CARMEL:
S. SOIL WHICH HAS ACCUMULATED NEXT TO. EROSION 1) Install and maintain a stablelconstruction site access at the location of the proposed drive.
CONTROL DEVICES SHALL BE COLLECTED AND
REDISTRIBUTED ON SITE ,AFTER EACH RAINFALL EVENT, AND 2) Install and maintain an appropriate perimeter erosion and -sediment control measures prior to land disturbance, ie silt
AT LEAST ONCE' A WEEK. fence.
9. IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD
BE INTERRUPTED' BY WEATHER, OR ,NIGHTFALL, THE PIPE
ENDS SHALL BE COVERED WITH FILTER FABRIC.
10. ALL EXISTING STRUCTURES, FENCING, TREES AND 'ETC.,
WITHIN CONSTRUCTION AREA SHALL BE REMOVED AND
DISPOSED OF OFFSITE. BURNING IS NOT ALLOWED ON SITE.
11. SCHEDULE OF EARTHWORK ACTIVITIES:
a) THE DURATION OF TIME WHICH AN AREA 'REMAINS
EXPOSED SHALL BE KEPT TO A ,PRACTICAL 'MINIMUW THE
AREA SHALL BE STABILIZED AS':SOONI: AS POSSIBLE
TEMPORARY VEGETATION OR MULCHING SHALL BE'USED TO
PROTECT EXPOSED AREAS IF PERMANENT VEGETATION
CANNOT' BE SEEDED WITHIN 15 DAYS i0R ACTIVITY CEASES
FOR MORE THAN 15 DAYS OR AS, DIRECTED BY 'THE
ENGINEER. '
b) TOPSOIL REPLACEMENT SHALL TAKE PLACE 'FROM
MARCH 1 TO OCTOBER 31. STOCKPILE TOPSOIL AT ALL
OTHER TIMES OF THE YEAR. 'PERMANENT :AND FINAL .
VEGETATION AND STRUCTURAL EROSION CONTROL DEVICES
SHALL BE INSTALLED WITHIN SEVEN (7) DAYS AFTER FINAL
GRADING OR AS SOON AS POSSIBLE:_
3) Minimize sediment discharge and tracking from the lot
4) Clean-up 'sediment that is either tracked or washed onto .roads. Bulk Gearing of, sediment shall not include flushing
the area with water. Cleared sediment must be redistributed or disposed of in a manner that is in compliance with all
applicablestatutes and rules.
5) Adjacent lots disturbed by an individual lot operator must be repaired and stabilized with temporary or permanent
surface stabilization.
6) Self -monitoring program plan and procedures per the previous approved SWPPP shall be followed all individual lot
construction.
7) Additional erosion/sediment control measures may be required upon inspection by local planning authority
8) 1 hereby certify that this individual lot plan inconsistent with the storm water management permit, as approved by
CARMEL,. for SUNRISE ON THE MONON.
09/22/2017
LS20500017 DATE: `p�\�Yst(ItDN)prF!Qi''
FOR:'OLD,TOWN DESIGN'GROUP
BY:WDHALL LAND SURVEYING
803 S. OHIO STREET
SHERIDAN,. INDIANA 46069
Ph: 317496-3594
Fx: 317-758-5510
ST
_ No.
LS20500017''
STATE OF .
SHEET 2OF,