Loading...
HomeMy WebLinkAboutSite PlanMH-SOM014 / AS -BUILT RIM = 802.36 MH-SOM024 AS -BUILT RIM = 802.39 LOT 27 SUNRISE ON THE MONON CARMEL, INDIANA 1484 WINDPUMP WAY �F l �F `P F O.c, O �ao�O,nO GRAPHIC SCALE 0 15 30 60 SCALE :. 1 " = 30' � o LEGEND SURFACE FLOW DIRECTION S.D. & U.E. SANITARY, DRAINAGE & UTILITY EASEMENT D. & U.E. DRAINAGE & UTILITY EASEMENT U.E. UTILITY EASEMENT FYS FRONT YARD SETBACK SYS SIDE YARD SETBACK PLAN GRADE 'SEE SHEET 2 FOR ADDITIONAL DETAILS & NOTES* _ 6/01/2017 .:# LS20500017 DATE: .0 FOR: OLD TOWN DESIGN GROUP BY: JD HALL LAND SURVEYING 803S. OHIO STREET SHERIDAN, INDIANA 46069 Phi.317-696-3594 Fz: 317-756-5510 NO! 17-006'(29) SHEET A - KENTUCKY BLUEGRASS 100 LBS/ACRE; CREEPING'ROD FESCUE 100 LBS./ACRE: PLUS 2 TONS STRAW NULCN/ACRE, OR ADD ANNUAL RYEGRASS 20 LBS/ACRE B - KENTUCKY BLUEGRASS 120 LM/ACRE; CREEPING RED FESCUE 120 LBS./ACRE: PLIES 2 TONS STRAW MULCH/ACRE. OR ADD ANNUAL RYEMASS 30 LBS/ACRE C - SPRING OATS 3 BUSHELS/ACRE D - WHEAT OR RYE 2BUSHELS/ACRE E - ANNUAL RYEGRASS ID LBS./ACRE ( 1 LB/10DO SO. FT. ) F - SOD O - STRAW MULCH 2 TONS/ACRE -/I/- - IRRIGATION NEEDED DARING AINE .SILT. AUGUST AND/OR SEPTEMBER " a IRRIGATION. NEEDED FOR 2 TO 3 WEEKS AFTER SUPPLYING SOD SEEDBED, PREPARATION: FOR PERMANENT SEEDING: LRSr a TO orm"W PH AND uUnR T iEYFLS. (CONTACT COUNTY Brm M COOFERAOM 11xi61mw arIm FOW ASSISTANCE AND SOBS N0011IA11OK INg30010 AVAJLAB1E 111031M0 SERMOS) iro S131. I F UMSW=SW Im SPEOEIDmE IDI S,TO BE S4. APTLY LINE ACCONO 3.. FBITILM'a I1ECOWETOED BY nE S4 TEST. IF 110E1•NO WAS Nor DOS CONSIDER APPL11110 A 100 fti OF 12-,2-,2.A 101$ OR. EUWNEiI11.. FWRID1t C 111 TOP Sm TO OBMDI:A LYDOBI SFIDBEp,. WORKING THE FERIAND .0 E INTO THE SOL 2-I FOQ O WITH A DISK OL A MAKE OfRA= A01®.1K SILPC RULE 5 REQUIRES ALL DBRDffD AREAS LIKELY TOO p2R FOR SHALL NAM: SURFACE STABIIIAOIIN APPLIED W1R/1 2GTIER.mDLTIONG gEVpNT AAM m00MT10N LAY, GRASS Or THEN x/AC IOA'RIL BE USED m 11382E GROUND,i STABLID.. IEMIM- C ARE MEL r NON WOVEN SPACE POSTS�PER GEOTEKTILE MANUFACTURER FABRIC RECOMMENDATIONS 'Z 7=II=1 I 1 i3 ItT�1.1 III I_117Tii11- I1mo�-1 �1 ��DI TO SURFACE WIRE NOTE FILTER FABRIC .tl WOO) POST POSTSSHALL HAVE A. MINIMUM LENGTH OF 36 INCHES PLUS BURIAL DEPTH. POST: MATERIAL FLOW SHALL BE WOOD. STEEL.. OR SYNTHETIC.. AND SHALL BE OF SUFFICIENT STRENGTH TO RESIST DAMAGE DURING INSTALLATION AND TO SUPPORT APPLIED ry LOADS. I I 1 I1-i FABRIC SHALL BE A WOMENGEOTExTILE FABRIC CONSISTING RESISTANTMATERIALS STRONG; ROT ERIORA O M FROM I11 1 I t' 11 if { 1 fl ULTRAVIOLET ANDHEAT. EIPOSURETIN SILT FENCE CONSTRUCTION NTS MAINTENANCE: 1. LAND ALTERATION WHICH STRIPS THE LAND OF VEGETATION, INCLUDING REGRADING; SHALL BE ,DONE IN A WAY THAT WILL MINIMIZE EROSION; 2. CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL ORDINANCES THAT APPLY. 3. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING THE SITE. 4. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ON SITE INSPECTION. I 5. SEDIMENT LADEN WATER SHALL 'BE; DETAINED BY EROSION CONTROL PRACTICES AS NEEDED TO MINIMIZE SEDIMENTATION IN THE RECEIVING STREAM. NO 'STORM WATER SHALL BE DISCHARGED FROM THE SITE IN A MANNER THAT CAUSES EROSION AT THE POINT OF DISCHARGE. 6. WASTES' AND UNUSED BUILDING ,MATERIALS SHALL NOT BE ALLOWED TO BE CARRIED FROM THE SITE BY STORM WATER RUNOFF. PROPER DISPOSAL OF ALL WASTES AND UNUSED BUILDING MATERIALS IS REQUIRED: T z' S I I '- Aoi NIMMUI NON 1110MEN EASIING GROUND G:OIEKTILE FABRIC_ LINE. I m EXISTING GROUND—­_� STABILIZED CONSTRUCTION ENTRANCE NTS SITE PLAN 7. SEDIMENT BEING TRACKED ONTO PUBLIC OR' PRIVATE LOT 27 SUNRISE ON THE MONON ROADWAYS SHALL BE MINIMIZED. CLEARING OF' CARMEL, INDIANA ACCUMULATED SEDIMENT SHALL NOT INCLUDE FLUSHING' 14843WINOPUMP WAY WITH WATER. CLEARED SEDIMENT SHALL BE 'RETURNED TO Eoro' THE SITE FOR DISPOSAL. Erosion and sedimentplan.residential for this lot, shall, at previously includes row d SW the following measures and at all times follow the guidelines for Individual residential lots and the ,previously approved SWPPP for CARMEL: S. SOIL WHICH HAS ACCUMULATED NEXT TO. EROSION 1) Install and maintain a stablelconstruction site access at the location of the proposed drive. CONTROL DEVICES SHALL BE COLLECTED AND REDISTRIBUTED ON SITE ,AFTER EACH RAINFALL EVENT, AND 2) Install and maintain an appropriate perimeter erosion and -sediment control measures prior to land disturbance, ie silt AT LEAST ONCE' A WEEK. fence. 9. IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED' BY WEATHER, OR ,NIGHTFALL, THE PIPE ENDS SHALL BE COVERED WITH FILTER FABRIC. 10. ALL EXISTING STRUCTURES, FENCING, TREES AND 'ETC., WITHIN CONSTRUCTION AREA SHALL BE REMOVED AND DISPOSED OF OFFSITE. BURNING IS NOT ALLOWED ON SITE. 11. SCHEDULE OF EARTHWORK ACTIVITIES: a) THE DURATION OF TIME WHICH AN AREA 'REMAINS EXPOSED SHALL BE KEPT TO A ,PRACTICAL 'MINIMUW THE AREA SHALL BE STABILIZED AS':SOONI: AS POSSIBLE TEMPORARY VEGETATION OR MULCHING SHALL BE'USED TO PROTECT EXPOSED AREAS IF PERMANENT VEGETATION CANNOT' BE SEEDED WITHIN 15 DAYS i0R ACTIVITY CEASES FOR MORE THAN 15 DAYS OR AS, DIRECTED BY 'THE ENGINEER. ' b) TOPSOIL REPLACEMENT SHALL TAKE PLACE 'FROM MARCH 1 TO OCTOBER 31. STOCKPILE TOPSOIL AT ALL OTHER TIMES OF THE YEAR. 'PERMANENT :AND FINAL . VEGETATION AND STRUCTURAL EROSION CONTROL DEVICES SHALL BE INSTALLED WITHIN SEVEN (7) DAYS AFTER FINAL GRADING OR AS SOON AS POSSIBLE:_ 3) Minimize sediment discharge and tracking from the lot 4) Clean-up 'sediment that is either tracked or washed onto .roads. Bulk Gearing of, sediment shall not include flushing the area with water. Cleared sediment must be redistributed or disposed of in a manner that is in compliance with all applicablestatutes and rules. 5) Adjacent lots disturbed by an individual lot operator must be repaired and stabilized with temporary or permanent surface stabilization. 6) Self -monitoring program plan and procedures per the previous approved SWPPP shall be followed all individual lot construction. 7) Additional erosion/sediment control measures may be required upon inspection by local planning authority 8) 1 hereby certify that this individual lot plan inconsistent with the storm water management permit, as approved by CARMEL,. for SUNRISE ON THE MONON. 09/22/2017 LS20500017 DATE: `p�\�Yst(ItDN)prF!Qi'' FOR:'OLD,TOWN DESIGN'GROUP BY:WDHALL LAND SURVEYING 803 S. OHIO STREET SHERIDAN,. INDIANA 46069 Ph: 317496-3594 Fx: 317-758-5510 ST _ No. LS20500017'' STATE OF . SHEET 2OF,