HomeMy WebLinkAboutHyundai of Carmel (Napleton) Exterior ElevationsSIGNAGE:OF CARMELNAPLETON HYUNDAISTATE OFANAIDNIDERET
SIGERGENERAL NOTES:
EXISTING NORTH ELEVATION (REAR)
EXISTING EAST ELEVATION (RIGHT SIDE)
EXISTING SOUTH ELEVATION (FRONT)
EXISTING WEST ELEVATION (LEFT SIDE)
PROPOSED EAST ELEVATION (RIGHT SIDE)
PROPOSED WEST ELEVATION (LEFT SIDE)
PROPOSED NORTH ELEVATION (REAR)
PROPOSED SOUTH ELEVATION (FRONT)
06/06/22
KEY NOTES (CONT.):
KEY NOTES:
SOUTH ELEVATION
EXISTING
OF CARMELNAPLETON HYUNDAISTATE OFANAIDNIDERET
SIGERGENERAL NOTES:
NORTH ELEVATION
EXISTING
SOUTH ELEVATION
PROPOSED
NORTH ELEVATION
PROPOSED
06/06/22
KEY NOTES (CONT.):
KEY NOTES: OF CARMELNAPLETON HYUNDAISTATE OFANAIDNIDERET
SIGERGENERAL NOTES:
(SOUTH END)
EAST ELEV.
(NORTH END)
EAST ELEVATION
PROPOSED
PROPOSED
(SOUTH END)
EAST ELEV.
(NORTH END)
EAST ELEVATION
EXISTING
EXISTING
06/06/22
KEY NOTES (CONT.):
KEY NOTES: OF CARMELNAPLETON HYUNDAISTATE OFANAIDNIDERET
SIGERGENERAL NOTES:
(SOUTH END)
WEST ELEVATION
(NORTH END)
WEST ELEVATION
PROPOSED
PROPOSED
(SOUTH END)
WEST ELEVATION
(NORTH END)
WEST ELEVATION
EXISTING
EXISTING
06/06/22