Loading...
HomeMy WebLinkAboutC000 TITLE SHEETBENCHMARKS:8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:313-863 FEBRUARY 01, 2022 DRAFT DRAFT26 GLOBAL POWER AND CONSTRUCTION, INC. HIGHER GROUND EDUCATION CARMEL 10216 N. MICHIGAN ROAD CARMEL, INDIANA 46032 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 1 03/15/2022 ADLS RESUBMITTAL 1 2 04/20/2022 ADLS RESUBMITTAL 2 3 05/16/2022 ADLS RESUBMITTAL 2ADDITIONAL CITY OF CARMEL NOTES:CONSULTANT TEAM:PROJECTLOCATIONGASTELEPHONESTREETSSTORM SEWERWATERUTILITIES:HIGHER GROUND EDUCATION CARMEL10216 N. MICHIGAN STREETCARMEL, INDIANA 46032CONSTRUCTION DOCUMENTSMAY 16, 2022APPROVAL PENDINGNOT FOR CONSTRUCTIONELECTRICSANITARY SEWEROPERATING AUTHORITYCITY OF CARMELReta i l Pa rkway SITEMichigan Road (U.S. 421)Mayflower Park Drive Nor thw e s t e rn D r i v e SURVEYORCIVIL & ENVIRONMENTALCONSULTANTS, INC.530 E. OHIO ST., STE. GINDIANAPOLIS, IN 46204PH: (317) 655-7777CONTACT: ANTHONY SYERSEMAIL: asyers@cecinc.comSITE DATA:JCB AS NOTED TITLE SHEET C00001CIVIL ENGINEERCIVIL & ENVIRONMENTALCONSULTANTS, INC.530 E. OHIO STREET, SUITE GINDIANAPOLIS, IN 46204PH: (317) 655-7777CONTACT: NICK JUSTICEEMAIL: njustice@cecinc.comDEVELOPERGLOBAL POWER ANDCONSTRUCTION, INC.7S 822 CAMP DEAN ROADBIG ROCK, IL 60511PH: (630) 733-0002CONTACT: DYLAN FULLEREMAIL: dylan@buildgpc.comARCHITECTALLEN PEPA ARCHITECTS215 FULTON STREETGENEVA, IL 60134PH: (630) 578-1105CONTACT: ERIC PEPA, AIA, NCARBEMAIL: epepa@allenpepa.comPARKING DATA:ZONING DATA: ADJACENT ZONING CLASSIFICATIONS:ZONING DATA: EXISTING ZONING CLASSIFICATION:SITE DATA:BUILDING DATA:LOT COVERAGEDRAWING INDEXSheetNumberSheet TitleDrawingNo.1TITLE SHEET245678GRADING PLANC000C300ALTA SURVEY910DRAINAGE PLANC400C5001112UTILITY PLANSITE LAYOUTC200SITE DETAILSC801TEMPORARY POLLUTION PREVENTION PLANC100STORMWATER POLLUTION PREVENTION NOTESC900STORMWATER POLLUTION PREVENTION DETAILSC901C902PERMANENT POLLUTION PREVENTION PLAN13SITE DETAILSC802STORM SEWER PROFILESC4011415C800SITE DETAILS163SV-1TOPOGRAPHIC SURVEYSV-2DEMOLITION PLANC101SITE DETAILSSITE DETAILSSITE DETAILSSITE DETAILSSITE DETAILSSITE DETAILSC804C805C803C807C808C806171819202122FLOOD ROUTING PLANC40223STORMWATER POLLUTION PREVENTION DETAILSC90324C501SANITARY PROFILEEXISTING PROJECT SITE LAYOUTC100A2526SANITARY SPECIFICATIONSC8092705/16/2022