HomeMy WebLinkAboutC801 SITE DETAILS8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO
REVISION RECORD
DATE:
DWG SCALE:
DRAWN BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:SHEETOFDRAWING NO.:313-863
FEBRUARY 1, 2022
DRAFT
DRAFT
GLOBAL POWER AND
CONSTRUCTION, INC.
HIGHER GROUND EDUCATION CARMEL
10216 N. MICHIGAN ROAD
CARMEL, INDIANA 46032
530 E. Ohio Street · Suite G - Indianapolis, IN 46204
317-655-7777 · 877-746-0749
www.cecinc.com
SITE DETAILS
JCB
AS NOTED44 DETAIL 215 - CONCRETE WHEEL STOPDETAIL 212 - PARALLEL CURB RAMP DETAILDETAIL 214 - ADA ACCESSIBLE PARKING STALLSDETAIL 216 - SIGNAGE DETAILDETAIL 217 - PAINTED ADA ACCESSIBLE SYMBOL DETAILNOT TO SCALEDETAIL 218 - MULTI-USE PATH DETAILNOT TO SCALEDETAIL 213 - SIDEWALK CURB RAMPS TYPE G AND TYPE H(INDOT STANDARD DRAWING E 604-SWCR-09)C80102/01/2022