Loading...
HomeMy WebLinkAboutC808 SITE DETAILS8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:313-863 FEBRUARY 01, 2022 DRAFT DRAFT26 GLOBAL POWER AND CONSTRUCTION, INC. HIGHER GROUND EDUCATION CARMEL 10216 N. MICHIGAN ROAD CARMEL, INDIANA 46032 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com 1 03/15/2022 ADLS RESUBMITTAL 1 2 04/20/2022 ADLS RESUBMITTAL 2 3 05/16/2022 ADLS RESUBMITTAL 2 SITE DETAILS JCB AS NOTED22 DETAIL 517 - WATER/SEWER SEPARATION DETAILDETAIL # - POST INDICATOR VALVE INSTALLATIONDETAIL 521 - STORZ FIRE DEPT. CONNECTION DETAILDETAIL 514 - STD. HYDRANT SETTING DETAILDETAIL 515 - THRUST BLOCKING DETAILDETAIL 516 - WATER BEDDING DETAILDETAIL 520 - VALVE PLACEMENT DETAILDETAIL 518 - BLOW-OFF ASSEMBLY DETAILDETAIL 519 - VALVE BOX & COVER DETAILC80805/16/2022