Loading...
HomeMy WebLinkAboutC901 STORMWATER POLLUTION PREVENTION DETAILS8 A B 34567 12 C D E F G H 8 34567 12 A B C D E F G H DESCRIPTIONDATENOREVISION RECORDDATE:DWG SCALE:DRAWN BY:CHECKED BY:APPROVED BY:PROJECT NO:SHEET OF DRAWING NO.:313-863APRIL 20, 2022DRAFTDRAFT26GLOBAL POWER ANDCONSTRUCTION, INC.HIGHER GROUND EDUCATION CARMEL10216 N. MICHIGAN ROADCARMEL, INDIANA 46032530 E. Ohio Street · Suite G - Indianapolis, IN 46204317-655-7777 · 877-746-0749 www.cecinc.comJCBNONESTORMWATER POLLUTIONPREVENTION NOTESC901 24 (13) MATERIAL HANDLING AND SPILL PREVENTION (4) POST CONSTRUCTION STORMWATER QUALITY (3) STORMWATER QUALITY IMPLEMENTATION (1) POTENTIAL LANDUSE POLLUTANTS EROSION CONTROL MAINTENANCE REQUIREMENTS K. MONITORING AND MAINTENANCE GUIDELINES (2) LOCATION, DIMENSIONS, SPECIFICATIONS, AND CONSTRUCTION DETAILS OF EACH STORMWATER QUALITY MEASURE (10) LOCATION OF PROPOSED SOIL STOCKPILES (12) EROSION CONTROL MEASURES FOR INDIVIDUAL BUILDING LOTS SWPPP FOR POST CONSTRUCTION- CITY OF CARMEL (3) ESTIMATED PEAK DISCHARGE (7) POTENTIAL CONSTRUCTION POLLUTANTS (2) RECEIVING WATERS (1) HYDROLOGIC UNIT CODE SWPPP FOR CONSTRUCTION SITES- CITY OF CARMEL (5) LOCATION WHERE STORMWATER MAY BE DIRECTLY DISCHARGED INTO GROUNDWATER (4) LOCATION WHERE SPECIFIC POINTS OF STORMWATER DISCHARGE LEAVING THE SITE (8) TEMPORARY & PERMANENT STORMWATER QUALITY MEASURES C. CONCENTRATED FLOW SEDIMENT CONTROL B. SHEET FLOW SEDIMENT CONTROL A. CONSTRUCTION ENTRANCE INFORMATION (11-B) PERMANENT SURFACE STABILIZATION (11-A) TEMPORARY SURFACE STABILIZATION DESCRIPTION MEASURES: D. INLET PROTECTION LOCATIONS AND SPECS. E. RUNOFF CONTROL MEASURES F. OUTLET PROTECTION SPECIFICATIONS G. GRADE STABILIZATION MEASURES H. STORMWATER QUALITY DETAILS I. TEMPORARY SURFACE STABILIZATION J. PERMANENT SURFACE STABILIZATION (9) GENERAL CONSTRUCTION SEQUENCE (5) POST CONSTRUCTION MAINTENANCE GUIDELINES (14) CONTACT INFORMATION (6) SOIL MAP EROSION CONTROL RESPONSIBLE PERSON: 04/20/2022