HomeMy WebLinkAboutC902 STORMWATER POLLUTION PREVENTION DETAILS8
A
B
34567 12
C
D
E
F
G
H
8 34567 12
A
B
C
D
E
F
G
H
DESCRIPTIONDATENOREVISION RECORDDATE:DWG SCALE:DRAWN BY:CHECKED BY:APPROVED BY:PROJECT NO:SHEET OF
DRAWING NO.:313-863APRIL 20, 2022DRAFTDRAFT26GLOBAL POWER ANDCONSTRUCTION, INC.HIGHER GROUND EDUCATION CARMEL10216 N. MICHIGAN ROADCARMEL, INDIANA 46032530 E. Ohio Street · Suite G - Indianapolis, IN 46204317-655-7777 · 877-746-0749 www.cecinc.comJCBAS NOTEDSTORMWATER POLLUTIONPREVENTION DETAILSC902
25
DETAIL 903 - TEMPORARY CONSTRUCTION ENTRANCE
DETAIL 900 - SILT FENCE
INSTALLATION DETAIL
DETAIL 904 - EROSION CONTROL INLET PROTECTION
FOR CURB INLET AND CATCH BASINS
DETAIL 906 - NON-PAVED AREA CATCH
BASIN INLET PROTECTION DETAIL
PLAN
SECTION B-B
NOT TO SCALE
DETAIL 901- CONCRETE WASHOUT BMP
DETAIL 907 - BELOW GRATE INLET PROTECTION
DETAIL 902 - STRAW BALE FOR CONCRETE WASHOUT- ONLY
DETAIL 908 - SLOPE BLANKET INSTALLATION
DETAIL #905 - SILT SOCK ON PAVEMENT
DETAIL 909 - FIBER ROLL INSTALLATION
DETAIL 910 - ROCK HORSESHOE DAM DETAIL
DETAIL 911 - RIP RAP APRON DETAIL
04/20/2022