Loading...
HomeMy WebLinkAboutC902 STORMWATER POLLUTION PREVENTION DETAILS8 A B 34567 12 C D E F G H 8 34567 12 A B C D E F G H DESCRIPTIONDATENOREVISION RECORDDATE:DWG SCALE:DRAWN BY:CHECKED BY:APPROVED BY:PROJECT NO:SHEET OF DRAWING NO.:313-863APRIL 20, 2022DRAFTDRAFT26GLOBAL POWER ANDCONSTRUCTION, INC.HIGHER GROUND EDUCATION CARMEL10216 N. MICHIGAN ROADCARMEL, INDIANA 46032530 E. Ohio Street · Suite G - Indianapolis, IN 46204317-655-7777 · 877-746-0749 www.cecinc.comJCBAS NOTEDSTORMWATER POLLUTIONPREVENTION DETAILSC902 25 DETAIL 903 - TEMPORARY CONSTRUCTION ENTRANCE DETAIL 900 - SILT FENCE INSTALLATION DETAIL DETAIL 904 - EROSION CONTROL INLET PROTECTION FOR CURB INLET AND CATCH BASINS DETAIL 906 - NON-PAVED AREA CATCH BASIN INLET PROTECTION DETAIL PLAN SECTION B-B NOT TO SCALE DETAIL 901- CONCRETE WASHOUT BMP DETAIL 907 - BELOW GRATE INLET PROTECTION DETAIL 902 - STRAW BALE FOR CONCRETE WASHOUT- ONLY DETAIL 908 - SLOPE BLANKET INSTALLATION DETAIL #905 - SILT SOCK ON PAVEMENT DETAIL 909 - FIBER ROLL INSTALLATION DETAIL 910 - ROCK HORSESHOE DAM DETAIL DETAIL 911 - RIP RAP APRON DETAIL 04/20/2022