Loading...
HomeMy WebLinkAbout35-P0-1 GENERAL NOTES AND LEGENDSINFO@ALLENPEPA.COM TEL: (630) 578-1105 215 FULTON ST., GENEVA, IL 60134PROJECT NO.DRAWN BYCHECKED BYSHEETSchematic Design:Design Development Bidding: Permit:POST BID/PERMIT REVISIONS:ISSUE DATE:ALLEN+PEPA COPYRIGHTALLEN PEPA A R C H I T E C T S MGN CONSULTING ENGINEERS, INC. 635 BUTTERFIELD ROAD SUITE #310 OAKBROOK TERRACE, IL 60181 PHONE (630) 627-6078 WWW.MGN.ENGINEERING1/12/2022 8:09:09 AMC:\Users\Amanda Kerner\Documents\21-014 Higher Ground Carmel_akernerK6S8R.rvt HIGHER GROUND CARMEL CARMEL, IN 46033 21-0211/28/2212/30/21No.DateDescriptionOF 21FOR PERMIT1/28/22GENERAL NOTES& LEGENDSP0-1ABOVE GROUNDDRAIN & VENTPVC ASTM D2665-2012COPPER TUBE DWV ASTM B 306-2009UNDERGROUNDDRAIN & VENTPVC ASTM D2665-2012BUILDING SEWERPVC ASTM F 1866-1WATER SERVICEDUCTILE IRON AWWA C151 WITH AWWA C110 FITTINGS FIREPROTECTION SERVICECOPPER TYPE 'K' BELOW GROUND ASTM B 88-2009 NSFAPPROVEDWATER DISTRIBUTION1COPPER 'L' ABOVE GROUND ASTM B 88-2009 NSFAPPROVEDADA AMERICANS WITH DISABILITIES ACTADJ ADJUSTABLEAFF ABOVE FINISHED FLOORAHJAUTHORITY HAVING JURSIDICTIONANSI AMERICAN NATIONAL STANDARDS INSTITUTEAPPROXAPPROXIMAT(E), (ELY)ARCH ARCHITECTBFP BACKFLOW PREVENTERBTU BRITISH THERMAL UNITBV BALL VALVECI CAST IRONCO CLEAN OUTCOTGCLEANOUT TO GRADECW COLD WATERDCVDUAL CHECK VALVEDEG DEGREEDEPT DEPARTMENTDFUDRAINAGE FIXTURE UNITDIA DIAMETERDWG DRAWINGENT ENTERINGEQUIPEQUIPMENTET EXPANSION TANKEWC ELECTRIC WATER COOLEREXISTEXISTINGEXP EXPANSIONEXT EXTERIORF FAHRENHEITFCO FLOOR CLEANOUTFD FLOOR DRAINFIXT FIXTUREFLR FLOORFS FLOOR SINKGA GAGEGAL GALLONGC GENERAL CONTRACTORHB HOSE BIBHD HEAD, HUB DRAINHORIZ HORIZONTALHP HORSEPOWERHRHOURHW HOT WATERHWRHOT WATER RECIRCULATIONHYWALL HYDRANT (FREEZE PROOF)IN WC INCHES, WATER COLUMNINCL INCLUDEIPS INTERNATIONAL PIPE STANDARDKW KILOWATTLAV LAVATORYLCOLINE CLEANOUTLB POUNDMAX MAXIMUMMB MOP BASINMBH BTU/HR X 1,000MC MECHANICAL CONTRACTORMECH MECHANICALMINMINIMUMMISC MISCELLANEOUSNA NOT APPLICABLENIC NOT IN CONTRACTNTS NOT TO SCALEPD PRESSURE DROP/DIFFERENCEPGPRESSURE GAGEPLMB PLUMBINGPSI POUNDS PER SQUARE INCH (GAGE)PVC POLYVINYL CHLORIDEQTY QUANTITYR THERMAL RESISTANCERECIRC RECIRCULAT(E), (OR), (ING)RM ROOMRPZREDUCED PRESSURE ZONE BACKFLOW PREVENTORSAN SANITARYSK SINKSS SERVICE SINKSTSTORMSTD STANDARDT&P VALVE TEMPERATURE AND PRESSURE VALVETEMP TEMPERATURETYPTYPICALTWCOTWO WAY CLEANOUTUNOUNLESS NOTED OTHERWISEV VENTV.B.VACUUM BREAKERVIFVERIFY IN FIELDVOL VOLUMEVTR VENT THROUGH THE ROOFW WASTEW/ WITHW/O WITHOUTWC WATER CLOSETWFUWATER FIXTURE UNITWTR WATERCONNECT TO EXISTINGCLEANOUT - FLOOR OR YARDCLEANOUT - WALL OR LINEPRESSURE REDUCING VALVEMETERFLOOR SINKFLOOR DRAINCHECK VALVEGATE VALVETEE - TURNED UPTEE - TURNED DOWNELBOW - TURNED UPELBOW - TURNED DOWNUNIONVENT UNDERGROUND OR UNDER FLOORVENT OVERHEADSTORM BELOW GROUNDSTORM ABOVE GROUNDSANITARYHOT WATER RETURNHOT WATERCOLD WATERNOTE: NOT ALL ITEMS MAY BE USED.NOTE: NOT ALL ITEMS MAY BE USED.SYMBOLDESCRIPTIONKEYNOTE TAGREVISION TAG11. . .. . .SANSANSTSTSTSTVVBALL VALVEBUTTERFLY VALVEPUMPPIPE MATERIALSGENERAL NOTESLEGENDABBREVIATIONSNOTES:1.USE ONLY LEAD FREE SOLDER AT ALL WATER SUPPLY CONNECTIONS1.THE CONTRACT DOCUMENTS CONSIST OF THE DRAWINGS, (ARCHITECTURAL,CIVIL, MECHANICAL, ELECTRICAL, PLUMBING) SPECIFICATIONS, OWNERCONTRACTOR AGREEMENTS, AND ALL ADDENDA ISSUED PRIOR TO AND ALL PLANCHANGES ISSUED AFTER EXECUTION TO THE CONTRACT.2.THE PROJECT SHALL BE CONSTRUCTED IN FULL COMPLIANCE WITH ALL LAWSAND ORDINANCES. INSTALLATION SHALL BE IN COMPLIANCE WITH THE INDIANAPLUMBING CODE AND ALL LOCAL AMENDMENTS OF CITY OR VILLAGE OF CARMEL,INDIANA IN THE EVENT OF A CONFLICT BETWEEN THESE SPECIFICATIONS AND ALEGALLY VALID LAW, ORDINANCE OR CODE REQUIREMENT, THE ORDINANCE ORCODE REQUIREMENT SHALL GOVERN.3.UNLESS OTHERWISE INDICATED IN THE CONSTRUCTION DOCUMENTS AS BEINGNOT IN CONTRACT (N.I.C.) OR EXISTING, ALL ITEMS, MATERIALS ANDINSTALLATION OF SAME ARE A PART OF THE CONTRACT DEFINED BY THEDOCUMENTS. THE CONTRACTOR SHALL PROVIDE AND INSTALL ALLACCESSORIES, COMPONENTS AND ASSEMBLIES REQUIRED FOR THE WORKSHOWN.4.WORK REQUIRED OF ANY TRADE MAY BE SHOWN ANYWHERE ON ANY DRAWINGOR IN ANY PART OF THE SPECIFICATIONS. THE CONTRACTOR IS ADVISED TOINCLUDE ALL WORK IN HIS BID. NO CLAIM FOR AN EXTRA WILL BE CONSIDEREDFOR FAILURE TO DO SO.5.ALL COSTS FOR INSPECTIONS, TESTS, AND UTILITY CONNECTION FEES SHALL BEBORNE BY THE CONTRACTOR UNLESS OTHERWISE STATED. CONTRACTORSHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED INSPECTIONS ANDAPPROVALS FOR HIS WORK.6.IN THE EVENT OF DISCREPANCIES BETWEEN ANY DRAWINGS AND/ORSPECIFICATIONS, THE COSTLIER OR MORE RESTRICTIVE CONDITION SHALL BEDEEMED THE CONTRACT REQUIREMENT UNLESS OTHERWISE STATED IN WRITINGFROM THE OWNER.7.ALL PIPING IS SHOWN DIAGRAMMATICALLY AND DOES NOT SHOW ALL OFFSETS,DROPS AND RISES OR RUNS. THE CONTRACTOR SHALL ALLOW IN HIS BID FORROUTING OF PIPING TO AVOID OBSTRUCTIONS.8.PLUMBING CONTRACTOR SHALL PROVIDE G.C. ALL REQUIRED SHAFT ANDPLUMBING WALL CLEAR INSIDE DIMENSIONS FOR COORDINATION PRIOR TOROUGH-IN9.INSTALL ALL EQUIPMENT AND MATERIAL IN ACCORDANCE WITHMANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS.10.PROVIDE GALVANIC PROTECTION BETWEEN DISSIMILAR MATERIALS.11.ALL LABOR AND MATERIALS FOR ROUGH-IN AND FINAL CONNECTIONS TOEQUIPMENT TO BE COMPLETED BY PLUMBING CONTRACTOR.12.PROVIDE FULL PORT VALVE MINIMUM SIZE OF WATER SERVICE ON DISCHARGESIDE OF WATER METER. INSTALL DRAIN DOWN VALVE ON DISCHARGE SIDE OFWATER METER. INSTALL UNIONS ON INLET/OUTLET OPENINGS OF WATER METER.13.ALL PLUMBING WATER CONNECTIONS TO BE PROVIDED BY CONTRACTOR WITHSHUT-OFF VALVES. PLUMBING CONTRACTOR SHALL PROVIDE ANY ADDITIONALCLEANOUTS, VENTS OR FLOOR DRAINS WHERE REQUIRED BY CODE, AND SHALLINCLUDE THEM IN HIS ORIGINAL QUOTATION.14.ALL ROOMS CONTAINING PLUMBING FIXTURES SHALL HAVE INDEPENDENTWATER SHUT-OFF VALVES FOR ISOLATION OF RESPECTIVE ROOM.BACK-TO-BACK PLUMBING FIXTURES LOCATED IN ADJACENT ROOMS MAY SHARESHUT-OFF VALVES.15.ALL PLUMBING PIPING INSTALLED IN EXTERIOR WALLS MUST BE INSTALLED ONINTERIOR SIDE OF WALL INSULATION.16.DO NOT ROUTE PLUMBING PIPING ABOVE ELECTRICAL GEAR OR THROUGHELECTRICAL WORK CLEARANCE AREAS. COORDINATE LOCATIONS OFELECTRICAL EQUIPMENT LOCATIONS PRIOR TO INSTALLATION.17.CLEANOUTS:A.INSTALL SANITARY AND STORM PIPE CLEANOUTS WITHIN BUILDING NOT MORETHAN 50 FEET APART IN HORIZONTAL LINES OF 4 INCHES AND LESS AND NOTMORE THAN 100 FEET APART FOR LINES GREATER THAN 4 INCHES AND LESSTHAN 10 INCHES.B.PROVIDE COVER PLATES OR ACCESS DOORS FOR CONCEALED CLEANOUTPLUGS.C.PROVIDE FULL SIZE CLEANOUT WITHIN 5 FEET OF BUILDING FOUNDATION.D.ALL CLEANOUTS TO HAVE 18 INCHES OF CLEARANCE.E.PROVIDE CLEANOUTS AT ALL CHANGE OF DIRECTION GREATER THAN 60DEGREES.18.PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALLINVERT ELEVATIONS.19.COORDINATE REQUIRED EQUIPMENT VOLTAGE, PHASE, BREAKER SIZE, ANDDISCONNECTING MEANS WITH ELECTRICAL CONTRACTOR PRIOR TO ORDERINGANY EQUIPMENT.20.WHERE FLOOR DRAIN LOSS OF TRAP SEAL MAY OCCUR DUE TO EVAPORATION,PROVIDE DEEP SEAL TRAP NOT TO EXCEED 8 INCHES. THIS INCLUDES TRAPSFOR DRAINS IN MECHANICAL ROOMS, DEDICATED T&P DISCHARGE, DRAIN PANDISCHARGE.21.CIRCULATING HOT WATER SYSTEM PUMPS OR HEAT TRACE SHALL BE ARRANGEDTO BE TURNED OFF BY BOTH TIME CLOCK AND RETURN WATER TEMPERATURESENSOR. READY ACCESS SHALL BE PROVIDED TO THE OPERATING CONTROLS.PROVIDE AND INSTALL TIME CLOCK, AQUASTAT, CONTACTORS, AND WIRING FORCOMPLETE SYSTEM.22.ALL CW, HW, RECIRCULATED WATER PIPING SHALL BE INSULATED WITH NOT LESSTHAN 1 INCH OF INSULATION HAVING A CONDUCTIVITY NOT EXCEEDING 0.27 BTUPER INCH/HRxSQFTxF.23.ALL HORIZONTAL STORM DRAIN PIPING INCLUDING DRAIN BODY ABOVE FINISHEDCEILINGS TO BE INSULATED.24.PROVIDE FIRESTOPPING AROUND ALL WALL AND FLOOR PENETRATIONS TOMAINTAIN RATINGS OF WALLS AND FLOORS. SEE ARCHITECTURAL PLANS FORWALL AND FLOOR RATINGS. PENETRATIONS THROUGH FLOORS SHALL BECAULKED AND SEALED AIR AND WATER TIGHT PREVENTING PASSAGE OF SMOKEAND FLAMES.25.PROVIDE WATER HAMMER ARRESTORS AT ALL FIXTURES WITH QUICK-CLOSINGVALVES/FAUCETS.26.ALL HOSE CONNECTIONS, CONNECTIONS TO AUTOMATIC FIRE SPRINKLERSYSTEMS, CHEMICAL FEEDERS & DISPENSERS, HUMIDIFIERS SHALL HAVEBACKFLOW PREVENTION DEVICES INSTALLED ON DOMESTIC WATER SUPPLYCONNECTIONS27.PROVIDE AIR GAPS FOR INDIRECT DRAINS WHERE REQUIRED BY CODE. AIR GAPSHALL BE TWO (2) TIMES THE DIAMETER OF THE INDIRECT DRAIN WHEN LOCATEDGREATER THAN THREE DIAMETERS TO A WALL OR FOUR DIAMETERS TO ACORNER. AIR GAP SHALL BE FOUR (4) TIMES THE DIAMETER OTHERWISE.28.RPZs AND DDCs SHALL NOT BE INSTALLED GREATER THAN 60 INCHES ABOVEFINISHED FLOOR AND SHALL BE READILY ACCESSIBLE29.ALL BACKFLOW DEVICES SHALL BE TESTED AND APPROVED BY CROSSCONNECTION CONTROL DEVICE INSPECTOR (CCCDI), RECORD OF TESTING SHALLBE AVAILABLE AT THE SITE OF INSTALLATION.30.MAXIMUM DEVELOPED LENGTH OF ANY INDIRECT SANITARY WASTE SHALL NOTEXCEED 5 FEET. INDIRECT WASTE LINES SHALL BE SAME SIZE AS FIXTUREOUTLET AND AT LEAST 3/4 INCH. ALL INDIRECT WASTE PIPING EXCEEDING 30INCHES IN DEVELOPED LENGTH MEASURED HORIZONTALLY OR 54 INCHES INTOTAL DEVELOPED LENGTH SHALL BE TRAPPED.31.PROVIDE VALVE STEM EXTENSIONS FOR ALL INSULATED WATER SUPPLY PIPING.32.PROVIDE GROUTING/CAULKING WHERE FIXTURES MEET WALLS, FLOORS,COUNTERTOPS, ETC.33.ALL PIPING EXPOSED TO VIEW IN FINISHED AREAS SHALL BE CHROME PLATED.34.PROVIDE LEAD ROOF FLASHING ON ALL VENT STACKS PENETRATING THROUGHTHE ROOF (EXCEPT RUBBER ROOFS). PROVIDE INCREASER FITTINGS.35.VENT TERMINALS SHALL NOT BE LOCATED LESS THAN 12 FEET HORIZONTALLY OFVENTILATION INTAKES UNLESS THEY ARE AT LEAST 2 FEET ABOVE THE TOP OFSUCH OPENING. VENT TERMINALS SHALL TERMINATE MINIMUM 12” ABOVEROOFS.36.CONTRACTOR SHALL PROVIDE NECESSARY HANGERS AND SUPPORTS TOPROVIDE FOR PROPER PITCHES, EXPANSION, MOVEMENT, ETC. AS REQUIRED.CONTRACTOR SHALL PREVENT PASSAGE OF RODENTS, INSECTS, MOISTURE ANDSOUND.37.FURNISH AND INSTALL PLUMBING FIXTURES AS INDICATED ON DRAWINGS AND ASLISTED IN PLUMBING FIXTURE SCHEDULE.38.THE DRAWINGS SHALL BE TAKEN IN A SENSE AS DIAGRAMMATIC. SIZES ANDMEANS OF RUNNING PIPING ARE SHOWN, BUT IT IS NOT INTENDED TO SHOWEVERY FITTING AND OFFSET, NOR EVERY STRUCTURAL DIFFICULTY TO BEENCOUNTERED DURING THE INSTALLATION OF THE WORK.39.FLUSHING/DISINFECTION OF POTABLE WATER SYSTEM: NEW OR REPAIREDPOTABLE WATER SYSTEMS SHALL BE DISINFECTED PER INDIANA PLUMBINGCODE PRIOR TO USE OR AS OTHERWISE DIRECTED BY AUTHORITY HAVINGJURISDICTION.40.PERFORM TESTS PER THE INDIANA PLUMBING CODE OR AS OTHERWISEDIRECTED BY THE LOCAL AUTHORITY.41.SHOP DRAWINGS:A.SUBMIT COORDINATED SHOP DRAWINGS FOR ALL EQUIPMENT, FIXTURES,INSULATION, ETC.B.SUBMIT ALL SHOP DRAWINGS FOR REVIEW AND APPROVAL TO ARCHITECT'SOFFICE PRIOR TO PURCHASE, FABRICATION, AND INSTALLATION.C.CONTRACTOR SHALL HIGHLIGHT OR SUMMARIZE ANY DEVIATIONS IN THE SHOPDRAWING SUBMITTALS FROM THE CONTRACT DOCUMENTS.42.SUBSTITUTIONS: CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DESIGNMODIFICATIONS RESULTING FROM EQUIPMENT SUBSTITUTED FROM THAT WHICHIS SPECIFIED. MODIFICATIONS INCLUDE BUT NOT LIMITED TO: REQUIREDWORKING AND CODE CLEARANCES; LOCATIONS AND DIMENSIONS OF OPENINGS;STRUCTURAL COORDINATION; BREAKER, WIRE, CONDUIT SIZES; PIPE SIZES;ROUGH-IN DIMENSIONS43.MANUALS: DOCUMENTS DESCRIBED BELOW SHALL BE PROVIDED TO THEBUILDING OWNER WITHIN 90 DAYS OF THE DATE OF RECEIPT OF THECERTIFICATE OF OCCUPANCY:A.SUBMITTAL DATA STATING EQUIPMENT SIZE AND SELECTED OPTIONS FOR EACHPIECE OF EQUIPMENT REQUIRING MAINTENANCE.B.MANUFACTURER'S OPERATION MANUALS AND MAINTENANCE MANUALS FOREACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE, EXCEPT EQUIPMENT NOTFURNISHED AS PART OF THE PROJECT. REQUIRED ROUTINE MAINTENANCEACTIONS SHALL BE CLEARLY IDENTIFIED.C.NAME AND ADDRESS OF AT LEAST ONE SERVICE AGENCY.D.A NARRATIVE OF HOW EACH SYSTEM IS INTENDED TO OPERATE, INCLUDINGRECOMMENDED SETPOINTS.44. PERFORM DRAINAGE AND VENT TEST WITH WATER OR AIR PER INDIANA PLUMBINGCODE. PERFORM ALL OTHER TESTS REQUIRED PER THE INDIANA PLUMBINGCODE OR AS OTHERWISE DIRECTED BY THE LOCAL AUTHORITY.45.ALL BACKFLOW DEVICES SHALL BE TESTED AND APPROVED BY CROSS CONNECTION CONTROL DEVICE INSPECTOR (CCCDI), RECORD OF TESTING SHALLBE AVAILABLE AT THE SITE OF INSTALLATION.9