HomeMy WebLinkAbout39-P6-1 PLUMBING SCHEDULES AND DETAILSMIN. 12"WATER CUT OFFMASTICSTAINLESS STL.CLAMP RINGVENT THRU ROOFSPLICING CEMENTLAP SEALANTREMOLDED PIPE SEAL. . .. . .ET-1HOSE END DRAINVALVEUNIONTYPICALBALANCINGVALVE4" CONCRETE PADASME RATED COMBINATIONPRESSURE ANDTEMPERATURE RELIEF VALVEDISCHARGE T&PRELIEF VALVE TOFLOOR DRAINCONDENSATE TRAPCONNECTIONPLASTIC TUBING2P6-1WATER HEATER DETAILN.T.S.NOTE: PROVIDEVACUUM RELIEF ONBOTTOM INLETCONNECTIONSCHECK VALVE.TYPICALTHERMOSTATTYPICALWH-11P6-1INLINE RECIRCULATION PUMP DETAILN.T.S.HOT WATER RETURNHOT WATER (120°)COLD WATERRCP-1AIR GAP FITTING TOFLOOR DRAINPIPE SLEEVE2 1/2" Ø WATER SERVICESEE CIVIL FORCONTINUATIONTO DOMESTICDISTRIBUITONSTRAINER (TYP.)RPZ-13P6-1VENT THROUGH ROOF DETAILN.T.S.4P6-1WATER SERVICE DIAGRAMN.T.S.DIELECTRIC UNIONSHUTOFFTHERMOSTATVALVE (TYP.)STRAINERFROM LOOPHWR PIPINGAND SWITCHCONTROLLERSUPPORT FROM PIPING)STRUCTURE (DO NOTPROVIDE PUMP SUPPORT FROMCHECK VALVEGLOBE VALVENOTE: FOR PUMP SELECTION SEE SCHEDULEGAUGE (TYPICAL)DETAIL)PRESSURE(SEE WATER HEATERHWR TO WATER HEATER(TYPICAL)UNIONDIELECTRICTHERMOMETERMIN.10'-0"1/4"DRAINVALVE(TYP.)1 1/2" Ø PUBLIC WORKSMETER. PROVIDEREMOTE READER,CONDUIT, AND CABLEIF NECESSARY.COORDINATE WITHPUBLIC WORKSINFO@ALLENPEPA.COM
TEL: (630) 578-1105
215 FULTON ST., GENEVA, IL 60134PROJECT NO.DRAWN BYCHECKED BYSHEETSchematic Design:Design Development Bidding: Permit:POST BID/PERMIT REVISIONS:ISSUE DATE:ALLEN+PEPA COPYRIGHTALLEN PEPA
A R C H I T E C T S
MGN CONSULTING
ENGINEERS, INC.
635 BUTTERFIELD ROAD
SUITE #310
OAKBROOK TERRACE, IL 60181
PHONE (630) 627-6078
WWW.MGN.ENGINEERING1/12/2022 8:09:09 AMC:\Users\Amanda Kerner\Documents\21-014 Higher Ground Carmel_akernerK6S8R.rvt
HIGHER GROUND CARMEL
CARMEL, IN 46033
21-0211/28/2212/30/21No.DateDescriptionOF 21FOR PERMIT1/28/22SCHEDULESP6-113