Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
44-E1-3 ELECTRICAL ROOF PLAN
ADC41B232.22.32.52.62.4RTU310 TONSRTU412.5 TONSRTU210 TONSRTU14 TONSPP-1:1,3,5PP-1:7,9,11PP-1:19,21,23PP-1:13,15,17PP-1:42RTU RECEPTINTEGRAL(TYP.)PP-1:42RTU RECEPTPP-1:42RTU RECEPTPP-1:42RTU RECEPTPP-1:41WP/GFIPP-1:39WP/GFIPP-1:33WP/GFIPP-1:35WP/GFIPP-1:31WP/GFIPP-1:37WP/GFIINFO@ALLENPEPA.COM TEL: (630) 578-1105 215 FULTON ST., GENEVA, IL 60134PROJECT NO.DRAWN BYCHECKED BYSHEETSchematic Design:Design Development Bidding: Permit:POST BID/PERMIT REVISIONS:ISSUE DATE:ALLEN+PEPA COPYRIGHTALLEN PEPA A R C H I T E C T S MGN CONSULTING ENGINEERS, INC. 635 BUTTERFIELD ROAD SUITE #310 OAKBROOK TERRACE, IL 60181 PHONE (630) 627-6078 WWW.MGN.ENGINEERING1/12/2022 8:09:09 AMC:\Users\Amanda Kerner\Documents\21-014 Higher Ground Carmel_akernerK6S8R.rvt HIGHER GROUND CARMEL CARMEL, IN 46033 21-0211/28/2212/30/21No.DateDescriptionOF 21FOR PERMIT1/28/22ELECTRICALROOF PLANE1-31ELECTRICAL ROOF PLANSCALE: 18" = 1'-0"18