Loading...
HomeMy WebLinkAbout16-A3-2 WALL SECTIONSWALL ASSEMBLYZIP SYSTEM® SHEATHINGWOOD STUDS @ 16" o.c.INSIDE SURFACE OFWINDOW FLANGETHE BEAD OF SEALANT ON THEMOUNTING FLANGE AT THESILL MUST HAVE AT LEAST 2GAPS AT LEAST 2 INCHESWIDE TO PERMIT DRAINAGE.THE GAPS MUST BE NO MORETHAN 4-FEET APART.APPLY A CONTINUOUS BEADOF SEALANT AROUND THEFULL PERIMETER OF THE BACKSIDE (INTERIOR SURFACE) OFTHE WINDOW MOUNTINGFLANGE.ZIP SYSTEM® TAPE ORADHESIVE BACKED FLASHING(MUST MEET AC148) SEALEDOVER WINDOW FLANGES ATJAMBSSEALANTFROM THE INTERIOR, INSTALL LOW PRESSURE POLYURETHANE FOAMBETWEEN WINDOW AND ROUGH OPENING TO MAINTAIN CONTINUITY OFTHE AIR BARRIER. IF GAP IS TOO NARROW TO ALLOW FOR USE OFPOLYURETHANE, USE A CAULK SEALANT COMPATIBLE WITH FLASHINGSAT THE SILL AND THE JAMBS. WITH ZIP SYSTEM® TAPE USED AT THESILL AND THE JAMBS, COMPATIBLE SEALANTS ARE POLYURETHANE,BUTYL, AND SILICONE.INSTALLED WINDOW01 FIRST FLOOR0"B/ FOOTING-3' -6"02 T/ PLATE10' -3"14" NOMINAL 4" NOMINAL 4" NOMINAL 4" NOMINAL STONE VENEERSTONE VENEERSTONE VENEERSTONE VENEERR6 (1R6 (1R6 (1R6 (1----1/2") ZIP 1/2") ZIP 1/2") ZIP 1/2") ZIP SHEATHING SYSTEMSHEATHING SYSTEMSHEATHING SYSTEMSHEATHING SYSTEM4" SLAB ON GRADE ON 4" SLAB ON GRADE ON 4" SLAB ON GRADE ON 4" SLAB ON GRADE ON MIN. 6 MIL VBMIN. 6 MIL VBMIN. 6 MIL VBMIN. 6 MIL VBFLOORING, SEE FLOORING, SEE FLOORING, SEE FLOORING, SEE FINISH SCHEDULEFINISH SCHEDULEFINISH SCHEDULEFINISH SCHEDULE2x6 WD. STUDS @ 16" O.C. W/ R21 2x6 WD. STUDS @ 16" O.C. W/ R21 2x6 WD. STUDS @ 16" O.C. W/ R21 2x6 WD. STUDS @ 16" O.C. W/ R21 CONDENSED BATT INSULATION W/ 6 CONDENSED BATT INSULATION W/ 6 CONDENSED BATT INSULATION W/ 6 CONDENSED BATT INSULATION W/ 6 MIL VB, CONT. @ WARM SIDEMIL VB, CONT. @ WARM SIDEMIL VB, CONT. @ WARM SIDEMIL VB, CONT. @ WARM SIDE5/8" GWB, WRAP AT HEAD AND 5/8" GWB, WRAP AT HEAD AND 5/8" GWB, WRAP AT HEAD AND 5/8" GWB, WRAP AT HEAD AND JAMB OF WINDOWSJAMB OF WINDOWSJAMB OF WINDOWSJAMB OF WINDOWSPTD. WD. SILLPTD. WD. SILLPTD. WD. SILLPTD. WD. SILL2x2 ACT2x2 ACT2x2 ACT2x2 ACTRRRR----49 BATT INSULATION 49 BATT INSULATION 49 BATT INSULATION 49 BATT INSULATION ARCHITECTURAL ROOF SHINGLES ARCHITECTURAL ROOF SHINGLES ARCHITECTURAL ROOF SHINGLES ARCHITECTURAL ROOF SHINGLES ON MANUF. APPROVED ON MANUF. APPROVED ON MANUF. APPROVED ON MANUF. APPROVED UNDERLAYMENTUNDERLAYMENTUNDERLAYMENTUNDERLAYMENT5/8" CDX PLYWD. 5/8" CDX PLYWD. 5/8" CDX PLYWD. 5/8" CDX PLYWD. SHEATHINGSHEATHINGSHEATHINGSHEATHINGWOOD ROOF TRUSSESWOOD ROOF TRUSSESWOOD ROOF TRUSSESWOOD ROOF TRUSSESALUM. SOFFIT W/ CONT. ALUM. SOFFIT W/ CONT. ALUM. SOFFIT W/ CONT. ALUM. SOFFIT W/ CONT. VENT & INSECT SCREENVENT & INSECT SCREENVENT & INSECT SCREENVENT & INSECT SCREEN6" COMPACTED 6" COMPACTED 6" COMPACTED 6" COMPACTED GRAVEL FILLGRAVEL FILLGRAVEL FILLGRAVEL FILLLIMESTONE SILLLIMESTONE SILLLIMESTONE SILLLIMESTONE SILLVINYL WINDOWVINYL WINDOWVINYL WINDOWVINYL WINDOWA3-242" (R10) RIGID 2" (R10) RIGID 2" (R10) RIGID 2" (R10) RIGID INSULATION, 2'INSULATION, 2'INSULATION, 2'INSULATION, 2'----0" VERT. 0" VERT. 0" VERT. 0" VERT. & HORIZ.& HORIZ.& HORIZ.& HORIZ.5/8" TYPE X, GYP. BD. CEILING W/ 6 MIL 5/8" TYPE X, GYP. BD. CEILING W/ 6 MIL 5/8" TYPE X, GYP. BD. CEILING W/ 6 MIL 5/8" TYPE X, GYP. BD. CEILING W/ 6 MIL VB, CONT. @ WARM SIDE @ VB, CONT. @ WARM SIDE @ VB, CONT. @ WARM SIDE @ VB, CONT. @ WARM SIDE @ UNDERSIDE OF TRUSSES, TYP. UNDERSIDE OF TRUSSES, TYP. UNDERSIDE OF TRUSSES, TYP. UNDERSIDE OF TRUSSES, TYP. THROUGHOUT, U.N.O.THROUGHOUT, U.N.O.THROUGHOUT, U.N.O.THROUGHOUT, U.N.O.4" NOMINAL BRICK/ STONE 4" NOMINAL BRICK/ STONE 4" NOMINAL BRICK/ STONE 4" NOMINAL BRICK/ STONE VENEER, SEE ELEV. ON VENEER, SEE ELEV. ON VENEER, SEE ELEV. ON VENEER, SEE ELEV. ON SHEET A2SHEET A2SHEET A2SHEET A2----1111R6 (1R6 (1R6 (1R6 (1----1/2") ZIP 1/2") ZIP 1/2") ZIP 1/2") ZIP SHEATHING SYSTEMSHEATHING SYSTEMSHEATHING SYSTEMSHEATHING SYSTEMADHERED FLASHING W/ ST. ADHERED FLASHING W/ ST. ADHERED FLASHING W/ ST. ADHERED FLASHING W/ ST. STL. DRIP EDGESTL. DRIP EDGESTL. DRIP EDGESTL. DRIP EDGEALUM. ALUM. ALUM. ALUM. GUTTERGUTTERGUTTERGUTTERENERGY HEELENERGY HEELENERGY HEELENERGY HEELMIN. 1' - 3"MIN. 1' - 3"MIN. 1' - 3"MIN. 1' - 3"ALUM. DRIP ALUM. DRIP ALUM. DRIP ALUM. DRIP EDGE OVER EDGE OVER EDGE OVER EDGE OVER 1x8 FASCIA1x8 FASCIA1x8 FASCIA1x8 FASCIAVENT BAFFLESVENT BAFFLESVENT BAFFLESVENT BAFFLESICE& WATER SHIELD @ ROOF ICE& WATER SHIELD @ ROOF ICE& WATER SHIELD @ ROOF ICE& WATER SHIELD @ ROOF PERIMETER, MIN. 24" FROM PERIMETER, MIN. 24" FROM PERIMETER, MIN. 24" FROM PERIMETER, MIN. 24" FROM INSIDE FACE OF EXTERIOR WALLINSIDE FACE OF EXTERIOR WALLINSIDE FACE OF EXTERIOR WALLINSIDE FACE OF EXTERIOR WALLSTONE ABOVE STONE ABOVE STONE ABOVE STONE ABOVE WINDOW, SEE ELEV. WINDOW, SEE ELEV. WINDOW, SEE ELEV. WINDOW, SEE ELEV. ON SHEET A2ON SHEET A2ON SHEET A2ON SHEET A2----1111FRIEZE BOARD W/ FRIEZE BOARD W/ FRIEZE BOARD W/ FRIEZE BOARD W/ CORNICECORNICECORNICECORNICE2x SUBFASCIA2x SUBFASCIA2x SUBFASCIA2x SUBFASCIAVBVBVBVB----1, SEE FINISH 1, SEE FINISH 1, SEE FINISH 1, SEE FINISH SCHEDULESCHEDULESCHEDULESCHEDULE1' - 0"1' - 0"1' - 0"1' - 0"2X HDR, SEE STRUCT.2X HDR, SEE STRUCT.2X HDR, SEE STRUCT.2X HDR, SEE STRUCT.CONC. FDN, SEE CONC. FDN, SEE CONC. FDN, SEE CONC. FDN, SEE STRUCT.STRUCT.STRUCT.STRUCT.HURRICANE TIE, SEE STRUCT.HURRICANE TIE, SEE STRUCT.HURRICANE TIE, SEE STRUCT.HURRICANE TIE, SEE STRUCT.SLOPE AWAY SLOPE AWAY SLOPE AWAY SLOPE AWAY FROM BLDG.FROM BLDG.FROM BLDG.FROM BLDG.1/2" ANCHOR BOLT1/2" ANCHOR BOLT1/2" ANCHOR BOLT1/2" ANCHOR BOLT2x6 P.T. PLATE ON SILL 2x6 P.T. PLATE ON SILL 2x6 P.T. PLATE ON SILL 2x6 P.T. PLATE ON SILL SEALER & TERMITE SHIELDSEALER & TERMITE SHIELDSEALER & TERMITE SHIELDSEALER & TERMITE SHIELD9' - 6"7' - 0"5" 12"WRAP BRICK AT WRAP BRICK AT WRAP BRICK AT WRAP BRICK AT OPENINGS, TYP.OPENINGS, TYP.OPENINGS, TYP.OPENINGS, TYP.1' - 6"1' - 6"1' - 6"1' - 6"A3-226"6"6"6"5"5"5"5"1' - 6"1' - 6"1' - 6"1' - 6"01 FIRST FLOOR0"14"4"4"4"2"2"2"2"3 5/8"3 5/8"3 5/8"3 5/8"1 1/4"1 1/4"1 1/4"1 1/4"1"1"1"1"5 1/2"5 1/2"5 1/2"5 1/2"5/8"5/8"5/8"5/8"1' - 0"1' - 0"1' - 0"1' - 0"2"2"2"2"R6 ZIP SHEATHING W/ R6 ZIP SHEATHING W/ R6 ZIP SHEATHING W/ R6 ZIP SHEATHING W/ INTEGRAL WEATHER BARRIER, INTEGRAL WEATHER BARRIER, INTEGRAL WEATHER BARRIER, INTEGRAL WEATHER BARRIER, TAPE SEAMS PER MANUF.TAPE SEAMS PER MANUF.TAPE SEAMS PER MANUF.TAPE SEAMS PER MANUF.6 MIL VB @ WARM SIDE6 MIL VB @ WARM SIDE6 MIL VB @ WARM SIDE6 MIL VB @ WARM SIDE2x6 WD. STUD WALL 2x6 WD. STUD WALL 2x6 WD. STUD WALL 2x6 WD. STUD WALL FRAMING @ 16" O.C.FRAMING @ 16" O.C.FRAMING @ 16" O.C.FRAMING @ 16" O.C.5/8" GYP. BD.5/8" GYP. BD.5/8" GYP. BD.5/8" GYP. BD.2x6 P.T. PLATE 2x6 P.T. PLATE 2x6 P.T. PLATE 2x6 P.T. PLATE ON SILL SEALERON SILL SEALERON SILL SEALERON SILL SEALER2" (R10) XPS INSULATION2" (R10) XPS INSULATION2" (R10) XPS INSULATION2" (R10) XPS INSULATION5/8" AB, MIN 12", 5/8" AB, MIN 12", 5/8" AB, MIN 12", 5/8" AB, MIN 12", SEE STRUCT.SEE STRUCT.SEE STRUCT.SEE STRUCT.POSPOSPOSPOS----IIII----TIE ANCHORS @ TIE ANCHORS @ TIE ANCHORS @ TIE ANCHORS @ 16" O.C., VERT & HORIZ.16" O.C., VERT & HORIZ.16" O.C., VERT & HORIZ.16" O.C., VERT & HORIZ.4" NOMINAL 4" NOMINAL 4" NOMINAL 4" NOMINAL STONE VENEERSTONE VENEERSTONE VENEERSTONE VENEERADHERED FLASHING, MIN. 8" ADHERED FLASHING, MIN. 8" ADHERED FLASHING, MIN. 8" ADHERED FLASHING, MIN. 8" UP W. MECH. FASTENED UP W. MECH. FASTENED UP W. MECH. FASTENED UP W. MECH. FASTENED TERM. BARTERM. BARTERM. BARTERM. BARMORTAR NETMORTAR NETMORTAR NETMORTAR NETWEEP VENTS WEEP VENTS WEEP VENTS WEEP VENTS @ 16" O.C.@ 16" O.C.@ 16" O.C.@ 16" O.C.ST. STL. ST. STL. ST. STL. ST. STL. DRIP EDGEDRIP EDGEDRIP EDGEDRIP EDGESLOPESLOPESLOPESLOPE6" COMPACTED 6" COMPACTED 6" COMPACTED 6" COMPACTED GRANULAR FILLGRANULAR FILLGRANULAR FILLGRANULAR FILL4" SLAB ON GRADE 4" SLAB ON GRADE 4" SLAB ON GRADE 4" SLAB ON GRADE ON MIN. 6 MIL VBON MIN. 6 MIL VBON MIN. 6 MIL VBON MIN. 6 MIL VB4"4"4"4"MIN.MIN.MIN.MIN.LIMESTONE SILLLIMESTONE SILLLIMESTONE SILLLIMESTONE SILLPTD. WD. SILLPTD. WD. SILLPTD. WD. SILLPTD. WD. SILLGYP. BD. BEYOND, PTD.GYP. BD. BEYOND, PTD.GYP. BD. BEYOND, PTD.GYP. BD. BEYOND, PTD.VINYL WINDOWVINYL WINDOWVINYL WINDOWVINYL WINDOW6"6"6"6"3 5/8"3 5/8"3 5/8"3 5/8"± 1/4" SHIM SPACE W/± 1/4" SHIM SPACE W/± 1/4" SHIM SPACE W/± 1/4" SHIM SPACE W/LOW EXPANDING FOAM LOW EXPANDING FOAM LOW EXPANDING FOAM LOW EXPANDING FOAM IN CAVITYIN CAVITYIN CAVITYIN CAVITYMASONRY FLASHING W/ MASONRY FLASHING W/ MASONRY FLASHING W/ MASONRY FLASHING W/ END DAMS BOTH SIDESEND DAMS BOTH SIDESEND DAMS BOTH SIDESEND DAMS BOTH SIDESURETHANE SEALANT URETHANE SEALANT URETHANE SEALANT URETHANE SEALANT AND BACKER RODAND BACKER RODAND BACKER RODAND BACKER RODR21 INSULATIONR21 INSULATIONR21 INSULATIONR21 INSULATIONCONC. FDN., CONC. FDN., CONC. FDN., CONC. FDN., SEE STRUCT.SEE STRUCT.SEE STRUCT.SEE STRUCT.NOTCH CONC. FDN.NOTCH CONC. FDN.NOTCH CONC. FDN.NOTCH CONC. FDN.1"1"1"1"1x3 PTD.1x3 PTD.1x3 PTD.1x3 PTD.1' - 6"1' - 6"1' - 6"1' - 6"1 1/2"1 1/2"1 1/2"1 1/2"01 FIRST FLOOR0"1ADA THRESHOLDADA THRESHOLDADA THRESHOLDADA THRESHOLDURETHANE CAULK URETHANE CAULK URETHANE CAULK URETHANE CAULK NEW 4" CONC. SLAB ON NEW 4" CONC. SLAB ON NEW 4" CONC. SLAB ON NEW 4" CONC. SLAB ON GRADE ON 6" COMP. GRADE ON 6" COMP. GRADE ON 6" COMP. GRADE ON 6" COMP. GRANULAR FILL. BROOM GRANULAR FILL. BROOM GRANULAR FILL. BROOM GRANULAR FILL. BROOM FINISH, SLOPE AWAY FROM FINISH, SLOPE AWAY FROM FINISH, SLOPE AWAY FROM FINISH, SLOPE AWAY FROM BLDG. @ 1/4" PER FT.BLDG. @ 1/4" PER FT.BLDG. @ 1/4" PER FT.BLDG. @ 1/4" PER FT.4" CONC. SLAB ON 4" CONC. SLAB ON 4" CONC. SLAB ON 4" CONC. SLAB ON GRADE ON MIN. 6 GRADE ON MIN. 6 GRADE ON MIN. 6 GRADE ON MIN. 6 MIL VB ON 6" COMP. MIL VB ON 6" COMP. MIL VB ON 6" COMP. MIL VB ON 6" COMP. GRANULAR FILLGRANULAR FILLGRANULAR FILLGRANULAR FILLFLOORINGFLOORINGFLOORINGFLOORINGCONC. FDN., CONC. FDN., CONC. FDN., CONC. FDN., SEE STRUCT.SEE STRUCT.SEE STRUCT.SEE STRUCT.#4 DOWELS, SEE STRUCT.#4 DOWELS, SEE STRUCT.#4 DOWELS, SEE STRUCT.#4 DOWELS, SEE STRUCT.THICKENED SLABTHICKENED SLABTHICKENED SLABTHICKENED SLAB11' - 0"1' - 0"1' - 0"1' - 0"3 5/8"3 5/8"3 5/8"3 5/8"3/4"3/4"3/4"3/4"1 1/2"1 1/2"1 1/2"1 1/2"5 1/2"5 1/2"5 1/2"5 1/2"5/8"5/8"5/8"5/8"7' - 0"ZIP R6 SHEATHINGZIP R6 SHEATHINGZIP R6 SHEATHINGZIP R6 SHEATHINGR21 BATT INSUL.R21 BATT INSUL.R21 BATT INSUL.R21 BATT INSUL.2x6 WD. STUD 2x6 WD. STUD 2x6 WD. STUD 2x6 WD. STUD FRAMING @ 16" O.C.FRAMING @ 16" O.C.FRAMING @ 16" O.C.FRAMING @ 16" O.C.HEADER VARIES, HEADER VARIES, HEADER VARIES, HEADER VARIES, SEE STRUCT.SEE STRUCT.SEE STRUCT.SEE STRUCT.5/8" GYP. BD. 5/8" GYP. BD. 5/8" GYP. BD. 5/8" GYP. BD. ON 6 MIL VBON 6 MIL VBON 6 MIL VBON 6 MIL VBVINYL WINDOW, VINYL WINDOW, VINYL WINDOW, VINYL WINDOW, SEE SCHEDULESEE SCHEDULESEE SCHEDULESEE SCHEDULETERM BARTERM BARTERM BARTERM BARBRICK VENEERBRICK VENEERBRICK VENEERBRICK VENEERADHERED FLASHING LAP ADHERED FLASHING LAP ADHERED FLASHING LAP ADHERED FLASHING LAP UP 6" TO SHEATHINGUP 6" TO SHEATHINGUP 6" TO SHEATHINGUP 6" TO SHEATHINGSMOOTH FLAT ARCHSMOOTH FLAT ARCHSMOOTH FLAT ARCHSMOOTH FLAT ARCHSTL. LINTEL, SEE STL. LINTEL, SEE STL. LINTEL, SEE STL. LINTEL, SEE STRUCT.STRUCT.STRUCT.STRUCT.ST. STL. EDGEST. STL. EDGEST. STL. EDGEST. STL. EDGEWINDOW SURROUND WINDOW SURROUND WINDOW SURROUND WINDOW SURROUND FLASHINGFLASHINGFLASHINGFLASHING*DATE OF SIGNATURE: 1/28/22EXP. 12/31/23CARCTIEHRICEAEPPNo. 12100080TREGISREDANAINIDSTATE OFTE5/8" GYP. BD.5/8" GYP. BD.5/8" GYP. BD.5/8" GYP. BD.1/2" ZIP 1/2" ZIP 1/2" ZIP 1/2" ZIP SHEATHINGSHEATHINGSHEATHINGSHEATHING2x6 WD STUD W/ 2x6 WD STUD W/ 2x6 WD STUD W/ 2x6 WD STUD W/ R21 INSULATION R21 INSULATION R21 INSULATION R21 INSULATION PER SPECPER SPECPER SPECPER SPECBRICK VENEERBRICK VENEERBRICK VENEERBRICK VENEERAIR SPACEAIR SPACEAIR SPACEAIR SPACESILL BEYONDSILL BEYONDSILL BEYONDSILL BEYOND± 1/4" SHIM SPACE W/ ± 1/4" SHIM SPACE W/ ± 1/4" SHIM SPACE W/ ± 1/4" SHIM SPACE W/ LOW EXPANDING FOAM LOW EXPANDING FOAM LOW EXPANDING FOAM LOW EXPANDING FOAM IN CAVITYIN CAVITYIN CAVITYIN CAVITYFLASHING TAPE OVER FLASHING TAPE OVER FLASHING TAPE OVER FLASHING TAPE OVER WINDOW FLANGEWINDOW FLANGEWINDOW FLANGEWINDOW FLANGEWOOD CASINGWOOD CASINGWOOD CASINGWOOD CASINGURETHANE SEALANTURETHANE SEALANTURETHANE SEALANTURETHANE SEALANT7/8"7/8"7/8"7/8"EACH SIDEEACH SIDEEACH SIDEEACH SIDE2"2"2"2"BACKER RODBACKER RODBACKER RODBACKER RODMASONRY ANCHORS MASONRY ANCHORS MASONRY ANCHORS MASONRY ANCHORS @ 16" O.C. BOTH @ 16" O.C. BOTH @ 16" O.C. BOTH @ 16" O.C. BOTH DIRECTIONS, PER SPECDIRECTIONS, PER SPECDIRECTIONS, PER SPECDIRECTIONS, PER SPECSILL PER SECTIONSILL PER SECTIONSILL PER SECTIONSILL PER SECTIONMGN CONSULTINGENGINEERS, INC.635 BUTTERFIELD ROADSUITE #310OAKBROOK TERRACE, IL 60181PHONE (630) 627-6078WWW.MGN.ENGINEERINGDESIGN FIRM #184001114-0002INFO@ALLENPEPA.COMTEL: (630) 578-1105215 FULTON ST., GENEVA, IL 60134PROJECT NO.DRAWN BYCHECKED BYSHEETSchematic Design:Design DevelopmentBidding:Permit:POST BID/PERMIT REVISIONS:ISSUE DATE:ALLEN+PEPA COPYRIGHTALLENPEPAA R C H I T E C T S2/18/2022 2:48:34 PMC:\Users\Amanda Kerner\Documents\21-014 Higher Ground Carmel_akernerK6S8R.rvtWALLSECTIONSHIGHER GROUND CARMEL10216 N. MICHIGAN ROADCARMEL, INDIANA 46032FOR PERMIT 1/28/22A3-221-021AKEPOF 47161/28/2212/30/213/4" = 1'-0"1TYP. WALL SECT.3" = 1'-0"4DETAIL @ WALL BASE3" = 1'-0"3DETAIL @ ENTRY/EXIT DOORS3" = 1'-0"2DETAIL @ WINDOW HEAD1/2" = 1'-0"5ZIP WALL AT TYP. FLANGED WIN. 1 OF 21/2" = 1'-0"6ZIP WALL AT TYP. FLANGED WIN. 2 OF 23" = 1'-0"7WINDOW JAMB DETAIL (BRICK)No. Date Description