Loading...
HomeMy WebLinkAboutPerformance Bond EC Engineers EstimateHigher Ground Education Erosion Control Improvements Engineer's Estimate May 31, 2022 Item No.Item Description Unit Estimated Quantity Price Cost 1 Erosion Control Items Inlet protection EACH 11 $100.00 $1,100 Silt fence LF 1,140 $1.50 $1,710 Temporary seed and straw Lump Sum 1 $8,000.00 $8,000 Construction Entrance CY 175 $20.00 $3,500 Native plantings Lump Sum 1 $1,000.00 $1,000 Aqua-Swirl XC-4 Lump Sum 1 $30,000.00 $30,000 Concrete washout Lump Sum 1 $500.00 $500 Rock check dam Lump Sum 1 $1,200.00 $1,200 Rip Rap protection Lump Sum 1 $1,500.00 $1,500 Subtotal $48,510 Total Cost = $48,510