HomeMy WebLinkAboutGuidepost LP stamped approved1" = 20'
Scale:
11/2/2021Date:
03Revision #: 01 Phil Rausch
Higher Ground, Carmel, IN
Landscape Plan:
Hanson Landscape
Landscape Design by:
NORTH
TREE PLANTINGTREE PLANTING
Legend
Qty Botanical Name Common Name S ize
perennials
CA 4 Calamagrostis acutiflora 'Karl Foerster' Karl Foerster Feather Reed Grass 1 Gal .
rd 8 Rosa 'Drift Red'
Little Quickfire Hydrangea hl 24 Hydrangea paniculata 'Little Quickfire'
RED DRIFT ROSE 3 Gal .
Sj 20 Spirea japonica 'Double Play Red' DOUBLE PLAY RED SPIREA 3 gal .
sp 21 Syringa patula 'Miss Kim' Miss Kim Lilac 18"
Evergreen Shrub
BG 15 Buxus 'Green Velvet' Green Velvet Boxwood 15"
Deciduous Tree
Evergreen Tree
to 10 Thuja occidentalis 'Smaragd' EMERALD GREEN ARBORVITAE 6'
18"
gt
12
Gleditsia triacanthos 'Skyline' Skyline Locust
2.5"co
5
Celtis occidentalis COMMON HACKBERRY
2.5"
9qm
2
Quercus macrocarpa BUR OAK 2.5"
cc 2 Cercis canadensis Eastern Redbud 2"
ab 6 ' m .s .Amelanchier 'Autumn Brilliance' Autumn Brilliance Serviceberry
Deciduous Shrub
HS 8 Hemerocallis 'Stella de 'Oro' Stella de Oro Daylily 1 Gal .
ra 28 Ribes alpinum ALPINE CURRANT 18"
sr Syringa reticulata Japanese Tree Lilac 2"2
VD 21 Viburnum dentatum 'Blue Muffin' Blue Muffin Viburnum 24"
JC 17 Juniperus chinensis 'Kallay's Compact' Kallay's Compact Pfitzer Juniper 5 Gal .
PC 16 Panicum virgatum 'Cheyenne Sky' Cheyenne Sky Switch Grass 1 Gal .
8up Ulmus 'Pioneer'' PIONEER ELM 2.5"
ls Liquidambar styraciflua AMERICAN SWEET GUM 4 2.5"
Limelight Hydrangea ht 32 Hydrangea paniculata 'Limelight' 18"
48 48
SHRUB PLANTINGSHRUB PLANTING
Finish grade.
4-CO
5-GT
ote
1.Spa ing a ie depending on
plantpe ie ee plant lit.
2.emo e pla ti planting
ontaine e o e planting.
e a e to eep t e oot
y tem inta t.
PERENNIAL / grass PLANTING
ote
1. Spa ing a ie depending on
plantpe ie ee plant lit.
2. emo e pla ti planting
ontaine e o e planting.
e a e to eep t e oot
y tem inta t.
PERENNIAL / grass PLANTING
Perennials
1/3 Sand
1/3 topsoil
2" layer mushroom compost
finish grade
planting mix:
1/3 mushroom compost
9-QM
21-VD
10-TO
2-SR
CC
CC
4+4-HS
8+8-PC
8-RD
8+12-SJ
3+5+3-SP
5+5-JC
7-JC
2-AB
8-HL
4-BG
2+2+2+2+8-HL
3+3+3+2-BG
2+2-CA
13-RA
15-RA
turf turf
turf
turf
turf
turf
turf
turf
turf
2-CO
4+4+4-HT
2-UP
10+10-HT
2-UP
6-CO
turf
UP
4-LS
UP
UP
34 FT.
54 FT.
35 FT.
30 FT.
CHILDRENS 2-5 YRS
PLAY AREA
TODDLER PLAY AREA
Remove trunk wrap
if necessary.
Remove all wire baskets,
twine and burlap.
Before tree is in the hole,
remove bottom of basket
cutting horizontally.
After tree is in the hole,
remove rest of basket
cutting vertically.
Backfill using existing soil.
Water thoroughly to
eliminate air pockets.
Add 1-2 inches of
hardwood mulch.
Keep mulch 3 inches
from trunk.
Remove tags and
labels.
Prune only dead or
broken branches or
double leaders.
Stake tree
if necessary.
Remove excess soil
to locate and expose
root flare.
Root flare should be
1-2 inches above
finish grade.
LEAVE SOIL UNDER ROOT BALL
UNDISTURBED TO HELP SUPPORT IT
AND REDUCE SETTLING.
hole to be 1 1/2 - 2 TIMES BALL DIAMETER
Remove any container
or twine and burlap
Backfill using existing soil.
Water thoroughly to
eliminate air pockets.
Add 1-2 inches of
hardwood mulch.
Keep mulch 3 inches
from trunk.
Remove tags and
labels.
Prune only dead or
broken branches or
double leaders.
hole to be 1 1/2 - 2 TIMES BALL DIAMETER
LEAVE SOIL UNDER ROOT BALL
UNDISTURBED TO HELP SUPPORT IT
AND REDUCE SETTLING.
Finish grade.
Remove excess soil
to locate and expose
root flare.
Root flare should be
1-2 inches above
finish grade.
10-SP
01/26/22 Daren Mindham