Loading...
HomeMy WebLinkAboutBLDG4-6-PARK-PLACE-C1-TOPO AD A M S S T R E E T 89.3'UNIT 0701PHASE 5 0.681 Ac. +/- PHASE 4 0.337± Ac. PHASE 2 0.347± Ac. PHASE 3 0.716± Ac. BUIL D I N G 2 716 A D A M S S T R E E T 7 UN I T B U I L D I N G BUILDING 7, 704 ADAMS STREETONE STORY MASONRY OFFICE BUILDING10,200 sq. ft.FIN FLOOR = 805.0'UNIT 0501 B U I L D I N G 5 710 ADA M S S T R E E T ONE UNIT B U I L D I N G 7,204 sq. ft. UNIT 030 1 B U I L D I N G 3 714 ADA M S S T R E E T ONE UNI T B U I L D I N G 5,014 sq. f t . SAW CUT ASPHALT FOR CLEAN EDGE FOR NEW SIDEWALK REMOVE EXISTING ASPHALT FOR NEW SIDEWALK INSTALLATION CONNECT TO EXISTING LATERAL FOR NEW PIPE CONNECTION CONNECT EXISTING LATERAL FOR NEW PIPE CONNECTION EXISTING FIRE HYDRANT EXISTING WATER LINE EXISTING TRANSFORMER EXISTING PEDESTAL 1810-028 C1 EXISTING TOPOGRAPHY AND DEMO PLAN PARK PLACE CENTER BUILDINGSKEELER-WEBB ASSOCIATESSOIL MAP N.T.S. LEGEND TAC SUBMITTAL12-19-2018EROSION CONTROL LEGEND TAC REVISIONS04-11-201911 THIS PROPERTY DOES NOT LIE WITHIN A KNOWN FLOOD PLAIN (ZONE X) PER FEMA FLOOD INSURANCE RATE MAP, PANEL NO. 18057C0209G, EFFECTIVE DATE NOVEMBER 19,2014. 1 CONSTRUCTION ENTRANCE WILL BE THE EXISTING PAVEMENT. CONTRACTOR TO PERFORM MAINTENANCE DAILY TO ENSURE MUD DOES NOT LEAVE THE CONSTRUCTION LIMITS. SEE DETAIL 1/C6.2 SILT SOCK WILL BE INSTALLED ON PAVEMENT FOR PERIMETER PROTECTION 1 1 EXISTING DUMPSTER LOCATION DB KLAINCONSTRUCTION2159 Glebe StreetSuite 200Carmel, IN 46032(317) 846-9992BUILDING FOOTPRINT REV.01-12-2022