HomeMy WebLinkAboutBLDG4-6-PARK-PLACE-C1-TOPO AD
A
M
S
S
T
R
E
E
T 89.3'UNIT 0701PHASE 5
0.681 Ac. +/-
PHASE 4
0.337± Ac.
PHASE 2
0.347± Ac.
PHASE 3
0.716± Ac.
BUIL
D
I
N
G
2
716 A
D
A
M
S
S
T
R
E
E
T
7 UN
I
T
B
U
I
L
D
I
N
G BUILDING 7, 704 ADAMS STREETONE STORY MASONRY OFFICE BUILDING10,200 sq. ft.FIN FLOOR = 805.0'UNIT 0501
B
U
I
L
D
I
N
G
5
710 ADA
M
S
S
T
R
E
E
T
ONE UNIT
B
U
I
L
D
I
N
G
7,204 sq. ft.
UNIT 030
1
B
U
I
L
D
I
N
G
3
714 ADA
M
S
S
T
R
E
E
T
ONE UNI
T
B
U
I
L
D
I
N
G
5,014 sq. f
t
.
SAW CUT ASPHALT FOR
CLEAN EDGE FOR NEW
SIDEWALK
REMOVE EXISTING ASPHALT FOR
NEW SIDEWALK INSTALLATION
CONNECT TO EXISTING
LATERAL FOR NEW PIPE
CONNECTION
CONNECT EXISTING LATERAL
FOR NEW PIPE CONNECTION
EXISTING FIRE HYDRANT
EXISTING
WATER LINE
EXISTING
TRANSFORMER
EXISTING
PEDESTAL
1810-028
C1
EXISTING TOPOGRAPHY AND DEMO PLAN PARK PLACE CENTER BUILDINGSKEELER-WEBB ASSOCIATESSOIL MAP
N.T.S.
LEGEND
TAC SUBMITTAL12-19-2018EROSION CONTROL LEGEND TAC REVISIONS04-11-201911
THIS PROPERTY DOES NOT LIE WITHIN A KNOWN FLOOD PLAIN
(ZONE X) PER FEMA FLOOD INSURANCE RATE MAP, PANEL
NO. 18057C0209G, EFFECTIVE DATE NOVEMBER 19,2014.
1
CONSTRUCTION ENTRANCE WILL BE THE EXISTING PAVEMENT.
CONTRACTOR TO PERFORM MAINTENANCE DAILY TO ENSURE MUD
DOES NOT LEAVE THE CONSTRUCTION LIMITS. SEE DETAIL 1/C6.2
SILT SOCK WILL BE INSTALLED ON
PAVEMENT FOR PERIMETER
PROTECTION 1
1
EXISTING DUMPSTER LOCATION
DB KLAINCONSTRUCTION2159 Glebe StreetSuite 200Carmel, IN 46032(317) 846-9992BUILDING FOOTPRINT REV.01-12-2022