HomeMy WebLinkAboutBLDG4-6-PARK-PLACE-C5.3-CARMEL WATER DETAILS1810-028
C5.3CARMEL WATER DETAILS PARK PLACE CENTER BUILDINGSKEELER-WEBB ASSOCIATESTAC SUBMITTAL12-19-2018CARMEL WATER UTILITY REQUIREMENTS:
POSI-CAPS OR THE EQUIVALENT ARE NOW REQUIRED ON ALL
WATER VALVE INSTALLATIONS.
CONTRACTOR TO CALL FOR PRE-CON WITH INSPECTOR PRIOR
TO WATER MAIN INSTALLATION.
CARMEL WATER UTILITY INSPECTORS HAVE THE AUTHORITY TO
MAKE CHANGES IN THE FIELD IF CONDITIONS ARE
WARRANTED.DB KLAINCONSTRUCTION2159 Glebe StreetSuite 200Carmel, IN 46032(317) 846-9992BUILDING FOOTPRINT REV.01-12-2022