Loading...
HomeMy WebLinkAboutBLDG4-6-PARK-PLACE-C5.3-CARMEL WATER DETAILS1810-028 C5.3CARMEL WATER DETAILS PARK PLACE CENTER BUILDINGSKEELER-WEBB ASSOCIATESTAC SUBMITTAL12-19-2018CARMEL WATER UTILITY REQUIREMENTS: POSI-CAPS OR THE EQUIVALENT ARE NOW REQUIRED ON ALL WATER VALVE INSTALLATIONS. CONTRACTOR TO CALL FOR PRE-CON WITH INSPECTOR PRIOR TO WATER MAIN INSTALLATION. CARMEL WATER UTILITY INSPECTORS HAVE THE AUTHORITY TO MAKE CHANGES IN THE FIELD IF CONDITIONS ARE WARRANTED.DB KLAINCONSTRUCTION2159 Glebe StreetSuite 200Carmel, IN 46032(317) 846-9992BUILDING FOOTPRINT REV.01-12-2022