HomeMy WebLinkAboutBLDG4-6-PARK-PLACE-C6.2-SITE-DETAILS1810-028
C6.2SITE DETAILS PARK PLACE CENTER BUILDINGSKEELER-WEBB ASSOCIATESTAC SUBMITTAL12-19-2018CONCRETE WASHOUT - LINED CONTAINER
NOTES:
*AN ESTIMATED CHART OF THE THE AMOUNT OF WATER PER DAY WILL BE ATTACHED
TO SWPPP SHEET.
*SEE SITE PLAN FOR PLACEMENT OF CWO.
*THERE WILL BE NO BELOW GRADE SYSTEMS WITH THIS PROJECT.
*BOX WILL BE MONITORED DAILY BY FOREMAN TO PREVENT OVERFLOW OR
OVERWEIGHT CONDITIONS. WHEN THE FREE BOARD GETS TO WITHIN 18" THE
FOREMAN WILL CALL FOR REMOVAL.
*ALL WASHOUT SLURRY WILL BE TAKEN TO AN APPROVED DUMP SITE BY APPROVED
HAULER.
*SEE ATTACHED SWPPP SHEET FOR CONTRACTORS EMERGENCY SPILL PROCEDURES
FOR CONCRETE SPILLS.
*CONCRETE WASHOUT AREA SHALL BE INSTALLED PRIOR TO ANY CONCRETE
PLACEMENT ON SITE.
*SIGNS SHALL BE PLACED AT THE CONSTRUCTION ENTRANCE. AT THE WASHOUT
AREA, AND ELSEWHERE AS NECESSARY TO CLEARLY INDICATE THE LOCATION OF
THE CONCRETE TRUCKS, PUMPS RIGS AND CWO.
*THE CONCRETE WASHOUT AREA SHALL BE REPAIRED AND ENLARGED OR CLEANED
OUT AS NECESSARY TO MAINTAIN CAPACITY FOR WASTED CONCRETE.
*AT THE END OF CONSTRUCTION, ALL CONCRETE SHALL BE REMOVED, FROM THE
SITE AND DISPOSED OF AT AN APPROVED WASTE SITE.
*WHEN THE CONCRETE WASHOUT ARE IS REMOVED. THE DISTURBED AREA SHALL BE
SEEDED AND MULCHED OR OTHERWISE STABILIZED IN A MANNER APPROVED BY
THE INSPECTOR.
CONTAINER WITH WATERPROOF (10 MIL MIN.) PLASTIC LINER SUPPLIED BY
APPROVED HAULER
SIGN TO INDICATE THE
LOCATION OF THE
CONCRETE WASHOUT
AREA
®
APPR
O
V
A
L
PENDI
N
G
NOT
F
O
R
CON
S
T
R
U
C
TI
O
N
DB KLAINCONSTRUCTION2159 Glebe StreetSuite 200Carmel, IN 46032(317) 846-9992BUILDING FOOTPRINT REV.01-12-20223 OR APPROVED EQUAL TAC COMMENTS03-08-20223Ò
Ò
Ò
Ò
3