Loading...
HomeMy WebLinkAboutDrainage Calculations71 11k V � III ''Ili �� 1100*04,ki AIll • • ., . KEELER-WEBB ASSOCIATES Consrdling Engineers • Planners • Suriej•ors TELEPHONE (317) 574-0140 www.keelerwebb.com 486 Gradle Drive Carmel, Indiana 46032 KWA PROJECT No. 2110-028 January 11, 2022 3/01z QEV SUMMARY KEELER-WEBB ASSOCIATES Corrsidthrg Enghieers • Playnters • Surveyors TELEPHONE (317) 574-0140 www keelerwebb.com 486 Gradle drive Carmel, Indiana 46032 Project PARK PLACE CENTRE BUILDINGS 4 & 6 Subject DRAINAGE SUMMARY Proj. No. 2110-028 Date 310812022 By: ALD Chk:. ALD MASTER DRAINAGE PLAN AND CALCULATIONS SECTION 1 PROJECT NARRATIVE Keeler -Webb Associates is acting as agent surveyor/engineer for Mr. David Klain who is the owner/developer/General Contractor of the above project. Park Place Centre was master planned and built in 1999 and has two remaining building sites in the Commercial Office HPR. Currently, the building pad sites are vacant with all utilities available and all other site improvements in place (i.e., curb cut, signage, site lighting, parking, mailboxes, trash enclosure, etc.). The newly proposed buildings will be constructed by db Klain Construction. Building 4 is a 2-story masonry office building at 712 Adams Street with a 4,382 sq.ft. footprint and Building 6 is a 2-story masonry office building at 708 Adams Street with a 5,255 sq.ft. on the final phase of Block 2, Lot 2, containing 0.835± Acre. There will likely be multiple tenants in each of the office buildings. Other site improvements will include connection to all utilities, installation of ADA ramps and sidewalk in front of the buildings and a new sidewalk between the buildings connecting to the Adams Street sidewalk, mechanical equipment, and concrete patio adjacent to the breakrooms in each building for employees. Parking for employees, and customers will be provided in the spaces shown in the shared parking for all of the buildings in Park Place Center. The building elevations have been designed to match the architectural design elements of a modern federalist theme per the Park Place Centre Master plan approved by the Plan Commission in 1999. Storm water will be collected via gutters and downspouts and directed to a new SWQU structure which is the on -site BMP. Stormwater will be discharged towards Adams Street via an existing private storm sewer and directed to the off -site BMP which is the regional detention pond for Carmel Science and Technology Park. SECTION 2 PARK PLACE CENTRE MASTER PLAN POST -DEVELOPED DRAINAGE REPORT USING 1999 TR55 WITH PEAK 10-YEAR EVENT VALUES USED FOR SIZING STORM SEWER NOTE HIGHLIGHTED PORTION IDENTIFYING AREA SE AS THE AREA FOR BUILDINGS 4 & 6 TIME TO PEAK = 0.48 hr / 29 min. WATERSHED AREA = 1.43 Ac. BUILDING 24,044 sq.ft. or 0.552 Ac., CN=98 PAVEMENT 0.576 Ac., CN=98 GRASS/LANDSCAPING 0.303 Ac., CN=61 TOTAL CN =90.2 Post -DEVELOPED 10— YEAR PEAK FLOW = 4 cfs Post -DEVELOPED 100 — YEAR PEAK FLOW = 6 cfs COMBINED FLOW FROM NE AND SE = 6cfs IN 160' —15" RCP @ 0.8% (DESIGN) AS -BUILT 178' — 15" RCP @ 0.95% SE — The existing watershed will sheet flows across the turf, roof, and pavement. The storm water flows directly into CATCH BASIN SE or 631. Then stormwater flows through the existing 15" RCP under Park Place Center parking lot to the existing curb inlet 1280 in Adams Street. Then stormwater flows through public storm sewer and outlets into the regional detention pond for Carmel Science & Technology Park. SECTION 3 POST -DEVELOPED WATERSHEDS USING TR55 TIME TO PEAK = 0.48 hr / 29 min. WATERSHED AREA = 1.431 Ac. BUILDING 23,439 sq.ft. or 0.538 Ac. (DECREASED SLIGHTLY), CN=98 PAVEMENT 0.576 Ac., CN=98 GRASS/LANDSCAPING 0.317 Ac. (INCREASED SLIGHTLY) , CN=61 TOTAL CN =89.8 (DECREASED SLIGHTLY) Post -DEVELOPED 10— YEAR PEAK FLOW = 4.28 cfs COMBINED FLOW FROM NE AND SE = 6.34 cfs IN AS -BUILT 178' — 15" RCP @ 0.95% = 7.34 cfs (NO CHANGE) STORM SEWER SIZING ALL ROOF DRAINS ARE SIZED TO CONVEY 100-YEAR EVENT PER IBC. ROOF UNDERDRAINS ARE CONNECTED AND DISCHARGE DIRECTLY TO SWQU XC-2 AND TREATED IN THE BMP THEN DISCHARGED VIA 12" PVC TO NEW DOGHOUSE STORM SEWER STRUCTURE OVER EXISTING 15" RCP PRIVATE STORM SEWER BUILDING MINIMUM FLOOD PROTECTION GRADE = 838.90 (SPILLWAY CARMEL SCIENCE & TECHNOLOGY PARK DETENTION POND) MINIMUM LAG ON STRUCTURE 843.94' & 844.01' OK MINIMUM FFE ON STRUCTURE 844.27' & 844.34' OK HIGHEST ADJACENT GRADE ON ANY STRUCTURE 6" BELOW FFE OK SECTION 4 WATER QUALITY VOLUME USING TR55 & 1' RAINFALL OVERALL TIME TO PEAK = 29 min. AREA SE PER HYDROGRAPH HAS WQV = 0.048 Ac.-Ft. & RUNOFF = 0.51 cfs PER INDIANAPOLIS SWQU SELECTION GUIDE XC-2 CAPACITY = 0.57cfs THE ON -SITE WATER QUALITY BMP PROVIDED FOR THIS PROJECT USES A SWQU (XC-2) AS THE BMP FOR THE SMALL AREA. THE COMBINATION OF THIS ON -SITE BMP AND OFF - SITE REGIONAL DETENTION POND WILL PROVIDE SUFFICIENT WATER QUALITY PER CARMEL STANDARDS. 1" RAINFALL PROVIDES 0.51 cfs FOR A PREDICTED ANNUAL REMOVAL EFFICIENCY = 80% OK! XC-2 HEADLOSS = 0.36' INVERT HEAD PROVIDED IN NEW DOGHOUSE STRUCTURE 1 = 1.62' OK! PPC-BLDGs4-6-SU MMARY.docx PARK PLACE CENTRE p M. �� .�• HUG 19 '99 09:40RM f'. 1/1 Adam DeHart Keeler — Webb ix EY O R's .Pt -�7 . r e"� C.,aid,, 7.� 7 C� 'Katfon („ yyutveyot 00)?e (317) 776-84.95 9. (317) 776.96x8 Suite 146 Otia Samilton County Squate `nahleavii�e, 3ndiana ybn6o istgr. August 19, 1999 Re: Carmel Sc & Tech. Ctr — Park Place Centre This is a follow up to my comments at the Carmel Technical Advisory Committee meeting. 1. This proieet is located within the watershed of the Fertig Regulated Drain. Therefore, an Outlet Request Permit is required, 2. The detention for Carmel Science and Technology Center as been provided. 3. Further specific drainage comments fall under the jurisdiction of the Carmel Enginer's office. If you have any questions, please feel free to contact this office at 776-8495. Sincer y, --' Steven T, Cash Plan Reviewer Cc: Carmel NRCS Co. Hwy. •, S • FOR l i .ill{s.-..: • � � 1 �. .� � f ^ �-� 5 :r 47� Attached r pages, including this coverfor faosimile transmission. Should you experience any problem in the receipt of these pages, please call (317) 571-2441 • ask for CoNFIDENTIALITY NOTXCEz•. transmission - private and confidential and are the property Of the sander. The information { . z. in the matarial is i...rivileged and is intended only for the use of the individual (s) or. .. 1. named above. ,Y • are not *- intended r, •{ be advised that any unauthorized disclosure, '{ • , distribution or the taking of any action in reliance an the contents of this telecopied information is strictly prohibited. if you have received this facsimile transmission in error, please immediately notif y us by telephone to arrange f or return of the forwarded documents to us. ONE CNtC SQUARE CARMEL, INDIANA 46032 317/571.2400 TOO/TOO'd qfi/_04 23L)IA=; 219 7407 AQ$ /IP A :TI nnn7.Pn*9VP �IIII�; ' INDIANA iiEPA 0EM OF EN,YIHONh7ENtAL MANAGEMENT Frank O'Bannon Governor Lori F. Kaplan Commissioner We make Indiana a cleaner, healthier place to live Dear Storm Water General Permit Applicant: Re: November 8, 1999 Notice of Sufficiency Park Place Centre Hamilton County 100 North Senate Avenue P.O. Box 6015 Indianapolis, Indiana 46206-6015 (317) 232-8603 (800) 451-6027 www.state.in.us/idem The Notice of Intent (NOI) letter submitted to the Indiana Department of Environmental Management (IDEM) for the above -mentioned project is sufficient to comply with the NOI letter requirements of 327 IAC 15-5 (Rule 5). Enclosed please find a copy of Rule 5, the NPDES General Permit for Storm Water Runoff Associated with Construction Activity. You must comply with all of the requirements of this rule. In accordance with 327 IAC 15-5-10, you are required to implement your Soil Erosion Control Plan, maintain the erosion control structures until your project is complete, and amend your NOI as dates or other facts are altered. The name of this project is Park Place Centre and is located in Hamilton County. This name and county name should be included on any type of correspondence that is submitted to IDEM pertaining to this project. _ If marked with an X, please review the enclosed sheet titled "Developer's Continuing Responsibility" and submit an amended timetable which includes home or building construction, installation of roads and utilities, and revegetation of cleared areas after all construction is complete. This Notice of Sufficiency does not constitute approval of your Soil Erosion Control Plan, nor does it supersede the requirements of your local Soil & Water Conservation District Office (SWCD) or the Indiana Department of Natural Resources. Questions regarding the development or implementation of the Soil Erosion Control Plan may be directed to your county SWCD. Any other questions regarding Rule 5 requirements may be directed to Mr. Michael Thompson at 317/ 233-1864 or 800/ 451-6027 ext.31864. Sincerely, Reggie Baker, Jr., Chief Pretreatment & Urban Wet Weather Section Office of Water Management Enclosure NOTE: An approved Erosion & Sediment Control (E/SC) Plan and a complete Notice of Intent are both required for compliance with Rule 5. The following items have been received and approved by the appropriate agencies: NOI Your E/SC Plan has either not been received or has not yet been approved by the Hamilton County SWCD. Contact the SWCD with questions about the E/SC Plan review. Recycled Paper ® An Equal Opportunity Employer Please Recycle 0 WinTR-55 Current Data Description --- Identification Data --- User: ALD Date: 1/11/2022 Protect: Units: Enaiiss. SubTitle: Areal Units: Acre, State: Indiana County: Hamilton Filename: C:\Users\Adam\Downloads\2021-JOBS\2110-028-dbKLAIN-PARK-PLACE-BLDGs-4-6\POST-DEV-BLDGs4-6.w --- Sub -Area ua_. --- Name Description Reach Area(ac) RCN Tc ------------------------------------------------------------------------------ _� Outlet 1.43 92 0.480 HE Outlet 0.65 91 0.230 Total area: 2.08 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period -Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr (in) (in) (in) (in) (in) (in) (in) -------------------------------------------------------------------------------- 2.9 3.8 4.3 5.0 5.4 6.0 2.6 Storm Data Source: User -provided custom storm data Rainfall Distribution Type: Tvoe "s Dimensionless Unit Hydrograph: <standard> WinTR-55, Version 1.00.09 Page 1 1/11/2022 5:29:46 PM ALD Hamilton County, Indiana Hydrograph Peak/Peak Time Taal Sub -Area Peak Flow and Peak Time (hr) by Rainfall Return Perio,_ or Reach ANALYSIS: Identifier (cfs) ---------------------------------------------------------------------------------- SUBAREAS SE 4.2- 12 .1: NE 2.6 12.02 REACHES OUTLET 6.34 WinTR-55 Version 1.00.09 Page 1 1/11/2022 5:29:46 PM WinTR-66 Output Hydrograph project: 111112022 Subareas: (SE, NE, Outlet) Storm: 10-Yr :;:%Users'Adam'.Dolvnloads',2021-JOBS'.2110-028-dbKLAIN-PARK-PLACE-BLDGs-4-6'�POST-DEV-BLDGs4-6-w5 i 6 ' i f Trial #1, 5E ;— — • Trial #1, NE +i------------ Trial ##1, OLrrLET r t;. 4 i U- I i 3� 21 i 1 2. 4 6 8 10. 12_ 14 16 18. 20. 22. 24, T I M E ihrs=, _rcuiar Section prepared for PARK PLACE CENTER in County, 178' - 15" RCP @ 0.95% Designer: ALD Checker: Date: 01 / 11 /2022 Date: Slone:.0095 ft/ft 'n' value: .0121 SE and NE Diameter: 15 in. Depth of Flow: 14 in. Hydraulic Radius: 0.36 Area: 1.19 sq ft Velocity: 6.15 ft/sec Capacity: 7.34 cfs SWQU CALCULATIONS XC-2 Table of Contents 'ARK-PLACE-BLDGs4-6-1 in.gpw Hydraflow Hydrographs by Intelisolve Tuesday, Jan 11 2022, 6.53 PM 1 -Year SummaryReport.................................................................................................................. 1 HydrographReports............................................................................................................. 2 Hydrograph No. 1, SCS Runoff, SE................................................................................... 2 Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) I Time to peak (min) Volume (acft) Inflow hyd(s) Maximum elevation (ft) I Maximum storage (acft) i Hydrograph description 1 SCS Runoff 0.51 2 732 0.048 -- — SE PARK-PLACE-BLDGs4-6-1 in.gpw Return Period: 1 Year Tuesday, Jan 11 2022, 6:52 PM Hydraflow Hydrographs by Intelisolve Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday. Jan 11 2022. 6:52 PF M Hyd. No. I SE Hydrograph type = SCS Runoff Peak discharge = 0.51 cfs Storm frequency = 1 yrs Time interval = 2 mlr, , Drainage area = 1.43 ac Curve number = 92 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 28.9 min Total precip. = 1.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 000 Hydrograph Volume = 0.048 acft SE Hyd. No. 1 -- 1 Yr 0 2 5 7 9 12 14 16 19 21 23 Hvd No. 1 0 (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 26 Time (hrs) ZJ a)= •- a) CD E E Weg ko m � ax � � " u o Y 2 v w L m 5 AR i o a R N m d $ 7> 2 LL u o -•n c � dN E g c 0' x �._�2 nn E m m v �.N c O� —"¢ r,EE c �o EO >2 E o om a >.Q m( Qt� E E 3 "' 3 "C m >,+� E y r m M C O O •m E ,F 00 O N E m u �— BE � -o M� �E " a• N ul d .0 � � U N !On 'a0 O aj C C d •0 N oO K _ > OV le N .0 C 'E 6 0 C O cm: mtns a�� E—� at - C m:5 O -O O O 1-4 p N y +—m•J d N m _C 0 0 c E E O W U 6O m n•E V 'o 4T E m u m lD N N v N x C I fu J ¢ °u x Xa O E o u U O O m m C E cu LU a� m p O O o n > > E O ko N > N� Q N m > , N N j d E N N € LL. C lu .M. 7 o O _ ryE E E-L \E >„ m (1) E $H C E oE.Eq`o EJ� C£ j O o aq ogL$c� O O vb=`3�givg 9 U E � C E c�Qt"is wee £ CE E 3. > tpN vE wN� S,Ev `E = r u �P E� �qO Ev2� n Non cr M oSen�u"i � �W �T$cLmw`om�E B^;Eic.eD6 m.�� qE' az `o°58i5°1c$�� O .ram E=- g.- u m � c E Z, E E m EE^qoy a E � s •� E�� C t'O 0.7 =3 0 `E HEvoE m E C E dtOO9w ot�m m CD Ln Lo U p v) m O E M a)U c o,E E _ c E 0 l9 n � > N o> m y z m Q n v ado �o CQ O � o� amv £ NE CE ua u E CD g= v E 'EO d u Z V• t=� E O °' u WLf, c t T E"bB ! Ef Ev`v'o 3 m _ Qj E'v m- 63^ E cmo n E a E�7 U� o 0 m> C — 00 o f 'n ti x `n � � o m U QcV) _ aU c c c cnV v� Q. O T O m MN M C`° am+ O E .N-� >, �U 6.� cE ¢x¢cn N tp a O O ra UCL) E a1 E cu LU d g E m {(•.J7 J i ti p o N Q � ;:; 2 a A L m O ¢ m m cn E € `o fn 0 0 U Lq Ln O O Ln Ln O N � V � X � N if) o ... 3 cr 0 M c� a� _ Ln N O N O Ln a --I O r-I O Ln Ln d' Ln M Ln N Ln rl Ln O O O N O O O O O O O O CO M � O O + � i O X � � � II tD Y O I I T I i i City of Indianapolis Stormwater Quality Unit (SQU) Selection Guide Manufactured SQU SQU System Model Max Treatment Flow (cfs) Max 10-yr On -Line Flow Rate (cfs) Cleanout Depth (Inches) Hydro International First Defense High Capacity 3-ft 0.85 1.84 9 4-ft 1.5 3.24 9 5-ft 2.35 5.08 9 6-ft 3.38 7.30 9 7-ft 4.60 9.94 9 8-ft 6.00 12.96 9 HydroStorm by Hydroworks, LLC HS-3 0.50 1.00 6 HS-4 0.88 1.76 6 HS-5 1.37 2.74 6 HS-6 1.98 3.96 6 HS-7 2.69 5.38 6 HS-8 3.52 7.04 6 HS-9 4.45 8.9 6 HS-10 5.49 10.98 6 HS-11 6.65 13.3 6 HS-12 7.91 15.82 6 AquaShield Aqua -Swirl Xcelerator' XC-2 0.57 1.16 6 XC-3 1.13 2.30 6 XC-4 1.86 3.79 6 XC-5 2.78 5.66 6 XC-6 3.88 7.90 6 XC-7 5.17 10.52 6 XC-8 6.64 13.51 6 XC-9 8.29 16.87 6 XC-10 10.13 20.62 6 XC-11 12.15 24.73 6 XC-12 14.35 29.20 6 XC-13 15.53 31.60 6 Contech Cascade Separator CS-3 1.02 2.27 9 CS-4 1.80 4.03 9 CS-5 2.81 6.29 9 CS-6 4.05 9.07 9 CS-8 7.20 16.1 9 CS-10 11.3 1 25.3 1 9 CS-12 16.2 1 36.3 1 9 pg. 2 11 /23/2021 Version 20