HomeMy WebLinkAboutBLDG4-6-PARK-PLACE-C2-SITE A
D
A
M
S
S
T
R
E
E
T
PHASE 4
0.337± Ac.
LDI
N
G
2
716
A
D
A
M
S
S
T
R
E
E
T
7 U
N
I
T
B
U
I
L
D
I
N
G
BUIL
D
I
N
G
4
2-STO
R
Y
M
A
S
O
N
R
Y
OFFI
C
E
B
U
I
L
D
I
N
G
712 ADA
M
S
S
T
R
E
E
T
4,382 ±
s
q
.
f
t. (FO
O
T
P
R
I
N
T
)
BUILDIN
G
6
2-STORY
M
A
S
O
N
R
Y
OFFICE
B
U
I
L
D
I
N
G
708 ADAMS
S
T
R
E
E
T
5,255 ± sq.ft. (FOOTPR
I
N
T
)
NEW CT CABINET VERIFY TYPE,
SIZE & LOCATION WIT
H
U
T
ILITY
NEW
CT C
A
B
I
N
E
T
VERIF
Y
T
Y
P
E
,
SIZE
&
L
O
C
A
T
I
O
N
W
I
T
H
U
T
I
L
ITY
NEW GAS
M
E
T
ER VERIFY TYPE,
SIZE & LO
C
A
T
ION WITH UTILITY
NEW
G
A
S
M
E
T
E
R VERI
F
Y
T
Y
P
E
,
SIZE & LOC
A
T
I
O
N
W
I
T
H
UTILITY
33 L.F. NEW GAS SERVICE
LATERAL BY UTILITY
PROPOSED 141 L.F. - 5' CONCRETE SIDEWALK
S
E
E
D
E
T
A
I
L
O
N
S
H
E
E
T
C
5
.
2
PROP
O
S
E
D
1
1
1
L
.
F
.
-
5
' CONC
R
E
T
E SIDE
WALK
S
E
E DET
A
I
L ON SHEET C5.
2
PROPOSED GAS VALVE AND
CONNECTION VERIFY TYPE, SIZE
AND LOCATION WITH UTILITY
32.67'2.00'34.67'2.00'32.67'45.00'31.46'2.00'37.08'2.00'31.46'45.00'10.7'
12.2
'27.3'31.46'44.0'31.46'2.00'49.75'2.00'4.00'31.46'44.00'31.46'PROPOSED 88 L.F. - 5'CONC. SIDEWALKEXISTING FIRE HYDRANT
EXISTING
WATER LINE
EXISTING
TRANSFORMER
EXISTING
PEDESTAL
49.75'4.00'28.0'15.0'CONCRE
T
E
PATIOSEE DETAILS SHEET C6
.
1
16.0'15.0'CONC
R
E
T
E
PATIOSEE DETAILSSHEET C6.1
41 L.F. NEW GAS SERVICE
LATERAL BY UTILITY
PROPOSED GAS VALVE AND
CONNECTION VERIFY TYPE, SIZE
AND LOCATION WITH UTILITY
NEW 6'x15' CONCRETE BIKE
PARKING SEE DETAIL 1/C6.1
NEW 12' - 6" PVC SANITARY
LATERAL C.O. INV. = 840.27' SEE
DETAIL ON SHEET C6.1
PROPOSED ADA SIDEWALK RAMP SEE
DETAIL E604-SWCR-08 ON SHEET C5.2
PROVIDE 12' - (3)2" PVC CO
N
D
U
I
T
S
TO CT CA
BINET/METEREXISTING TRAN
S
FORMER
PROVI
DE 13' - (3)2" PVC
COND
U
I
TS TO CTCABINET/M
E
T
E
R
EXISTING SANITARY
EXISTING STORM WATER
27.1'20.9'21.7'PROPOSED CONCRETE AC PADS
4'x4' (TYP.)
41 L.F. OF NEW 1" DO
M
E
S
TIC
SERVICE TO INSIDE SET METER, RPZ IN
BUILDING. CONT
R
ACTO
R
TO VERIFY
TYPE, SIZE & LOCA
T
I
ON
50 L.F. O
F
N
E
W
1
"
DOMESTIC
SERVICE TO INSIDE SE
T
M
E
T
E
R, RPZ
IN BUILDI
N
G
.
C
O
N
T
R
A
C
T
O
R
T
O
VERIFY TYPE, SIZE & L
OCATIO
N
NEW 12' - 6" PVC SANITARY
LATERAL C.O. INV. = 801.69'
SEE DETAIL ON SHEET C6.1
PROPOSED ADA SIDEWALK RAMP SEE
DETAIL E604-SWCR-08 ON SHEET C5.2
NEW ADA PARKING SIGN
SEE DETAIL 6/C6.1
NEW ADA PARKING
SIGN SEE DETAIL 6/C6.1
PROPOSED 21 L.F. - 5' CONC. SIDEWALK
CONTRACTOR TO VERIFY TYPE AND SIZE OF
EXISTING WATER CORP STOP WITH UTILITY.
REMOVE EXISTING STUB AND CONNECT NEW
SERVICE TO EXISTING CORP STOP
CONTRACTOR TO VERIFY TYPE AND
SIZE OF EXISTING WATER CORP
STOP WITH UTILITY. REMOVE
EXISTING STUB AND CONNECT NEW
SERVICE TO EXISTING CORP STOP
1810-028
C2
PROPOSED SITE PLAN PARK PLACE CENTER BUILDINGSKEELER-WEBB ASSOCIATESLEGEND TAC SUBMITTAL12-19-2018SEE ARCH PLANS FOR INTERIOR LAYOUT,
AND BUILDING DIMENSIONS
NEW BUILDING DOMESTIC WATER
CONNECTIONS TO EXISTING WATER MAIN
WILL BE WET TAPPED PER CARMEL WATER
SPECIFICATIONS.
NEW WATER METERS AND RPZ TO BE INSIDE
SET PER CARMEL WATER SPECIFICATIONS.
SEE MECHANICAL DRAWINGS FOR DETAILS.TAC REVISIONS04-11-201911
1
1
EXTERIOR LIGHTING, PARKING LAYOUT AND SIGNAGE IS BASED ON
PREVIOUS MASTER DEVELOPMENT PLAN FOR PARK PLACE CENTER
HPR DECLARATION FROM 70-DP/ADLS & 71-99SP IN 1999. ALL AREAS
OUTSIDE OF THE INDIVIDUAL BUILDING UNITS (I.E. BUILDING LINES)
ARE CONSIDERED COMMON AREAS AND ARE ADMINISTERED BY THE
COVENANTS, CONDITIONS, AND RESTRICTIONS OF PARK PLACE
CENTER HPR.
ALL FIRE HYDRANTS ARE EXISTING AND
WERE INSTALLED AS PART OF THE MASTER
DEVELOPMENT IN 1999.
1
1
1
UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE
RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS
REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH
PROPOSED DEVELOPMENT SHALL BE THE DEVELOPER TO RESOLVE
WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE
RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY
LINE
1
ALL EXISTING PERIMETER ROAD DRAINAGE STRUCTURES AND
BRIDGES ACROSS THE FRONTAGE OF THIS DEVELOPMENT ARE
INDICATED ON THE PLANS. PROVISIONS HAVE BEEN MADE TO
IMPROVE OR REPLACE ANY DRAINAGE STRUCTURES AND BRIDGES
AS NECESSARY OR AS REQUEST BY THE CITY TO ACCOMMODATE
THE PAVEMENT WIDENING, AUXILIARY LANES, MULTI-USE PATH, AND
ANY OTHER REQUIRED IMPROVEMENTS TO THE PROPERTY OR THE
ROADWAY. THE COST TO IMPROVE OR REPLACE ANY DRAINAGE
STRUCTURES AND BRIDGES WILL BE BORNE BY THE DEVELOPER
DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL BE
RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE
COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED
TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE
START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION
OF THE RIGHT-OF-WAY BUILDING FOOTPRINT REV.9-29-2021CONCRETE PATIOS ADDED10-13-2021BUILDING FOOTPRINT REV.01-12-2022DB KLAINCONSTRUCTION2159 Glebe StreetSuite 200Carmel, IN 46032(317) 846-9992CONTRACTOR TO CONTACT CENTERPOINT ENERGY FOR GAS
SERVICE APPLICATION. 1-800-227-13763 TAC REVISIONS03-08-20223TAC REVISIONS02-22-202244
4
4
4
06/07/22