Loading...
HomeMy WebLinkAboutC902 Stormwater Pollution & Prevention Plan Notes8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:318-454 MAY 5, 2022 DRAFT11 GIBSON COMMERCIAL CONSTRUCTION TOM WOOD POWERSPORTS 3400 E. 96TH STREET CARMEL, INDIANA 46032 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.comPROFESSIONAL ENGI NE ERINDIANA A A RON C. HURTPE10300058STATE OF-oNR EGISTERED* HAND SIGNATURE ON FILE STORMWATER POLLUTION & PREVENTION PLAN NOTESC902 BEB ACHN/A11 (13) MATERIAL HANDLING AND SPILL PREVENTION(4) POST CONSTRUCTION STORMWATER QUALITY(3) STORMWATER QUALITY IMPLEMENTATION(1) POTENTIAL LANDUSE POLLUTANTS EROSION CONTROL MAINTENANCE REQUIREMENTSK. MONITORING AND MAINTENANCE GUIDELINES(2) LOCATION, DIMENSIONS, SPECIFICATIONS, AND CONSTRUCTION DETAILS OF EACH STORMWATER QUALITY MEASURE(10) LOCATION OF PROPOSED SOIL STOCKPILES(12) EROSION CONTROL MEASURES FOR INDIVIDUAL BUILDING LOTSSWPPP FOR POST CONSTRUCTION- CITY OF CARMEL(3) ESTIMATED PEAK DISCHARGE(7) POTENTIAL CONSTRUCTION POLLUTANTS(2) RECEIVING WATERS(1) HYDROLOGIC UNIT CODESWPPP FOR CONSTRUCTION SITES- CITY OF CARMEL(5) LOCATION WHERE STORMWATER MAY BE DIRECTLYDISCHARGED INTO GROUNDWATER(4) LOCATION WHERE SPECIFIC POINTS OF STORMWATER DISCHARGE LEAVING THE SITE(8) TEMPORARY & PERMANENT STORMWATER QUALITY MEASURESC. CONCENTRATED FLOW SEDIMENT CONTROLB. SHEET FLOW SEDIMENT CONTROLA. CONSTRUCTION ENTRANCE INFORMATION(11-B) PERMANENT SURFACE STABILIZATION(11-A) TEMPORARY SURFACE STABILIZATION DESCRIPTION MEASURES:D. INLET PROTECTION LOCATIONS AND SPECS.E. RUNOFF CONTROL MEASURESF. OUTLET PROTECTION SPECIFICATIONSG. GRADE STABILIZATION MEASURESH. STORMWATER QUALITY DETAILSI. TEMPORARY SURFACE STABILIZATIONJ. PERMANENT SURFACE STABILIZATION(9) GENERAL CONSTRUCTION SEQUENCE(5) POST CONSTRUCTION MAINTENANCE GUIDELINES (14) CONTACT INFORMATION(6) SOIL MAPEROSION CONTROL RESPONSIBLE PERSON: