HomeMy WebLinkAboutC902 Stormwater Pollution & Prevention Plan Notes8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO
REVISION RECORD
DATE:
DWG SCALE:
DRAWN BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:SHEETOFDRAWING NO.:318-454
MAY 5, 2022
DRAFT11 GIBSON COMMERCIAL CONSTRUCTION
TOM WOOD POWERSPORTS
3400 E. 96TH STREET
CARMEL, INDIANA 46032 530 E. Ohio Street · Suite G - Indianapolis, IN 46204
317-655-7777 · 877-746-0749
www.cecinc.comPROFESSIONAL ENGI
NE
ERINDIANA A
A
RON C. HURTPE10300058STATE OF-oNR
EGISTERED* HAND SIGNATURE ON FILE
STORMWATER POLLUTION &
PREVENTION PLAN NOTESC902 BEB
ACHN/A11 (13) MATERIAL HANDLING AND SPILL PREVENTION(4) POST CONSTRUCTION STORMWATER QUALITY(3) STORMWATER QUALITY IMPLEMENTATION(1) POTENTIAL LANDUSE POLLUTANTS EROSION CONTROL MAINTENANCE REQUIREMENTSK. MONITORING AND MAINTENANCE GUIDELINES(2) LOCATION, DIMENSIONS, SPECIFICATIONS, AND CONSTRUCTION DETAILS OF EACH STORMWATER QUALITY MEASURE(10) LOCATION OF PROPOSED SOIL STOCKPILES(12) EROSION CONTROL MEASURES FOR INDIVIDUAL BUILDING LOTSSWPPP FOR POST CONSTRUCTION- CITY OF CARMEL(3) ESTIMATED PEAK DISCHARGE(7) POTENTIAL CONSTRUCTION POLLUTANTS(2) RECEIVING WATERS(1) HYDROLOGIC UNIT CODESWPPP FOR CONSTRUCTION SITES- CITY OF CARMEL(5) LOCATION WHERE STORMWATER MAY BE DIRECTLYDISCHARGED INTO GROUNDWATER(4) LOCATION WHERE SPECIFIC POINTS OF STORMWATER DISCHARGE LEAVING THE SITE(8) TEMPORARY & PERMANENT STORMWATER QUALITY MEASURESC. CONCENTRATED FLOW SEDIMENT CONTROLB. SHEET FLOW SEDIMENT CONTROLA. CONSTRUCTION ENTRANCE INFORMATION(11-B) PERMANENT SURFACE STABILIZATION(11-A) TEMPORARY SURFACE STABILIZATION DESCRIPTION MEASURES:D. INLET PROTECTION LOCATIONS AND SPECS.E. RUNOFF CONTROL MEASURESF. OUTLET PROTECTION SPECIFICATIONSG. GRADE STABILIZATION MEASURESH. STORMWATER QUALITY DETAILSI. TEMPORARY SURFACE STABILIZATIONJ. PERMANENT SURFACE STABILIZATION(9) GENERAL CONSTRUCTION SEQUENCE(5) POST CONSTRUCTION MAINTENANCE GUIDELINES (14) CONTACT INFORMATION(6) SOIL MAPEROSION CONTROL RESPONSIBLE PERSON: