HomeMy WebLinkAboutSite Plan_Stamped Approved 06-13-22EA
S
T
N
EW
MARK
E
T
S
TR
E
E
T
G
G
G
G
GGG G
G G G G G G GCCCC
CCCC
C C C C CW
W W W W W
TYP.
TYP.
11 116
EMERICK
ORTHODONTICS
D D D D
D
D
D D D D D D D D D D D D DDDDDDDDDDDDDDDDDDDDDDDDDDDDDD
DDDDDD6
4
3
P1
P1
P1
P1
H1
H1
H1
H1
H1
H2 H2 H2
H2
H3
S1
S1
P3
P4
P4
P4
P4
P4
P4
P3
P3 P3
H1
S1
TYP.
H4
H4
H4
H4
H3 H3
H1
A1
TYP.
A2
H6
H7
H5
H7
H8
H9
A1
C200SITE PLANw210436-C200 siteSITE PLAN NOTES
PAVEMENT
STANDARD DUTY ASPHALT PAVING
STANDARD DUTY CONCRETE WITH 1' CHAMFERED CORNERS
STORM INLET WITH CONCRETE APRON SHOWN ON SHEET C302
MATCH EXISTING PAVEMENT
HARDSCAPE
6" CURB AND GUTTER
MATCH EXISTING CURB
CURB TURN OUT
LIGHT POLE - TO MATCH EXISTING LIGHT POLES AND CONNECT TO
EXISTING ELECTRICAL.
TAPER CURB WITHIN 3 FEET
PAVEMENT FLUSH WITH SIDEWALK
LANDING
ACCESSIBLE RAMP
MATCH EXISTING SIDEWALK
SIGNAGE & MARKINGS
4" PAINTED WHITE SOLID LINES (TYP)
ACCESSIBLE PARKING SPACE WITH SIGNAGE
ACCESSORIES
PARKING BARRIER
H1
H2
H3
S1
P1
P2
P3
P4
ELECTRICAL RISER
GUY ANCHOR
ELECTRIC JUNCTION BOX
ORNAMENTAL LIGHT
GENERATOR
STREET LIGHT
ELECTRIC MANHOLE
ELECTRIC OUTLET
UTILITY POLE
UTILITY POLE W/ TRANSFORMER
TRANSFORMER
COMMUNICATIONS JUNCTION BOX
COMMUNICATIONS MANHOLE
COMMUNICATIONS PEDESTAL
RIGHT OF WAY LINE
FENCE
GUARD RAIL
BUILDING SETBACK LINE
BOUNDARY LINE
CISTERN
DRINKING FOUNTAIN
FIRE DEPT HOOKUP
FIRE HYDRANT
POST INDICATOR VALVE
CHILLED WATER MANHOLE
WATER MANHOLE
SPRINKLER CONTROL BOX
SPRINKLER CONTROL VALVE
SPRINKLER
SPIGOT
WELL HEAD
WATER METER
WATER VALVE
GAS METER
GAS VALVE
ELECTRIC METER
LIQUID PROPANE GAS TANK
MONITORING WELL
TRAFFIC SIGNAL POLE
TRAFFIC SIGNAL
BOLLARD
FLAG POLE
PARKING METER
POST
SIGN
PARKING WHEEL STOP
DOWN SPOUT
ACCESSIBLE SPACE
GATE POST
COMMUNICATIONS RISER
STORM CLEANOUT
BEEHIVE INLET
CURB INLET
FLOOR DRAIN
ROUND INLET
SQUARE INLET
STORM MANHOLE
SANITARY SEWER CLEANOUT
LIFT STATION
SANITARY SEWER MANHOLE
SANITARY STUB MARKER
SEPTIC TANK
PARKING LOT LIGHT (1 HEAD)
PARKING LOT LIGHT (3 HEAD)
PARKING LOT LIGHT (4 HEAD)
PARKING LOT LIGHT (2 HEAD)HEAVY DUTY ASPHALT
CONCRETE PAVEMENT
RIGHT OF WAY PAVEMENT
DISTRIBUTION BOX
ROW RIGHT OF WAY
BSL BUILDING SETBACK LINE
ESMT EASEMENT
D.&U.E. DRAINAGE AND UTILITY EASEMENT
FFE FINISH FLOOR ELEVATION
12 PARKING COUNT
STANDARD DUTY ASPHALT
STONE
PAVEMENT
SITE PLAN LEGEND
UTILITIES
ABBREVIATIONS
OTHER
LINE TYPES REVISIONS AND ISSUESPart of SW/4, Section 28, Township 18 North, Range 3 East, Clay Township, Hamilton County, IndianaW21.0436PREPARED FOR:SOUTH OF BROUGHTON ST., EAST OF BROAD ST., NORTH OF HORSEFERRY RD., WEST OF BIRD CAGE WALKPROJECT NO.
SHEET NO.CHECKED BY:DRAWN BY:JKDESIGNED BY:DWG NAME:PROJECT NO.:W21.0436DATEBY11.19.2021MLTDATE:RLWKnow what'sbelow.
before you dig.Call
R
DB KLAIN CONSTRUCTIONVILLAGE OF WEST CLAY BLOCK "D" PARKING LOTPLANS RESUBMITTED FOR COMMENTS05.12.2022RLWENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netB uild with conf idence.S M
W
S
N
E
RUSSELL L. WEBSTER II, PE No. 11900318RUSSELL L .WEBST
ER IIPROFESSION A L E NGINEERREGISTER
E
DINDI A N A
No. PE11900318
STATE OF
APP
R
O
V
AL PENDI
NG
NOT F
O
R CONST
R
U
CTI
O
N
SITE PLAN GENERAL NOTES
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, OR
VERIFYING THAT ALL PERMITS AND APPROVALS ARE OBTAINED FROM THE
RESPECTIVE CITY, COUNTY, AND STATE AGENCIES PRIOR TO STARTING
CONSTRUCTION.
2. ALL QUANTITIES GIVEN ON THESE PRINTS, VERBALLY OR IN THE SCOPE OF
WORK SECTION ARE ESTIMATES AND SHALL BE CONFIRMED BY THE
BIDDING CONTRACTORS.
3. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
STANDARDS FOR EXCAVATIONS; FINAL RULE 29 CFR PART 1926, SUBPART
"P" APPLIES TO ALL EXCAVATIONS EXCEEDING FIVE (5) FEET IN DEPTH. IN
ADDITION, EXCAVATION EXCEEDING TWENTY (20) FEET IN DEPTH REQUIRE
THE DESIGN OF A TRENCH SAFETY SYSTEM BY A REGISTERED
PROFESSIONAL ENGINEER.
4. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER AND CONTRACTOR
TO MAINTAIN QUALITY CONTROL THROUGHOUT THIS PROJECT.
5. TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO
APPLICABLE LOCAL STANDARDS.
6. BEARINGS, DIMENSIONS, AND EASEMENTS ARE SHOWN FOR REFERENCE
ONLY. SEE RECORD SURVEYS AND PLATS FOR EXACT INFORMATION.
7. THE ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE
CONSTRUCTION MEANS AND METHODS ASSOCIATED WITH THE PROJECT.
8. ALL DIMENSIONS ARE BASED ON FACE OF CURB OR BACK OF ROLL CURB
OR FACE OF BUILDING.
9. SEE ARCHITECTURAL PLANS FOR DETAILS OF BUILDING, BUILDING
DIMENSIONS AND SIGNAGE SPECIFICATIONS. DO NOT STAKE BUILDING
FROM THESE PLANS.
10. COORDINATE CONSTRUCTION ACTIVITIES WITH ADJOINING WORK IF
APPLICABLE. VERIFY EXTENT OF ADJOINING WORK AND COORDINATE AS
REQUIRED.
11. FIELD VERIFY EXISTING CURBS AND TAPER PROPOSED VERTICAL CURBS
TO MATCH WITHIN A MIN. OF THREE (3) FEET.
12. ± DIMENSIONS INDICATE FIELD DIMENSION ADJUSTMENT AREA BASED ON
ACTUAL FIELD LAYOUT COORDINATES.
13. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO
START OF CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE
PLANS FROM ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL
NOTIFY THE ENGINEER IMMEDIATELY.
14. PROVIDE SMOOTH TRANSITION FROM NEWLY PAVED AREAS TO EXISTING
AREAS AS NECESSARY. ALL AREAS WHERE PROPOSED PAVEMENT MEETS
EXISTING PAVEMENT, THE EXISTING EDGE OF PAVEMENT SHALL BE FREE
OF ALL LOOSE DEBRIS. THE EDGE OF EXISTING ASPHALT PAVEMENT
SHALL BE PROPERLY SEALED WITH A TACK COAT MATERIAL IN ALL AREAS
WHERE NEW ASPHALT PAVEMENT IS INDICATED TO JOIN EXISTING.
15. RESURFACE OR RECONSTRUCT AT LEAST TO ORIGINAL CONDITIONS ALL
AREAS WHERE THE EXISTING PAVEMENT OR LAWNS ARE DAMAGED
DURING CONSTRUCTION FROM TRAFFIC BY CONTRACTORS,
SUBCONTRACTORS, OR SUPPLIERS AFTER CONSTRUCTION WORK IS
COMPLETE.
16. THE CONTRACTOR SHALL PROTECT AND NOT DESTROY THE PROPERTY
CORNER MONUMENTS DURING CONSTRUCTION.
17. REFER TO ARCHITECTURAL PLANS FOR BUILDING ACCESSORY DETAILS.
18. REFER TO SHEET C201 FOR SITE PLAN DETAILS UNLESS OTHERWISE
NOTED.
SITE DATA
SITE AREA = 1.77 AC
PERCENT IMPERVIOUS = 92%
ZONING = PUD
FRONT YARD BSL REQUIRED = 10 FT
H4
A1
FIRE TRUCK MOVEMENT
S2
H5
H6
H7
H8
H9
06/13/22