Loading...
HomeMy WebLinkAboutSite Plan_Stamped Approved 06-13-22EA S T N EW MARK E T S TR E E T G G G G GGG G G G G G G G GCCCC CCCC C C C C CW W W W W W TYP. TYP. 11 116 EMERICK ORTHODONTICS D D D D D D D D D D D D D D D D D D DDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DDDDDD6 4 3 P1 P1 P1 P1 H1 H1 H1 H1 H1 H2 H2 H2 H2 H3 S1 S1 P3 P4 P4 P4 P4 P4 P4 P3 P3 P3 H1 S1 TYP. H4 H4 H4 H4 H3 H3 H1 A1 TYP. A2 H6 H7 H5 H7 H8 H9 A1 C200SITE PLANw210436-C200 siteSITE PLAN NOTES PAVEMENT STANDARD DUTY ASPHALT PAVING STANDARD DUTY CONCRETE WITH 1' CHAMFERED CORNERS STORM INLET WITH CONCRETE APRON SHOWN ON SHEET C302 MATCH EXISTING PAVEMENT HARDSCAPE 6" CURB AND GUTTER MATCH EXISTING CURB CURB TURN OUT LIGHT POLE - TO MATCH EXISTING LIGHT POLES AND CONNECT TO EXISTING ELECTRICAL. TAPER CURB WITHIN 3 FEET PAVEMENT FLUSH WITH SIDEWALK LANDING ACCESSIBLE RAMP MATCH EXISTING SIDEWALK SIGNAGE & MARKINGS 4" PAINTED WHITE SOLID LINES (TYP) ACCESSIBLE PARKING SPACE WITH SIGNAGE ACCESSORIES PARKING BARRIER H1 H2 H3 S1 P1 P2 P3 P4 ELECTRICAL RISER GUY ANCHOR ELECTRIC JUNCTION BOX ORNAMENTAL LIGHT GENERATOR STREET LIGHT ELECTRIC MANHOLE ELECTRIC OUTLET UTILITY POLE UTILITY POLE W/ TRANSFORMER TRANSFORMER COMMUNICATIONS JUNCTION BOX COMMUNICATIONS MANHOLE COMMUNICATIONS PEDESTAL RIGHT OF WAY LINE FENCE GUARD RAIL BUILDING SETBACK LINE BOUNDARY LINE CISTERN DRINKING FOUNTAIN FIRE DEPT HOOKUP FIRE HYDRANT POST INDICATOR VALVE CHILLED WATER MANHOLE WATER MANHOLE SPRINKLER CONTROL BOX SPRINKLER CONTROL VALVE SPRINKLER SPIGOT WELL HEAD WATER METER WATER VALVE GAS METER GAS VALVE ELECTRIC METER LIQUID PROPANE GAS TANK MONITORING WELL TRAFFIC SIGNAL POLE TRAFFIC SIGNAL BOLLARD FLAG POLE PARKING METER POST SIGN PARKING WHEEL STOP DOWN SPOUT ACCESSIBLE SPACE GATE POST COMMUNICATIONS RISER STORM CLEANOUT BEEHIVE INLET CURB INLET FLOOR DRAIN ROUND INLET SQUARE INLET STORM MANHOLE SANITARY SEWER CLEANOUT LIFT STATION SANITARY SEWER MANHOLE SANITARY STUB MARKER SEPTIC TANK PARKING LOT LIGHT (1 HEAD) PARKING LOT LIGHT (3 HEAD) PARKING LOT LIGHT (4 HEAD) PARKING LOT LIGHT (2 HEAD)HEAVY DUTY ASPHALT CONCRETE PAVEMENT RIGHT OF WAY PAVEMENT DISTRIBUTION BOX ROW RIGHT OF WAY BSL BUILDING SETBACK LINE ESMT EASEMENT D.&U.E. DRAINAGE AND UTILITY EASEMENT FFE FINISH FLOOR ELEVATION 12 PARKING COUNT STANDARD DUTY ASPHALT STONE PAVEMENT SITE PLAN LEGEND UTILITIES ABBREVIATIONS OTHER LINE TYPES REVISIONS AND ISSUESPart of SW/4, Section 28, Township 18 North, Range 3 East, Clay Township, Hamilton County, IndianaW21.0436PREPARED FOR:SOUTH OF BROUGHTON ST., EAST OF BROAD ST., NORTH OF HORSEFERRY RD., WEST OF BIRD CAGE WALKPROJECT NO. SHEET NO.CHECKED BY:DRAWN BY:JKDESIGNED BY:DWG NAME:PROJECT NO.:W21.0436DATEBY11.19.2021MLTDATE:RLWKnow what'sbelow. before you dig.Call R DB KLAIN CONSTRUCTIONVILLAGE OF WEST CLAY BLOCK "D" PARKING LOTPLANS RESUBMITTED FOR COMMENTS05.12.2022RLWENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netB uild with conf idence.S M W S N E RUSSELL L. WEBSTER II, PE No. 11900318RUSSELL L .WEBST ER IIPROFESSION A L E NGINEERREGISTER E DINDI A N A No. PE11900318 STATE OF APP R O V AL PENDI NG NOT F O R CONST R U CTI O N SITE PLAN GENERAL NOTES 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, OR VERIFYING THAT ALL PERMITS AND APPROVALS ARE OBTAINED FROM THE RESPECTIVE CITY, COUNTY, AND STATE AGENCIES PRIOR TO STARTING CONSTRUCTION. 2. ALL QUANTITIES GIVEN ON THESE PRINTS, VERBALLY OR IN THE SCOPE OF WORK SECTION ARE ESTIMATES AND SHALL BE CONFIRMED BY THE BIDDING CONTRACTORS. 3. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS FOR EXCAVATIONS; FINAL RULE 29 CFR PART 1926, SUBPART "P" APPLIES TO ALL EXCAVATIONS EXCEEDING FIVE (5) FEET IN DEPTH. IN ADDITION, EXCAVATION EXCEEDING TWENTY (20) FEET IN DEPTH REQUIRE THE DESIGN OF A TRENCH SAFETY SYSTEM BY A REGISTERED PROFESSIONAL ENGINEER. 4. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER AND CONTRACTOR TO MAINTAIN QUALITY CONTROL THROUGHOUT THIS PROJECT. 5. TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL STANDARDS. 6. BEARINGS, DIMENSIONS, AND EASEMENTS ARE SHOWN FOR REFERENCE ONLY. SEE RECORD SURVEYS AND PLATS FOR EXACT INFORMATION. 7. THE ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS ASSOCIATED WITH THE PROJECT. 8. ALL DIMENSIONS ARE BASED ON FACE OF CURB OR BACK OF ROLL CURB OR FACE OF BUILDING. 9. SEE ARCHITECTURAL PLANS FOR DETAILS OF BUILDING, BUILDING DIMENSIONS AND SIGNAGE SPECIFICATIONS. DO NOT STAKE BUILDING FROM THESE PLANS. 10. COORDINATE CONSTRUCTION ACTIVITIES WITH ADJOINING WORK IF APPLICABLE. VERIFY EXTENT OF ADJOINING WORK AND COORDINATE AS REQUIRED. 11. FIELD VERIFY EXISTING CURBS AND TAPER PROPOSED VERTICAL CURBS TO MATCH WITHIN A MIN. OF THREE (3) FEET. 12. ± DIMENSIONS INDICATE FIELD DIMENSION ADJUSTMENT AREA BASED ON ACTUAL FIELD LAYOUT COORDINATES. 13. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO START OF CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 14. PROVIDE SMOOTH TRANSITION FROM NEWLY PAVED AREAS TO EXISTING AREAS AS NECESSARY. ALL AREAS WHERE PROPOSED PAVEMENT MEETS EXISTING PAVEMENT, THE EXISTING EDGE OF PAVEMENT SHALL BE FREE OF ALL LOOSE DEBRIS. THE EDGE OF EXISTING ASPHALT PAVEMENT SHALL BE PROPERLY SEALED WITH A TACK COAT MATERIAL IN ALL AREAS WHERE NEW ASPHALT PAVEMENT IS INDICATED TO JOIN EXISTING. 15. RESURFACE OR RECONSTRUCT AT LEAST TO ORIGINAL CONDITIONS ALL AREAS WHERE THE EXISTING PAVEMENT OR LAWNS ARE DAMAGED DURING CONSTRUCTION FROM TRAFFIC BY CONTRACTORS, SUBCONTRACTORS, OR SUPPLIERS AFTER CONSTRUCTION WORK IS COMPLETE. 16. THE CONTRACTOR SHALL PROTECT AND NOT DESTROY THE PROPERTY CORNER MONUMENTS DURING CONSTRUCTION. 17. REFER TO ARCHITECTURAL PLANS FOR BUILDING ACCESSORY DETAILS. 18. REFER TO SHEET C201 FOR SITE PLAN DETAILS UNLESS OTHERWISE NOTED. SITE DATA SITE AREA = 1.77 AC PERCENT IMPERVIOUS = 92% ZONING = PUD FRONT YARD BSL REQUIRED = 10 FT H4 A1 FIRE TRUCK MOVEMENT S2 H5 H6 H7 H8 H9 06/13/22