HomeMy WebLinkAboutLandscape Plan(5) Rho-x(3) Pic-d(7) Hyd-d(4) Gle-d(8) Hyd-d(1) Cer-c(3) Pic-d(5) Hyd-d(2) Rho-x(6) Hyd-q(3) Que-x(2) Rho-x(2) Vib-s(2) Rho-x(2) Vib-s(3) Cer-c(3) Ham-v(1) Ham-v(4) Vib-s(7) Syr-p(6) Jun-s(7) Ile-sky(5) Nys-s(1) Que-rR/W Plantingsby Others.Future DevelopmentFuture DevelopmentTREESQT<%2TANICAL NA0EC2002N NA0EC2NT CALRE0AR.SCer-c4Cercis canadensisEasWern Redbud% %min 6C hWmulWi-Wrunk maWchedGle-d4GlediWsia WriacanWhos inermis
Draves
T0SWreeW .eeper Honey LocusW% %min 25 calIull sWronJ cenWral leader maWchedJun-s6Juniperus scopulorum
SkyrockeW
SkyrockeW Juniper% %min 6C hWIull sWronJ cenWral leader maWched symmenWricalNys-s5Nyssa sylvaWicaSour Gum% %min 25 calIull sWronJ cenWral leader maWchedPic-d6Picea Jlauca CDensaWaC%lack Hills Spruce% %min 6C hWIull sWronJ cenWral leader maWched symmeWricalQue-x3Quercus robur C)asWiJiaWaCColumnar EnJlish 2ak% %min 25 calsprinJ duJ Iull sWronJ cenWral leader maWchedQue-r1Quercus rubraRed 2ak% %min 25 calIull sWronJ cenWral leader maWchedSHRU%SQT<%2TANICAL NA0EC2002N NA0ESI=EHEIGHTRE0AR.SHam-v4Hamamelis virJinianaCommon :iWch Ha]elconWainer18 hW minspace # 1C- ocHyd-d2HydranJea macrophylla
%iJ Daddy
%iJ Daddy HydranJeaconWainer18 hW minspace # 5C- ocHyd-q6HydranJea querciIolia2akleaI HydranJeaconWainer18 hW minspace # 4C- ocIle-sky7Ilex crenaWa
Sky Pencil
Sky Pencil Japanese HollyconWainer4C hWspace # 4
- ocRho-x13Rhododendron x CPJ0CPJ0 RhododendronconWainer18 hW minspace # 5C- ocSyr-p7SyrinJa paWula C0iss .imC0iss .im LilacconWainer18 hW minspace # 4C- ocVib-s8Viburnum plicaWum WomenWosum CSummer SnoZIlakeCSummer SnoZIlake Japanese SnoZballconWainer18 hW minspace # 6C- ocPLANT SCHEDULEPLANTING PLANL4010Scale 1" = 20'-0"40'20'10'North1.Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer toPlant Schedule and Planting Details for additional information.2.All materials are subject to the approval of the Landscape Architect and Owner at anytime. Landscape Architect to inspect all plant locations and plant bed conditions prior toinstallation. On-site adjustments may be required.3.Rootballs shall meet or exceed size standards as set forth in 'American Standards forNursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT.4.Remove from the site any plant material that turns brown or defoliates within five (5)days after planting. Replace immediately with approved, specified material.5.Plant counts indicated on drawings are for Landscape Architect's use only. Contractorshall make own plant quantity takeoffs using drawings, specifications, and plant schedulerequirements (i.e., spacing), unless otherwise directed by Landscape Architect.Contractor to verify bed measurements and install appropriate quantities as governed byplant spacing per schedule. Plant material quantities shown on plan are minimumquantities. Additional material may be needed to meet spacing requirements and fieldconditions.6.Seed all areas disturbed by construction activities that are not otherwise noted to receivepavement, planting bed, or sod treatment.7.The Contractor shall install and/or amend topsoil in all proposed bed areas to meetSpecifications. Contractor shall coordinate quantity and placement of topsoil.Landscaper shall verify depth of topsoil prior to plant installation. (Refer to specificationsfor topsoil source and placement requirements)8.All tree locations shall be marked with 2x2" stakes prior to planting for review andapproval by the Landscape Architect. Any plant material installed in an incorrectlocation, by the judgment of the Landscape Architect, shall be reinstalled at theContractor's expense.9.All plant beds shall receive 3" minimum of shredded hardwood bark mulch (unlessotherwise noted).10.Verify all utility locations in the field prior to beginning work. Repair all damaged utilitiesto Owner's satisfaction at no additional cost.11.The Contractor shall maintain all plant material and lawns until the project is fullyaccepted by the Landscape Architect, unless otherwise noted.12.All workmanship and materials shall be guaranteed by the Contractor for a period of onecalendar year after Final Acceptance.13.Install all plant material in accordance with all local codes and ordinances. Coordinatewith the Owner to obtain any required permits necessary to complete work.14.Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than24 hours shall be installed using tree pit drainage.15.Tree Protection Fencing is the responsibility of the Contractor. Minimum protected areashall include the full drip line of the canopy. NO construction activities, material storage,etc. may occur within that area. The Contractor shall ensure that no soil compaction ortree damage occurs in any Protected areas, at any time during the construction process.16.Trees shall be matched in groups unless otherwise noted.GENERAL LANDSCAPE ANDPLANTING NOTESDRA:ING TITLECERTI)IED %<DRA:ING NU0%ERPR2JECT NU0%ERREVISI2NSSC2PE DRA:INGS These draZinJs indicaWe Whe Jeneral scope oI Whe proMecWin Werms oI archiWecWural desiJn concepW Whe dimensions oIWhe buildinJ Whe maMor archiWecWural elemenWs and Whe WypeoI sWrucWural mechanical and elecWrical sysWems The draZinJs do noW necessarily indicaWe or describe allZork required Ior Iull perIormance and compleWion oI WherequiremenWs oI Whe ConWracW 2n Whe basis oI Whe Jeneral scope indicaWed or describedWhe Wrade conWracWors shall Iurnish all iWems required Ior Wheproper execuWion and compleWion oI Whe ZorkISSUE DATEDRA:N %<CHEC.ED %<5825 Lawton Loop E. Dr. | Indianapolis, IN 46216
317-485-6900 | www.context-design.comN2T )2RC2NSTRUCTI2N612220AJS)A0IL< 2))ICE
ADLS SU%0ITTAL
3RD AVENUE S:
CAR0EL INDIANA 4632
PURE DEVEL2P0ENT HQ 3rd AVENUE SWEMERSON ROADZoned : C2, Surrounding Properties: R15.21 LS-03: C1 and C2 Landscaping StandardsB.Street Trees: Shade trees shall be planted along all streets with the ROW, parallel to the street.C.Bufferyards (C2 District Only)1.Buffferyards shall be required along any side and/or rear lot line abutting aside or rear lot line of detached single family residences and shall extend theentire length of the line.2.Minimum Bufferyard with shall be equal to the building height of the nearestbuilding to each side or rear lot line, not to exceed 35'3.The minimum planting standard shall be Bufferyard C as set forth in theBufferyard Table prescribed in Article 5, Section 5.19(F)(1): Bufferyards.Shade/Evergreen Trees = 6 per 100 lf.Ornamental Trees = 1 per 100 lf.Shrubs = 15 per 100 lf.West Bufferyard:Required:76.43 lf = 6(76.43)/100 = 5 Shade/Evergreen Trees76.43 lf. = 1(76.43)/100 = 1 Ornamental Tree76.43 lf. = 15(76.43)/100 = 11 ShrubsProvided:5 Shade/Evergreen Trees, 1 Ornamental Tree, & 11 ShrubsNorthwest Bufferyard:Required:231.22 lf. = 6(231.22)/100 = 14 Shade/Evergreen Trees231.22 lf. = 1(231.22)/100 = 2 Ornamental Trees231.22 lf. = 15(231.22)/100 = 35 ShrubsProvided:14 Shade/Evergreen Trees, 2 Ornamental Trees & 35 ShrubsNorth Bufferyard:Required:102.11 lf. = 6(102.11)/100 = 6 Shade/Evergreen Trees102.11 lf. = 1(102.11)/100 = 1 Ornamental Trees102.11 lf. = 15(102.11)/100 = 15 ShrubsProvided:6 Evergreen Trees, 1 Ornamental Trees, 17 ShurbsNo foundation or Parking Perimeter Plantings required for C2PLANTING ORDINANCEREQUIREMENTSAreas to be SeededPROPOSEDBUILDINGPROPOSEDBUILDING
PLANTING DETAILSL410DRAWING TITLE:CERTIFIED BY:DRAWING NUMBERPROJECT NUMBERREVISIONS:SCOPE DRAWINGS: These drawings indicate the general scope of the projectin terms of architectural design concept, the dimensions ofthe building, the major architectural elements and the typeof structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe allwork required for full performance and completion of therequirements of the Contract. On the basis of the general scope indicated or described,the trade contractors shall furnish all items required for theproper execution and completion of the work.ISSUE DATEDRAWN BYCHECKED BY5825 Lawton Loop E. Dr. | Indianapolis, IN 46216
317-485-6900 | www.context-design.comNOT FORCONSTRUCTION06/10/2022MAJSFAMILY OFFICE
ADLS SUBMITTAL
3RD AVENUE SW
CARMEL, INDIANA 46032
PURE DEVELOPMENT HQ &456PERENNIAL PLANTINGNot to ScaleNote: All perennial beds shall be plantedusing triangular planting scheme. Refer toPlanting Schedule for On-Center plantingdimension.3" Shredded Hardwood Bark MulchRemove Container12" Prepared Soil; Refer to SpecificationsCompacted SubgradeExisting GradeGROUNDCOVER PLANTINGNot to ScaleNote: All groundcover beds shall be plantedusing triangular planting scheme. Refer toPlanting Schedule for On-Center plantingdimension.Refer to Plans for Finish Grade.3" Shredded Hardwood Bark MulchSplit Peat Pot12" Prepared Soil; Refer to SpecificationsCompacted SubgradeSPADE EDGENot to ScaleExisting GradeArea to Receive Hardwood Bark MulchTopsoil (As Specified)5"3"3"1DECIDUOUS TREE PLANTING DETAILNot to ScaleNot to Scale2SHRUB PLANTING DETAILNot to Scale3CONIFEROUS TREE PLANTING DETAIL
(2) Que-x(2) Que-x(2) Gle-t(1) Que-x(1) Que-x(2) Gle-t(2) Nys-s(5) Hyd-e(1) Que-x2(2) Que-x2(5) Vib-x(1) Cer-c(3) Rho-p(1) Nys-s(2) Que-x2(3) Rho-p(1) Cer-c(2) Nys-s(5) Vib-x(5) Hyd-e(1) Que-x2CHR,61323R,V$7(R(67R2201353R,V$7(R(67R220133'R(:13G$7H(R,NG131C2RR,'2R120Scale 1" = 20'-0"40'20'10'North'R$:,NG 7,7/(C(R7,),(' %<'R$:,NG N80%(R3R2-(C7 N80%(RR(V,6,2N66C23( 'R$:,NG6 7hese drDZiQJs iQdicDte the JeQerDl scope oI the proMectiQ terPs oI DrchitecturDl desiJQ coQcept the diPeQsioQs oIthe buildiQJ the PDMor DrchitecturDl elePeQts DQd the typeoI structurDl PechDQicDl DQd electricDl systePs 7he drDZiQJs do Qot QecessDrily iQdicDte or describe DllZorN reTuired Ior Iull perIorPDQce DQd coPpletioQ oI thereTuirePeQts oI the CoQtrDct 2Q the bDsis oI the JeQerDl scope iQdicDted or describedthe trDde coQtrDctors shDll IurQish Dll itePs reTuired Ior theproper executioQ DQd coPpletioQ oI the ZorN,668( '$7('R$:N %<CH(C.(' %<1220$-63R2-(C7
C$R0(/ 0,'72:N21-1C$R0(/ ,NN27 )2RC2N67R8C7,2N/312R',N$NC(C203/,$NC(3/$N7,NG3/$NMATCHLINE - REFER TO SHEET L302MATCHLINE - REFER TO SHEET L3021.Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer to PlantSchedule and Planting Details for additional information.2.All materials are subject to the approval of the Landscape Architect and Owner at any time.Landscape Architect to inspect all plant locations and plant bed conditions prior to installation.On-site adjustments may be required.3.Rootballs shall meet or exceed size standards as set forth in 'American Standards for NurseryStock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT.4.Remove from the site any plant material that turns brown or defoliates within five (5) days afterplanting. Replace immediately with approved, specified material.5.Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall makeown plant quantity takeoffs using drawings, specifications, and plant schedule requirements (i.e.,spacing), unless otherwise directed by Landscape Architect. Contractor to verify bedmeasurements and install appropriate quantities as governed by plant spacing per schedule. Plantmaterial quantities shown on plan are minimum quantities. Additional material may be needed tomeet spacing requirements and field conditions.6.Seed all areas disturbed by construction activities that are not otherwise noted to receivepavement, planting bed, or sod treatment.7.The Contractor shall install and/or amend topsoil in all proposed bed areas to meet Specifications.Contractor shall coordinate quantity and placement of topsoil. Landscaper shall verify depth oftopsoil prior to plant installation. (Refer to specifications for topsoil source and placementrequirements)8.All tree locations shall be marked with 2x2" stakes prior to planting for review and approval by theLandscape Architect. Any plant material installed in an incorrect location, by the judgment of theLandscape Architect, shall be reinstalled at the Contractor's expense.9.All plant beds shall receive 3" minimum of shredded hardwood bark mulch (unless otherwisenoted).10.Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to Owner'ssatisfaction at no additional cost.11.The Contractor shall maintain all plant material and lawns until the project is fully accepted by theLandscape Architect, unless otherwise noted.12.All workmanship and materials shall be guaranteed by the Contractor for a period of one calendaryear after Final Acceptance.13.Install all plant material in accordance with all local codes and ordinances. Coordinate with theOwner to obtain any required permits necessary to complete work.14.Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than 24 hoursshall be installed using tree pit drainage.15.Tree Protection Fencing is the responsibility of the Contractor. Minimum protected area shallinclude the full drip line of the canopy. NO construction activities, material storage, etc. may occurwithin that area. The Contractor shall ensure that no soil compaction or tree damage occurs in anyProtected areas, at any time during the construction process.16.Trees shall be matched in groups unless otherwise noted.GENERAL LANDSCAPEAND PLANTING NOTESZoned : C2, Surrounding Properties: R15.21 LS-03: C1 and C2 Landscaping StandardsB.Street Trees: Shade trees shall be planted along all streets with the ROW, parallel to the street (Maximum Spacing of 50'-0")Industrial Drive:Required:482.02 lf. = 482.02/50 = 10 Shade TreesProvided:10 Shade TreesC.Bufferyards (C2 District Only)1.Buffferyards shall be required along any side and/or rear lot line abutting a side or rear lotline of detached single family residences and shall extend the entire length of the line.2.Minimum Bufferyard with shall be equal to the building height of the nearest building toeach side or rear lot line, not to exceed 35'3.The minimum planting standard shall be Bufferyard C as set forth in the Bufferyard Tableprescribed in Article 5, Section 5.19(F)(1): Bufferyards.Shade/Evergreen Trees = 6 per 100 lf.Ornamental Trees = 1 per 100 lf.Shrubs = 15 per 100 lf.North Bufferyard:Required:173.58 lf. = 6(173.58)/100 = 10 Shade/Evergreen Trees173.58 lf. = 1(173.58)/100 = 2 Ornamental Trees173.58 lf. = 15(173.58)/100 = 26 ShrubsProvided:10 Shade/Evergreen Trees, 2 Ornamental Trees, 26 ShurbsNo foundation or Parking Perimeter Plantings required for C2LANDSCAPE ORDINANCEREQUIREMENTSINDUSTRIAL DRIVEAreas to be Seeded
(1) Que-x:+:+:+:+:+:+:+)250$/&21)(5(1&(10(&+$1,&$/10$77116725$*(11&255,'2511$1'5($181,6(; 72,/(71$'$011)8785( &)217</(511%5,$11(/,=$%(7+1&+5,6135,9$7(5(675220135,9$7(5(6752201'5(:167$,5162&,$/ +8%1.(1'5$11:$,7,1*19(67,%8/(1&23< 35,171&255,'251&255,'2511$/&29(13+21( 52201*$7+(5,1*11&255,'25181,6(; 72,/(711&255,'2516(%$67,$11(/(91'5$:,1* 7,7/(&(57,),(' %<'5$:,1* 180%(5352-(&7 180%(55(9,6,2166&23( '5$:,1*6 7KeVe GUDZLQJV LQGLFDWe WKe JeQeUDO VFRSe RI WKe SURMeFWLQ WeUPV RI DUFKLWeFWuUDO GeVLJQ FRQFeSW WKe GLPeQVLRQV RIWKe EuLOGLQJ WKe PDMRU DUFKLWeFWuUDO eOePeQWV DQG WKe W\SeRI VWUuFWuUDO PeFKDQLFDO DQG eOeFWULFDO V\VWePV 7Ke GUDZLQJV GR QRW QeFeVVDULO\ LQGLFDWe RU GeVFULEe DOOZRUN UeTuLUeG IRU IuOO SeUIRUPDQFe DQG FRPSOeWLRQ RI WKeUeTuLUePeQWV RI WKe &RQWUDFW 2Q WKe EDVLV RI WKe JeQeUDO VFRSe LQGLFDWeG RU GeVFULEeGWKe WUDGe FRQWUDFWRUV VKDOO IuUQLVK DOO LWePV UeTuLUeG IRU WKeSURSeU exeFuWLRQ DQG FRPSOeWLRQ RI WKe ZRUN,668( '$7('5$:1 %<&+(&.(' %<10$-6352-(&7
&$50(/ 0,'72:11-1&$50(/ ,1127 )25&216758&7,21/25',1$1&(&203/,$1&(3/$17,1*3/$1MATCHLINE - REFER TO SHEET L301 MATCHLINE - REFER TO SHEET L301
1.Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer to PlantSchedule and Planting Details for additional information.2.All materials are subject to the approval of the Landscape Architect and Owner at any time.Landscape Architect to inspect all plant locations and plant bed conditions prior to installation.On-site adjustments may be required.3.Rootballs shall meet or exceed size standards as set forth in 'American Standards for NurseryStock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT.4.Remove from the site any plant material that turns brown or defoliates within five (5) days afterplanting. Replace immediately with approved, specified material.5.Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall makeown plant quantity takeoffs using drawings, specifications, and plant schedule requirements (i.e.,spacing), unless otherwise directed by Landscape Architect. Contractor to verify bedmeasurements and install appropriate quantities as governed by plant spacing per schedule. Plantmaterial quantities shown on plan are minimum quantities. Additional material may be needed tomeet spacing requirements and field conditions.6.Seed all areas disturbed by construction activities that are not otherwise noted to receivepavement, planting bed, or sod treatment.7.The Contractor shall install and/or amend topsoil in all proposed bed areas to meet Specifications.Contractor shall coordinate quantity and placement of topsoil. Landscaper shall verify depth oftopsoil prior to plant installation. (Refer to specifications for topsoil source and placementrequirements)8.All tree locations shall be marked with 2x2" stakes prior to planting for review and approval by theLandscape Architect. Any plant material installed in an incorrect location, by the judgment of theLandscape Architect, shall be reinstalled at the Contractor's expense.9.All plant beds shall receive 3" minimum of shredded hardwood bark mulch (unless otherwisenoted).10.Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to Owner'ssatisfaction at no additional cost.11.The Contractor shall maintain all plant material and lawns until the project is fully accepted by theLandscape Architect, unless otherwise noted.12.All workmanship and materials shall be guaranteed by the Contractor for a period of one calendaryear after Final Acceptance.13.Install all plant material in accordance with all local codes and ordinances. Coordinate with theOwner to obtain any required permits necessary to complete work.14.Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than 24 hoursshall be installed using tree pit drainage.15.Tree Protection Fencing is the responsibility of the Contractor. Minimum protected area shallinclude the full drip line of the canopy. NO construction activities, material storage, etc. may occurwithin that area. The Contractor shall ensure that no soil compaction or tree damage occurs in anyProtected areas, at any time during the construction process.16.Trees shall be matched in groups unless otherwise noted.GENERAL LANDSCAPEAND PLANTING NOTESZoned : C2, Surrounding Properties: R15.21 LS-03: C1 and C2 Landscaping StandardsB.Street Trees: Shade trees shall be planted along all streets with the ROW, parallel to the street (Maximum Spacing of 50'-0")Industrial Drive:Required:482.02 lf. = 482.02/50 = 10 Shade TreesProvided:10 Shade TreesC.Bufferyards (C2 District Only)1.Buffferyards shall be required along any side and/or rear lot line abutting a side or rear lotline of detached single family residences and shall extend the entire length of the line.2.Minimum Bufferyard with shall be equal to the building height of the nearest building toeach side or rear lot line, not to exceed 35'3.The minimum planting standard shall be Bufferyard C as set forth in the Bufferyard Tableprescribed in Article 5, Section 5.19(F)(1): Bufferyards.Shade/Evergreen Trees = 6 per 100 lf.Ornamental Trees = 1 per 100 lf.Shrubs = 15 per 100 lf.North Bufferyard:Required:173.58 lf. = 6(173.58)/100 = 10 Shade/Evergreen Trees173.58 lf. = 1(173.58)/100 = 2 Ornamental Trees173.58 lf. = 15(173.58)/100 = 26 ShrubsProvided:10 Shade/Evergreen Trees, 2 Ornamental Trees, 26 ShurbsNo foundation or Parking Perimeter Plantings required for C2LANDSCAPE ORDINANCEREQUIREMENTS0Scale 1" = 20'-0"40'20'10'NorthINDUSTRIAL DRIVETHIRD STREETAreas to be Seeded
TREESQTYBOTANICAL NAMECOMMON NAMECONT CALREMARKSCer-c2Cercis canadensisEastern RedbudB & B8` ht.multi-trunk, matchedGle-t4Gleditsia triacanthos inermis ``Draves`Street Keeper HoneylocustB & B2.5"Calfull, strong central leader, matched (substitution forNorwegian Sunset MapleNys-s5Nyssa sylvaticaSour GumB & B2.5"Calfull, strong central leader, matchedQue-x26Quercus robur `Fastigiata`Columnar English OakB & B2.5"Calspring dug, full, strong central leader, matchedQue-x6Quercus robur `Long`Regal Prince English OakB & B2.5"Calspring dug, full, strong central leader, matchedSHRUBSQTYBOTANICAL NAMECOMMON NAMESIZEHEIGHTREMARKSHyd-e10Hydrangea macrophylla `Endless Summer Twist-n-Shout`Twist-n-Shout Hydrangeacontainer18" ht. min.space @ 3`-6" o.c.Rho-p6Rhododendron x 'P.J.M.'PJM Rhododendroncontainer18" ht. min.space @ 5'-0" o.c.Vib-x10Viburnum x juddiiJudd Viburnumcontainer18" ht. min.space @ 5`-0" o.c.PLANT SCHEDULEDRAWING TITLE:CERTIFIED BY:DRAWING NUMBERPROJECT NUMBERREVISIONS:SCOPE DRAWINGS: These drawings indicate the general scope of the projectin terms of architectural design concept, the dimensions ofthe building, the major architectural elements and the typeof structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe allwork required for full performance and completion of therequirements of the Contract. On the basis of the general scope indicated or described,the trade contractors shall furnish all items required for theproper execution and completion of the work.ISSUE DATEDRAWN BYCHECKED BY06/10/22MAJSPROJECT:
CARMEL MIDTOWN21-1489CARMEL, INNOT FORCONSTRUCTION21-1489L320ORDINANCECOMPLIANCEPLANTINGDETAILSMAJTS03/23/22456PERENNIAL PLANTINGNot to ScaleNote: All perennial beds shall be plantedusing triangular planting scheme. Refer toPlanting Schedule for On-Center plantingdimension.3" Shredded Hardwood Bark MulchRemove Container12" Prepared Soil; Refer to SpecificationsCompacted SubgradeExisting GradeGROUNDCOVER PLANTINGNot to ScaleNote: All groundcover beds shall be plantedusing triangular planting scheme. Refer toPlanting Schedule for On-Center plantingdimension.Refer to Plans for Finish Grade.3" Shredded Hardwood Bark MulchSplit Peat Pot12" Prepared Soil; Refer to SpecificationsCompacted SubgradeSPADE EDGENot to ScaleExisting GradeArea to Receive Hardwood Bark MulchTopsoil (As Specified)5"3"3"1DECIDUOUS TREE PLANTING DETAILNot to ScaleNot to Scale2SHRUB PLANTING DETAILNot to Scale3CONIFEROUS TREE PLANTING DETAIL