HomeMy WebLinkAbout2022-06-20 estimate Bratton John Patricia 1259Tenpenny Houseworks Inc
17109 Cherry Tree Rd.
Noblesville, IN 46062
317-764-9577
tenpennyhouseworks@gmail.com
ADDRESS
John & Patricia Bratton
11535 Ralston Ave
Carmel, IN 46032
Estimate 1259
DATE 06/20/2022
DATE DESCRIPTION QTY RATE AMOUNT
Plans and Permits Plans and Permits 1 500.00 500.00
Notes Priority #1: Main
level living room, sun
room, kitchen,
laundry, front room,
entry
1 0.00 0.00
DATE DESCRIPTION QTY RATE AMOUNT
Demo Demo and Reframe:
Selective demolition
of fixtures, finishes,
walls, flooring etc as
needed. Remove
walls/framing as
needed @laundry to
open up kitchen
Frame up temporary
support wall And
Remove existing wall
between
kitchen/laundry and
fireplace room.
reframe and add
support beam as
needed. Reframe for
new laundry and half
bath area. Reframe
sunroom doorway to
enlarge if possible.
Furnish all lumber
and materials
necessary and
means of disposal or
dumpsters as
needed.
1 10,500.00 10,500.00
Specialty Engineering for
beam sizing in
kitchen
1 500.00 500.00
Electrical and Lighting Electrical and
Lighting Allowance:
amend existing
electrical and lighting
locations per design
info provided.
Furnish all necessary
materials and
supplies.
1 12,000.00 12,000.00
Plumbing Plumbing Allowance:
Amend plumbing to
suit new
design/layouts for
kitchen, laundry, and
half bath. Furnish
new faucets, toilet,
misc. fixtures piping,
valves, materials,
and supplies. Per
customer layout
1 15,750.00 15,750.00
DATE DESCRIPTION QTY RATE AMOUNT
HVAC Heating and Cooling
Allowance: Amend
supply and return
venting and grills as
needed to suit new
layout. Furnish all
materials and
supplies necessary.
Supply and install all
new white supply
and return grills.
1 1,500.00 1,500.00
Drywall Installation Drywall Allowance:
Installation of new
drywall as needed,
tape, mud, and finish
as needed to suit
new layout and
finishes
1 9,500.00 9,500.00
Millwork/Doors Millwork/Doors
Allowance: remove
or amend existing
trim and mouldings
as needed.
Installation of new
doors/trim/mouldings,
and millwork as
needed to suit new
design and layout.
Includes misc
matching casing,
base, doors, and
trim.
1 8,000.00 8,000.00
Cabinets and Vanities New Cabinets
Allowance: based on
new layouts. TBD.
Can include vanities
in 1/2 bath, master
bath, and upstairs
bath
1 20,000.00 20,000.00
Specialty Granite/Stone
Allowance: Quartz
for kitchenette, and
vanity top
1 9,000.00 9,000.00
Paint/Stain Interior Paint/Stain
Allowance: Prep and
paint walls, ceilings,
trim, doors, finishes,
as needed to suit
new design and
layout. Includes all
misc materials and
supplies
1 8,000.00 8,000.00
DATE DESCRIPTION QTY RATE AMOUNT
Floor Coverings Lay in new hardwood
(matching existing
species and size) in
sunroom and areas
designated by
customer. Sand and
refinish.
1 10,500.00 10,500.00
Specialty Misc Flooring
Allowance:
Installation of LVP
flooring in laundry
and half bath and
misc areas, carpet in
stairwell and
upstairs, Includes
misc materials for
installation. Price
does not include tile.
1 5,000.00 5,000.00
Notes Priority #2: Master
Bedroom, Master
Bath, exterior roof
and storage, Front
bedrooms, upstairs
bathroom refresh
1 0.00 0.00
Labor Demo and Reframe:
Selective demolition
of fixtures, finishes,
walls, flooring etc as
needed. Remove
walls/framing as
needed reframe for
master bath.
Remove existing
fireplace and expand
closet area. Furnish
all lumber and
materials necessary
and means of
disposal.
1 6,500.00 6,500.00
DATE DESCRIPTION QTY RATE AMOUNT
Specialty Master bath remodel:
Reconfigure master
bath per customer
layout. Installation of
new wallboard as
needed, relocate
plumbing,electrical,
and HVAC as
needed to suit new
layout. Installation of
new fixtures and
finishes. Installation
of new doors, trim,
and millwork.
Installation of new
ceramic tile in
shower, new flooring,
paint, and finishes.
1 20,000.00 20,000.00
Specialty Upstairs bath
remodel: Refresh
upstairs bath per
customer layout.
Remove existing
fixtures and finishes.
Installation of new
wallboard as needed,
relocate
plumbing,electrical,
and HVAC as
needed to suit new
layout. Installation of
new fixtures and
finishes. Installation
of new 4 piece 60”
shower pan and
surround. Shower
glass, and toilet.
1 6,000.00 6,000.00
DATE DESCRIPTION QTY RATE AMOUNT
Notes Notes:
1. This is an
estimate of work to
be completed. If
hidden conditions or
change orders
require additional
labor or materials,
they will be billed in
addition to this
pricing.
2. "Allowance" is a
dollar figure put
towards the materials
and services of the
customers choosing.
We will assist with
choosing whats right
for the application,
knowing that there
are many price
points and options
for each application.
If customer chooses
materials or services
costing more than
the allowance, they
will be billed for the
additional amount.
3. This price does
not include any
fixtures, finishes,
hardware, faucets,
etc unless
specifically
mentioned above.
4. A 30% deposit will
be required upon
agreement of this
estimate.
1 0.00 0.00
Thank you for your consideration. Please reach out to us with
any questions. Have a great day!
TOTAL $143,250.00
Accepted By Accepted Date