Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Installation Guide for pool
EXCAVATION 1. Be sure to remove any stones or sticks that may potentially damage the vinyl liner. 2. Create a 2' over dig around entire pool. This will give you room to work efficiently and install the buttress bracing with ease. This also serves as your concrete barrier wall as concrete footer will be poured 10" deep and 2' wide. 3. Excavate to a minimum 2' depth. 4. A 2" layer of masonry sand is required as a base for the pool floor. 5. Use the transit level to identify the high and low spots in your excavation and utilize rakes to even out low spots prior to pool assembly. 14 x 26 Oval Dig - 2' Overdig Around Entire Pool 12 x 24 Oval Example: If Pool building a 12 x 24 Oval — Hole will Be a14x26 Oval Pool Wall Interior of Pool TUndisturbed Earth 2' Undisturbed Earth 1" x 6" x 6" Patio Block STEP INSTALLATION WALL LAYOUT Before beginning the step installation, identify where each steel panel goes from the build diagram. The sticker on the edge seam of each panel has the item description to aid in identifying. The image below has a description of Stl Pnl 48" x 52" - Plain. Lay out the steel panels based on the corresponding pool diagram. SA3-480 1 -52 A PN 46 .52 • Plar .3 tlanyo, • + RC I� Copyright © 2021 CoolPools.com, LLC. All rights reserved. 6