Loading...
HomeMy WebLinkAboutE002.0-OneLinePanelScheduleA 11.05.21 REV.DATE DESCRIPTION Drawing Name: O:\2021\2021095\98 - TRT 18712 - Carmel, IN\dwg\2021095.98- Carmel, IN N Illinois - CD90.dwgJune 10, 2022 12:29 PM - jarch DESIGNERINSTALL MANAGEREN-1JOB NO.ISSUED FOR:PERMITRECORDCONSTRUCTIONBID2021095.98ABRWILLCARTER11545 N ILLINOIS ST. (TESLA STATION) - TRT18712 CARMEL, IN 46032 B 11.19.21 ISSUED FOR 90% REVIEW C 04.25.22 ISSUED FOR 90% REVIEW ISSUED FOR SIGN AND SEAL XXXXXXXXXXXX1234CBAGPD GROUP, INC.®520 South Main Street, Suite 2531Akron, OH 44311330.572.2100Fax 330.572.21011 06.10.22 REVISIONS FOR CITY COMMENTS ELECTRICAL GENERAL NOTES GENERAL ELECTRICAL SPECIFICATIONS1.THE FOLLOWING ARE ABBREVIATED SPECIFICATIONS. ALL ITEMS NECESSARY FOR ACOMPLETE AND OPERABLE JOB (TO THE SATISFACTION OF OWNER) WHETHER SHOWN ORIMPLIED SHALL BE HELD AS THE RESPONSIBILITY OF THE CONTRACTOR2.IMPORTANT NOTE: "CONTRACTOR" REFERENCED IN THESE SPECIFICATIONS SHALL INDICATEWORK BY ELECTRICAL CONTRACTOR OR ANY OF HIS SUBCONTRACTORS UNLESS NOTEDOTHERWISE.3.DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT ONLY.COORDINATE INSTALLATION WITH OTHER TRADES TO VERIFY THE ACTUAL SPACECONDITIONS THAT ARE TO BE MAINTAINED. NO ADDITIONAL PAYMENT WILL BE APPROVEDFOR FAILURE TO COMPLY.4.ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSIDEREDCONSTRUCTION STANDARDS. IF THE CONTRACTOR HAS QUESTIONS REGARDING THEIREXACT MEANING, THE ENGINEER SHALL BE NOTIFIED FOR CLARIFICATION BEFOREPROCEEDING WITH THE WORK.5.CONTRACTOR SHALL NOTE SCALE ELECTRICAL DRAWINGS. REFER TO SITE PLANS ANDELEVATIONS FOR EXACT LOCATIONS OF ALL EQUIPMENT AND CONFIRM WITHCONSTRUCTION MANAGER ANY SIZES AND LOCATIONS WHEN NEEDED.6.CONTRACTOR'S SCOPE OF WORK SHALL INCLUDE ALL ITEMS DEFINED IN THE CONTRACTDOCUMENTS. THE CONTRACT DOCUMENTS INCLUDE, BUT ARE NOT LIMITED TO THEFOLLOWING: THE CONTRACT, SPECIFICATIONS, AND CONSTRUCTION DRAWINGS.CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT NECESSARY TOINSTALL ALL ELECTRICAL EQUIPMENT, CONDUIT, WIRING ETC. AS SHOWN OR IMPLIED ON THEDRAWINGS AND TO PROVIDE A COMPLETE OPERATIVE SYSTEM TO THE SATISFACTION OFOWNER.7.CONTRACTOR SHALL PROVIDE ON-SITE SUPERVISION AT ALL TIMES WHILE THE WORK ISBEING PERFORMED AND SHALL DIRECT ALL WORK, USING HIS BEST SKILL AND ATTENTION.HE SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS,TECHNIQUES, PROCEDURES AND SEQUENCES FOR COORDINATING ALL PORTIONS OF THEWORK UNDER THE CONTRACT.8.INSTALLATION OF ALL ELECTRICAL EQUIPMENT, DEVICES, CONDUITS, ETC. MUST BECOORDINATED WITH ALL OTHER TRADES. COORDINATE SHUTDOWN TIMES AND WORKINGHOURS WITH BUILDING OWNER, INCLUDING OFF HOURS, WEEKEND, AND HOLIDAY WORK ASREQUIRED.9.ANY DISCREPANCIES FOUND WITHIN THE CONTRACT DOCUMENTS SHALL BE REPORTED TOTHE OWNER IN WRITING PRIOR TO THE AWARD OF THE CONTRACT AND AN ADDENDUM WILLBE ISSUED TO COVER SAME.10.GUARANTEE - CONTRACTOR SHALL FURNISH OWNER WITH A WRITTEN GUARANTEE TOPROMPTLY REMEDY ALL DEFECTS OF WORK OR MATERIALS WITHOUT CHARGE FOR APERIOD OF ONE YEAR AFTER FINAL ACCEPTANCE AND INSPECTION.11.MATERIALS - ALL MATERIALS AND EQUIPMENT SHALL BE NEW, IN ORIGINALCONTAINERS/WRAPPINGS, SHALL BE SPECIFICATION GRADE, AND LABELED OR LISTED BYU.L. OR AN ACCREDITED TESTING ORGANIZATION AS REQUIRED BY LOCAL INSPECTORS.12.CONTRACTOR SHALL PROVIDE ADEQUATE AND REQUIRED LIABILITY INSURANCE FORPROTECTION AGAINST PUBLIC LOSS AND ANY/ALL PROPERTY DAMAGE FOR THE DURATIONOF WORK13.ALL EQUIPMENT SHALL BE DESIGNED TO OPERATE ON VOLTAGE AND PHASE SPECIFIED.CONTRACTOR FURNISHING EQUIPMENT OTHER THAN INDICATED SHALL BE RESPONSIBLEFOR ANY CHANGES IN CONDUCTORS, RACEWAYS, SWITCHES, MAIN FEEDERS, ANDAPPURTENANCES AND PAY ALL ASSOCIATED COSTS. REQUIREMENTS FOR ANY INCREASE INCAPACITIES SHALL BE REVIEWED BY ENGINEER.14.CONTRACTOR SHALL CONFIRM WITH LOCAL UTILITY COMPANY ANY/ALL REQUIREMENTSSUCH AS THE: LUG SIZE RESTRICTIONS, CONDUIT ENTRY, SIZE OF TRANSFORMERS,SCHEDULED DOWNTIME FOR THE OWNERS' CONFIRMATION, ETC. ANY/ALL CONFLICTS SHALLBE BROUGHT TO THE ATTENTION OF THE CONSTRUCTION MANAGER, PRIOR TO BEGINNINGANY WORK.LICENSES, CERTIFICATIONS OF INSPECTION1.CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFICATION OF ALL GOVERNING AGENCIESTHAT REQUIRE SITE INSPECTION OF THE WORK AND/OR SIMPLY NOTIFICATION. THECONTRACTOR SHALL OBTAIN AND PAY FOR PERMITS, LICENSES AND INSPECTIONSNECESSARY FOR PERFORMANCE OF THE WORK.2.CONTRACTOR AND ALL OF HIS SUBCONTRACTORS THAT PERFORM ANY WORK ON THISPROJECT SHALL BE CURRENTLY LICENSED BY ALL AGENCIES WHICH GOVERN OVER THELAND(S) ON WHICH CONSTRUCTION IS TO TAKE PLACE. CONTRACTOR SHALL SECURE ALLPERMITS AND INSPECTIONS AS REQUIRED, ALL COSTS SHALL BE BORNE BY CONTRACTOR.3.THE CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS, LICENSES AND INSPECTIONSINCIDENTAL TO WORK UNDER THIS CONTRACT. WHEN THE WORK IS COMPLETED, THEREQUIRED CERTIFICATES OF APPROVAL SHALL BE FURNISHED TO THE BUILDING OWNER.CONTRACTOR MUST BE LICENSED IN THE STATE, COUNTY AND CITY OF THE PROJECT SITE.CODES AND ORDINANCES1.ALL WORK SHALL BE DONE IN STRICT ACCORDANCE WITH LATEST EDITION OF NEC AND ALLAPPLICABLE CODES AND ORDINANCES, INCLUDING SUCH AS PERTAIN TO THE SAFETY ANDHEALTH RELATIONS. CODES AND ORDINANCES SHALL TAKE PRECEDENCE OVER THEDRAWINGS AND SPECIFICATIONS ONLY IN CASE OF CONFLICT AND SHALL INCLUDE BUT NOTBE LIMITED TO:A.UL - UNDERWRITERS LABORATORIESB.NEC - NATIONAL ELECTRICAL CODEC.NEMA - NATIONAL ELECTRICAL MANUFACTURERS ASSOC.D.OSHA - OCCUPATIONAL SAFETY AND HEALTH ACTE.SBC - STANDARD BUILDING CODEF.NFPA - NATIONAL FIRE CODESPOST CONSTRUCTION AND PROJECT CLOSEOUT DOCUMENTATION1.AS-BUILT REQUIREMENTS: DO NOT USE RECORD DOCUMENTS FOR CONSTRUCTIONPURPOSES. TO PROTECT RECORD DOCUMENTS FROM DETERIORATION AND LOSS, STORE INA SECURE, FIRE-RESISTANT LOCATION. PROVIDE ACCESS TO RECORD DOCUMENTS FOR THEOWNER'S REFERENCE DURING NORMAL WORKING HOURS. MAINTAIN A CLEAN, UNDAMAGEDSET OF BLUE OR BLACK LINE PRINTS OF CONTRACT DRAWINGS AND SHOP DRAWINGS. MARKTHE SET TO SHOW THE ACTUAL INSTALLATION WHERE THE INSTALLATION VARIESSUBSTANTIALLY FROM THE WORK AS ORIGINALLY SHOWN. MARK DRAWINGS THAT AREMOST CAPABLE OF SHOWING CONDITIONS FULLY AND ACCURATELY. WHERE SHOPDRAWINGS ARE USED, RECORD A CROSS-REFERENCE AT THE CORRESPONDING LOCATIONON THE CONTRACT DRAWINGS. GIVE PARTICULAR ATTENTION TO CONCEALED ELEMENTSTHAT WOULD BE DIFFICULT TO MEASURE AND RECORD AT A LATER DATE. MARK RECORDSETS WITH RED ERASABLE PENCIL. USE OTHER COLORS TO DISTINGUISH BETWEENVARIATIONS IN SEPARATE CATEGORIES OF THE WORK. MARK NEW INFORMATION THAT ISIMPORTANT TO THE OWNER BUT WAS NOT SHOWN ON THE CONTRACT DRAWINGS, DETAILSOR SHOP DRAWINGS. NOTE RELATED CHANGE ORDER NUMBERS WHERE APPLICABLE. NOTERELATED RECORD DRAWING INFORMATION AND PRODUCT DATA. UPON COMPLETION OFTHE WORK, SUBMIT ONE (1) COMPLETE SET OF RECORD DOCUMENTS TO THECONSTRUCTION MANAGER FOR THE OWNER'S RECORDS. CONTRACTOR SHALL SUBMITAS-BUILT SET OF PLANS TO THE ENGINEER WITHIN 7 DAYS OF COMPLETION OFCONSTRUCTION.EXISTING CONDITIONS AND DEMOLITION1.ALL ELECTRICAL DEMOLITION WORK, INCLUDING MATERIAL REMOVAL FROM THE SITE, SHALLBE THE RESPONSIBILITY OF THIS CONTRACTOR. BEFORE PROCEEDING WITH THEDEMOLITION WORK, THE CONTRACTOR SHALL OBTAIN FROM THE BUILDING OWNER A LIST OFANY REMOVED ITEMS TO BE SALVAGED. ALL OTHER REMOVED MATERIALS AND EQUIPMENTSHALL BE PROPERLY DISCARDED OFF THE PREMISES.2.CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING PROPERTYRESULTING FROM THE CONSTRUCTION ACTIVITIES. CONTRACTOR SHALL REMOVE ALLDEBRIS FROM THE SITE AT THE COMPLETION OF WORK.3.EXISTING UTILITIES AND CONDITIONS ARE SHOWN FROM FIELD DATA AND EXISTINGDOCUMENTS AND ARE NOT NECESSARILY COMPLETE OR ACCURATE. ALL FIELD CONDITIONSSHALL BE VERIFIED BY CONTRACTOR BEFORE START OF CONSTRUCTION.4.CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE, EXPOSE, AND DETERMINE IF CONFLICTSEXIST WITH THE PROPOSED IMPROVEMENTS. CONTRACTOR SHALL NOTIFY THE OWNER INORDER TO RESOLVE ANY CONFLICTS. EXISTING ELECTRICAL CONDUIT, WIRING, ETC.DAMAGED DURING RENOVATION SHALL BE REPLACED IN LIKE KIND AND CHARACTER, AND ATTHE EXISTING UTILITY LINES, DRAIN OR FIELD TILE DAMAGED SHALL BE REPAIRED ORREPLACED, AS NEEDED, IN LIKE KIND AND CHARACTER. IT SHALL BE THE RESPONSIBILITY OFTHE CONTRACTOR TO LOCATE ALL EXISTING CONDUITS, CONTROL WIRING, ETC., WHETHERSHOWN HEREON OR NOT, AND TO PROTECT THEM FROM DAMAGE. THE CONTRACTOR SHALLBEAR ALL EXPENSES FOR REPAIR OR REPLACEMENT OF PROPERTY DAMAGED INCONJUNCTION WITH THE EXECUTION OF WORK.5.THE CONTRACTOR SHALL NOTIFY THE OWNER OF ANY CONFLICTS OR DISCREPANCIES INTHE CONTRACT DOCUMENTS OR FIELD CONDITIONS PRIOR TO EXECUTING THE WORK INQUESTION. THE CONTRACTOR SHALL NOTIFY THE CONSTRUCTION MANAGER IF DETAILSARE CONSIDERED UNSOUND, UNSAFE, NOT WATERPROOF, OR NOT WITHIN CUSTOMARYTRADE PRACTICE. IF WORK IS PERFORMED, IT WILL BE ASSUMED THAT THERE IS NOOBJECTION TO THE DETAIL. DETAILS ARE INTENDED TO SHOW THE END RESULT OF THEDESIGN. MINOR MODIFICATIONS MAY BE REQUIRED TO SUIT JOB CONDITIONS, AND SHALL BEINCLUDED AS PART OF THE WORK.6.SITE VISIT - CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE HIMSELF WITH ALLCONDITIONS AFFECTING HIS WORK. NO EXTRAS WILL BE PERMITTED FOR LACK OFKNOWLEDGE OF EXISTING CONDITIONS. QUANTITIES OF MATERIALS SHALL BE PERCONTRACTOR'S MEASUREMENTS.BASIC ELECTRICAL MATERIALS AND METHODS1.WHERE STRUCTURAL OPENINGS ARE NOT AVAILABLE, THE CONTRACTOR SHALL CORE DRILLOR CUT CHASES IN WALLS AND FLOORS AS REQUIRED. ALL NEW OPENINGS SHALL BECOORDINATED WITH THE ENGINEER. ALL PENETRATIONS OF THE BUILDING WALLS, CEILINGAND FLOORS, THE CONTRACTOR SHALL SEAL WITH QUALITY CAULK, FIRE RATED ANDWATERTIGHT, SUBMITTED FOR APPROVAL BY THE OWNER.2.TRASH REMOVAL: CONTRACTOR SHALL REMOVE ALL TRASH CREATED BY HIMSELF OR HISSUBCONTRACTORS DUE TO DEMOLITION OR CONSTRUCTION. THE CONTRACTOR SHALLALSO REMOVE TRASH CREATED BY OTHER SUBCONTRACTORS INCLUDING CABLE REELS,CARDBOARD BOXES AND PACKING. PROMPTLY CLEAN-UP ALL SOILING, DEBRIS AND OTHERUNSIGHTLY OR HAZARDOUS CONDITIONS, CAUSED BY WORK OR DELIVERIES UNDER THISCONTRACT, FROM THE BUILDING GROUNDS, ENTRIES, CORRIDORS, STAIRWAYS, ELEVATORSOR OTHER PUBLIC AREAS. ALL SHALL BE REMOVED FROM THE SITE IN A TIMELY FASHION TOA LEGAL DISPOSAL FACILITY.3.SIGNAGE: CONTRACTOR SHALL MAINTAIN SECURITY AROUND PERIMETER OFCONSTRUCTION SITE DURING ALL HOURS BY INSTALLING A TEMPORARY RIBBON FORINTERIOR WORK TO IDENTIFY CONSTRUCTION AREAS AS REQUIRED. SIGNAGE SHALL BEPOSTED WITH NOTIFICATIONS OF "NO TRESPASSING" AND "CONSTRUCTION AREA".4.CHECK ACCURACY OF ALL DIMENSIONS IN THE FIELD. UNLESS SPECIFICALLY NOTED, DONOT FABRICATE ANY MATERIALS OFF SITE, NOR DO ANY CONSTRUCTION UNTIL THEACCURACY OF DRAWING DIMENSIONS HAVE BEEN VERIFIED AGAINST ACTUAL FIELDDIMENSIONS.5.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL NECESSARY CUTTING, SUBSEQUENTPATCHING, AND REQUIRED FLASHING FOR ALL ITEMS NECESSARY FOR ELECTRICAL PART OFTHE CONTRACT. PATCH, PAINT, AND REPAIR ANY AREA DAMAGED TO THE SATISFACTION OFTHE BUILDING OWNER.6.THE EXACT LOCATIONS OF ALL ELECTRICAL DEVICES, EQUIPMENT AND CONDUIT, AS SHOWNON THE DRAWING, IS APPROXIMATE. WHEN NOT SHOWN IN DETAIL, THE EXACT LOCATION ORROUTING SHALL BE DETERMINED BY THE CONTRACTOR, SUBJECT TO THE APPROVAL OFOWNER.7.THE CONTRACTOR SHALL PROVIDE ALL NECESSARY BLOCKING, BACKING, FRAMING,HANGERS OR OTHER SUPPORT FOR THE MOUNTING AND SUPPORT OF ALL ITEMS REQUIRINGTHE SAME AS REQUIRED BY N.E.C.8.TRENCHING AND BACK FILL: CONTRACTOR SHALL PROVIDE FOR ALL UNDERGROUNDINSTALLED CONDUIT AND/OR CABLES INCLUDING EXCAVATION AND BACKFILLING ANDCOMPACTION.9.WHEN DIRECTIONAL BORING IS REQUIRED, CONTRACTOR SHALL INSTALL A LOOSE TONINGWIRE WITHIN INSTALLED CONDUIT TO ALLOW FOR IDENTIFICATION OF UNDERGROUNDCONDUITS.10.ALL BOLTS SHALL BE STAINLESS STEEL.11.FOR UNDERGROUND RACEWAYS, PROVIDE ADDITIONAL SLACK IN CONDUCTORS ANDCONDUIT EXPANSION JOINTS IN ORDER TO ALLOW FOR EARTH MOVEMENT FROMSETTLEMENT, FROST, ETC. IN ORDER TO PREVENT DAMAGE TO THE CONDUCTORS OR TOTHE EQUIPMENT CONNECTED TO THE RACEWAYS PER THE NEC.ELECTRICAL EQUIPMENT1.ALL EQUIPMENT SHALL BE DESIGNED TO OPERATE ON VOLTAGE AND PHASE SPECIFIED.CONTRACTOR FURNISHING EQUIPMENT OTHER THAN INDICATED SHALL BE RESPONSIBLEFOR ANY CHANGES IN CONDUCTORS, RACEWAYS, SWITCHES, MAIN FEEDERS, ANDAPPURTENANCES AND PAY ALL ASSOCIATED COSTS. REQUIREMENTS FOR ANY INCREASE INCAPACITIES SHALL BE REVIEWED BY ENGINEER.2.ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, LISTED, OR CERTIFIED BY A NATIONALLYRECOGNIZED TESTING LABORATORY ACCREDITED BY THE UNITED STATES OCCUPATIONALSAFETY HEALTH ADMINISTRATION.FIRESTOPPING AND SEALING ELECTRICAL PENETRATIONS1.CONTRACTOR SHALL FURNISH AND INSTALL FIRESTOPPING FOR SEALING AROUNDELECTRICAL PENETRATIONS THROUGH FIRE OR SMOKE BARRIERS, AND FLOORS.2.PROVIDE SHOP DRAWINGS OF EACH CONDITION REQUIRING PENETRATION SEALS AND THEPROPOSED UL SYSTEMS MATERIALS, ANCHORAGE, METHODS OF INSTALLATION, ANDACTUAL ADJACENT CONSTRUCTION. SUBMITTAL PACKAGE SHALL ALSO INCLUDE A COPY OFTHE UL ILLUSTRATION OF EACH PROPOSED SYSTEM INDICATING MANUFACTURER APPROVEDMODIFICATIONS (IF APPLICABLE) AND THE MANUFACTURER'S SPECIFICATIONS,RECOMMENDATIONS, INSTALLATION INSTRUCTIONS, AND MAINTENANCE INSTRUCTIONS.3.FIRESTOPPING MATERIALS SHALL BE INTUMESCENT SAFETY BARRIERS DESIGNED TO BLOCKTHE SPREAD OF FIRE AND SMOKE THROUGH PENETRATIONS CREATED BY ELECTRICALINSTALLATIONS IN FIRE RATED WALLS AND FLOORS. MATERIALS SHALL BE FLAME, TOXICFUME, AND WATER RESISTANT AND SHALL HAVE A MINIMUM 3 HOUR FIRE RATING. FIRERATING SHALL BE DEFINED BY TESTS CONDUCTED BY ASTM, UL OR OTHER TESTING ANDINSPECTION AGENCIES ACCEPTABLE TO AUTHORITIES HAVING JURISDICTION.4.PROVIDE MATERIALS BY THE FOLLOWING MANUFACTURERS TO SUIT THE APPLICATION:SPECIFIED TECHNOLOGIES, INC (STI), SOMERVILLE, NJ; TREMCO, INC., BEACHWOOD, OH; OR3M INC., MINNEAPOLIS, MNFAULT CURRENT, COORDINATION STUDY, AND ARC FLASH1.CONTRACTOR SHALL CONDUCT A FAULT CURRENT CALCULATION ON ALL EQUIPMENT ANDMARK AS REQUIRED PER THE N.E.C.2.CONTRACTOR SHALL PROVIDE AN ARC-FLASH STUDY AND LABEL ALL EQUIPMENT ASREQUIRED PER THE N.E.C.GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS1.ALL RACEWAYS AND EQUIPMENT SHALL BE GROUNDED IN ACCORDANCE WITH THE N.E.C.AND ANY LOCAL CODES.2.ALL CONDUITS SHALL CONTAIN A CODE SIZE GROUNDING CONDUCTOR.3.EQUIPMENT GROUNDING CONDUCTORS SHALL BE INSULATED WITH GREEN-COLOREDINSULATION.4.GROUNDING ELECTRODE CONDUCTORS SHALL BE STRANDED CABLE.5.MATERIALS AND CONNECTION COMPONENTS FOR GROUNDING AND BONDING SHALL BEMANUFACTURED BY ERICO, THOMAS & BETTS, OR BURNDY.6.GROUND-FAULT PROTECTION OF EQUIPMENT SHALL BE PROVIDED FOR SERVICEDISCONNECTS RATED 1000A OR MORE. THE GROUND-FAULT PROTECTION SYSTEM SHALL BEPERFORMANCE TESTED WHEN FIRST INSTALLED ON SITE. THE TEST SHALL BE CONDUCTEDIN ACCORDANCE WITH INSTRUCTIONS THAT SHALL BE PROVIDED WITH THE EQUIPMENT. AWRITTEN RECORD OF THIS TEST SHALL BE MADE AND SHALL BE AVAILABLE TO THEAUTHORITY HAVING JURISDICTION.7.ALL HARDWARE SHALL BE STAINLESS STEEL 3/8" DIAMETER OR LARGER. ALL HARDWARE 18-8STAINLESS STEEL INCLUDING LOCK WASHERS, COAT ALL SURFACES WITH AN ANTI-OXIDANTCOMPOUND BEFORE MATING.8.FOR GROUND BOND TO STEEL ONLY: INSERT A CADMIUM FLAT WASHER BETWEEN LUG ANDSTEEL, COAT ALL SURFACES WITH AN ANTI-OXIDANT COMPOUND BEFORE MATING.9.NUT & WASHER SHALL BE PLACED ON THE FRONT SIDE OF THE GROUND BAR AND BOLTEDON THE BACK SIDE. INSTALL BLACK HEAT-SHRINKING TUBE, ON ALL GROUND TERMINATIONS.THE INTENT IS TO WEATHERPROOF THE COMPRESSION CONNECTION.10.ENSURE THE WIRE INSULATION TERMINATION IS WITHIN 1/8" OF THE BARREL (NO SHINERS).11.ALL GROUNDING HARDWARE SUPPLIED AND INSTALLED BY CONTRACTOR.ELECTRICAL IDENTIFICATION1.PROVIDE NAMEPLATES FOR ALL MAJOR ELECTRICAL EQUIPMENT AND ON EQUIPMENT ASDIRECTED BY OWNER.2.PROVIDE ALL FEEDERS AND BRANCH CIRCUIT WIRING WITH COLOR CODED VINYL TAPEWRAPPED A MINIMUM OF 1.5 TIMES AROUND CIRCUMFERENCE OF JACKET/SHIELDING TODESIGNATE PHASE.3.COLOR CODING OF CONDUCTORS SHALL BE PER NEC REQUIREMENTS.4.CONTRACTOR SHALL PLACE TWO LENGTHS OF WARNING TAPE AT A DEPTH OF 12" BELOWGROUND AND DIRECTLY ABOVE ELECTRICAL SERVICE CONDUITS. CAUTIONS TAPE TO READ"CAUTION BURIED ELECTRIC"CONDUCTORS AND CABLES1.WIRING - ALL CONDUCTORS SHALL BE EQUAL TO OR BETTER THAN MINIMUM #12 AWG FORPOWER, #14 AWG FOR CONTROL WITH 98% CONDUCTIVITY STRANDED COPPER, 600V, COLORCODED, UNLESS NOTED ALUMINUM (AL). REFER TO "ALUMINUM CONDUCTORREQUIREMENTS" THIS SHEET. PROVIDE 75°C RATED CONDUCTORS FOR AMPACITIES ABOVE100A AND 60°C RATED CONDUCTORS FOR AMPACITIES OF 100 AMPS OR LESS. PROVIDESOLID OR STRANDED FOR #10 AWG AND SMALLER, STRANDED FOR #8 AWG AND LARGER.UNLESS NOTED OTHERWISE ON DRAWINGS.2.WIRE SIZE OF BRANCH CIRCUITS SHALL BE ADJUSTED TO COMPENSATE FOR VOLTAGE DROPBASED UPON ACTUAL CONDUIT ROUTING. CONTRACTOR SHALL MAINTAIN VOLTAGE DROPAS RECOMMENDED BY N.E.C. (NOT TO EXCEED 3%).3.PROVIDE A SEPARATE NEUTRAL FOR EACH BRANCH CIRCUIT, FEEDER, ETC. NEUTRALS ARENOT PERMITTED TO BE SHARED.4.CONNECTORS FOR POWER CONDUCTORS: CONTRACTOR SHALL USE PRESSURE TYPEINSULATED TWIST-ON CONNECTORS FOR NO. 10 AWG AND SMALLER. USE SOLDERLESSMECHANICAL TERMINAL LUGS FOR NO. 8 AWG AND LARGER.5.ALL CONNECTIONS SHALL BE MADE WITH A PROTECTIVE COATING OF AN ANTI-OXIDECOMPOUND SUCH AS "NO-OXIDE A" BY DEARBORNE CHEMICAL CO. COAT ALL WIRESURFACES BEFORE CONNECTING. EXPOSED COPPER SURFACES, INCLUDING GROUND BARS,SHALL BE TREATED - NO SUBSTITUTIONS.6.CABLES - MC CABLE IS NOT PERMITTED.7.PROVIDE WIRE AND CABLE MANUFACTURED BY ONE OF THE FOLLOWING: AMERICANINSULATED WIRE CORPORATION; NEXANS; CERROWIRE; SOUTHWIRE; OR ENCORE WIRE.8.PROVIDE CONNECTORS MANUFACTURED BY ONE OF THE FOLLOWING: AMP INCORPORATED;GENERAL SIGNAL, O-Z/GEDNEY UNIT; SQUARE D COMPANY, ANDERSON; ILSCO; OR BURNDY.ALUMINUM CONDUCTOR REQUIREMENTS1.ALUMINUM CONDUCTOR GRADE SHALL BE MINIMUM AA-8000 OR THE NEWEST ALUMINUMCONDUCTOR SPECIFICATION BEING USED BY THE INDUSTRY.2.THE CONTRACTOR SHALL ABIDE BY ALL ARTICLES RELATED TO ALUMINUM CONDUCTORS INTHE LATEST ISSUE OF THE NEC.3.ALUMINUM CONDUCTORS SHALL ONLY BE TERMINATED USING ALUMINUM RATEDCONNECTIONS. CONTRACTOR SHALL VERIFY TERMINATIONS ON EACH DEVICE OREQUIPMENT BEFORE START OF WORK FOR RATED ALUMINUM CONNECTORS.4.ALL ALUMINUM (Al) CONDUCTORS TO RECEIVE ANTI-OXIDATIVE COATING DURINGINSTALLATION. ALL OTHER CONDUCTORS ARE COPPER UNLESS NOTED OTHERWISE.5.THE CONTRACTOR SHALL ABIDE BY ALL ALUMINUM WIRING INSTALLATION STANDARDS ASREQUIRED BY THE NEIS ( NATIONAL ELECTRICAL INSTALLATION STANDARDS) PUBLISHED BYTHE NECA ( NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION). THE CONTRACTOR SHALLABIDE BY ALL STANDARDS IN THE NECA / AA - 2006, WHICH DEFINES MINIMUM STANDARDS OFQUALITY AND WORKMANSHIP. A SUMMARY OF SOME OF THE REQUIREMENTS FOLLOW:A.TERMINATE WITH COMPRESSION CONNECTORS, NO RING CUTS OF THE INSULATION, CRIMPONLY WITH A CRIMP TOOL AND THE CORRECT DIE AS REQUIRED BY THE MANUFACTURER.B.ALL CONDUCTORS TO RECEIVE ANTI-OXIDATIVE COATING DURING INSTALLATION.C.TERMINATING WITH A SET SCREW CONNECTOR, THE SCREW SHALL BE TIGHTENED USING ONLY A TORQUE WRENCH.D.NECA / AA RECOMMENDS BELLVILLE WASHERS WHEN CONNECTING ALUMINUM CONDUCTORS TO COPPER BUS BARS. ABIDE BY ALL NECA / AA RECOMMENDATIONS.E.DO NOT USE PIN CONNECTORS ( WIRE ADAPTERS) UNLESS ABSOLUTELY NECESSARY. USE ALL / ANY OTHER OPTIONS, AND IF REQUIRED, PROVE TO ENGINEER BEFORE INSTALLING. IFUSED, FOLLOW U.L. GUIDE FOR WIRE CONNECTORS ( ZMOW ), AND PROVIDE THE SPECIAL TOOLS REQUIRED BY THE MANUFACTURER. DIE-LESS CRIMPERS WILL NOT BE ACCEPTED.RACEWAY AND BOXES1.RACEWAYS: UNLESS NOTED OTHERWISE, ALL EXPOSED CONDUIT SHALL BE R.G.S. ANDCOVERED 6" BELOW FINISHED GRADE TO BE PVC, HDPE, OR LFNC. SEE NOTES A & B BELOW.PROVIDE WEATHERPROOF FLEX CONNECTIONS WHERE REQUIRED. CONTRACTOR SHALLPROVIDE JUNCTION AND/OR PULL BOXES WHERE SHOWN ON THE DRAWINGS, OR ASREQUIRED, WHETHER SHOWN ON THE DRAWINGS OR NOT, AND SIZED PER N.E.C. PROVIDENON-METALLIC ENCLOSURE WITH OPEN BOTTOM AND GASKETED COVER MANUFACTURED BYQUAZITE OR EQUIVALENT WITH DRIVE-OVER COVER ABLE TO WITHSTAND OCCASIONALNON-DELIBERATE LIGHT VEHICULAR TRAFFIC. LABEL COVER TO SUIT INSTALLATION (I.E."POWER" "COMMUNICATIONS", "LIGHTING", ETC.) AND INSTALL PER MANUFACTURER'SRECOMMENDATIONS.A.OUTDOOR:·ABOVE GRADE: R.G.S.·BELOW GRADE: SCH 40 PVC, SCH 40 HDPE, OR NON-METALLIC FLEXIBLE CONDUIT LISTED FORDIRECT BURIAL. ALL UNDERGROUND CONDUIT SHALL BE 90°C WET RATED AND INSTALLED 24"MIN. BELOW GRADE. VERIFY APPROVED USE OF HDPE WITH AHJ PRIOR TO ROUGH-IN ANDINSTALL PER NEC & MFR RECOMMENDATIONS.B.PARKING GARAGES:·RGS: 8'-0" OR LESS ABOVE GRADE OR PARKING GARAGE FLOOR LEVEL·EMT: 8'-0" MINIMUM ABOVE PARKING GARAGE FLOOR LEVEL AND WHERE NOT SUBJECT TODAMAGE. CONTRACTOR SHALL VERIFY WITH ELECTRICAL INSPECTOR IF EMT IS APPROVEDAT THIS PROJECT PRIOR TO ROUGH-IN.2.ALL WIRING SHALL BE INSTALLED IN CONDUIT. ALL CONDUIT SHALL BE A MINIMUM OF 3/4".3.CONTRACTOR SHALL PLUG AND CAP EACH END OF SPARE AND EMPTY CONDUITS ANDPROVIDE TWO SEPARATE PULL STRINGS - 200 LBS TEST POLYETHYLENE CORD.CONTRACTOR SHALL PROVIDE MANUFACTURED LONG RADIUS BENDS FOR ALL CONDUITS.RGS CONDUITS WHEN SPECIFIED, SHALL MEET UL-6 FOR GALVANIZED STEEL. ALL FITTINGSSHALL BE SUITABLE FOR USE WITH THREADED RIGID CONDUIT. COAT ALL THREADS WITH'BRITE ZINC' OR 'GOLD GALV'.4.OUTLET BOXES SHALL BE CAST ALLOY WITH THREADED HUBS IN WET/DAMP LOCATIONS ANDSPECIAL ENCLOSURES FOR OTHER CLASSIFIED AREAS.5.PROVIDE METAL CONDUIT AND TUBING MANUFACTURED BY ONE OF THE FOLLOWING:ALFLEX CORPORATION; ANAMET INCORPORATED, ANACONDA METAL HOSE; ANIXTERBROTHERS INCORPORATED; CAROL CABLE COMPANY INCORPORATED; ELECTRI-FLEXCOMPANY; GRINNELL COMPANY, ALLIED TUBE AND CONDUIT DIVISION; MONOGRAMCOMPANY, AFC; REPUBLIC CONDUIT; OR WHEATLAND TUBE COMPANY.6.PROVIDE NONMETALLIC CONDUIT AND TUBING MANUFACTURED BY ONE OF THE FOLLOWING:ANAMET INCORPORATED, ANACONDA METAL HOSE; CANTEX INDUSTRIES, HARSCOCORPORATION; CONDUX INTERNATIONAL, ELECTRICAL PRODUCTS; HUBBELLINCORPORATED, RACO, INCORPORATED; THOMAS & BETTS CORPORATION, CARLONELECTRICAL PRODUCTS; OR O-Z/GEDNEY, UNIT OF GENERAL SIGNAL.7.PROVIDE CONDUIT BODIES AND FITTINGS MANUFACTURED BY ONE OF THE FOLLOWING:CROUSE-HINDS, DIVISION OF COOPER INDUSTRIES; EMERSON ELECTRIC COMPANY,APPLETON ELECTRIC COMPANY; HUBBELL INCORPORATED, KILLARK ELECTRICMANUFACTURING COMPANY; THOMAS & BETTS CORPORATION, CARLON ELECTRICALPRODUCTS; OR O-Z/GEDNEY, UNIT OF GENERAL SIGNAL.8.PROVIDE METAL WIREWAYS MANUFACTURED BY ONE OF THE FOLLOWING: HOFFMANENGINEERING COMPANY; KEYSTONE/REES, INCORPORATED; OR SQUARE D COMPANY.9.PROVIDE BOXES, ENCLOSURES, AND CABINETS MANUFACTURED BY ONE OF THEFOLLOWING: CROUSE-HINDS, DIVISION OF COOPER INDUSTRIES; HOFFMAN ENGINEERINGCOMPANY, FEDERAL-HOFFMAN INCORPORATED; HUBBELL INCORPORATED, RACOINCORPORATED; THOMAS & BETTS, CARLON ELECTRICAL PRODUCTS; O-Z/GEDNEY, UNIT OFGENERAL SIGNAL; ROBROY INDUSTRIES INCORPORATED, ELECTRICAL DIVISION; OR SCOTTFETZER COMPANY, ADALET-PLM.SAFETY SWITCHES1.ALL DISCONNECT SWITCHES SHALL BE HEAVY-DUTY CONSTRUCTION WITH LOCKABLEHANDLES SIZED AS NOTED ON THE DRAWINGS AND/OR RISER DIAGRAM. PROVIDE NEMAENCLOSURE AS REQUIRED BY EXPOSURE TYPE. ALL FUSIBLE SWITCHES SHALL BE PROVIDEDWITH DUAL ELEMENT FUSES SIZED PER THE EQUIPMENT MANUFACTURER'SRECOMMENDATION.FUSES1.FUSES SHALL BE DUAL ELEMENT, TIME DELAY CURRENT LIMITING. CONTRACTOR SHALLCOORDINATE FUSE SIZES WITH EQUIPMENT MANUFACTURER'S REQUIREMENTS AND PERTHE N.E.C. PROVIDE FUSES MANUFACTURED FROM ONE OF THE FOLLOWING: COOPERBUSSMAN, INCORPORATED; EAGLE ELECTRIC MANUFACTURING COMPANY INCORPORATED,COOPER INDUSTRIES INCORPORATED; FERRAZ SHAWMUT INCORPORATED.06/10/22