This Change Order shall consist of establishing a new Contract Pay Items for the slip lane construction on
E.Smoky Row Road and Keystone Parkway which will be incorporated into the Contract for Project 20-
ENG-01.These new items will be tracked separately from the Contract for Project 20-ENG-01 and
reimbursed to the City by the developer when work is completed for the improvements of E.Smoky Row
Road and Keystone Parkway.
Contract Price prior to this Change Order $7,265,560.39
Contract Price will be increased/decreased by this Change Order $ 793,523.68
New Contract Price including this Change Order $8,059,084.07
Amount Adjusted Contract Cumulative%Change
Price from Original Contract
Original Contract $7,198,416.21 $7,198,416.21 N/A
COI $67,144.18 $7,265,560.39 0.93%
CO2 $793,523.68 $8,059,084.07 11.96%
DocuSign Envelope ID: DEBOC4B9-6A0C-4A20-9F28-E54D9FA5AA63
CITY OF CARMEL
TO: Rieth-Riley Construction CONTRACT CHANGE ORDER NO.: 2
1751 W. Minnesota Street DATE: 6/14/22
Indianapolis, IN. 46221 PROJECT NAME: Smoky Row Road Reconstruction
CITY REQ.NO.: 20-ENG-01
CITY P. O.NO.: 106303
CITY P. O. DATE.: 2/23/22
I. You are directed to make the following changes in this Contract:
This Change Order shall consist of establishing a new Contract Pay Items for the slip lane
construction on E.Smoky Row Road and Keystone Parkway which will be incorporated into
the Contract for Project 20-ENG-01. These new items will be tracked separately from the
Contract for Project 20-ENG-01 and reimbursed to the City by the developer when work is
completed for the improvements of E.Smoky Row Road and Keystone Parkway
II. The following referenced documents further describe the changes outlined in Paragraph 1, and
are to be considered a part of this Change Order: R.F.P.: W.D.C.No.:
Other: ATTACHMENT A
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order 7,265,560.39
Contract Price will be increased/decreased by this Change Order $ 793.523.68
New Contract Price including this Change Order 8,059,084.07
Contract Time Prior to this Change Order 0 Days 12/2/22 Completion Date
Net increased/decreased resulting from this Change Order _0 Days
Current Contract Time including this Change Order 0 Days 12/2/22 Completion Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are The Above Changes Are Approved:
Recommended: Accepted: Not Present
Beam,Longest and Neff LLC Rieth-RileyConstruction Inc.
ENGINEER CONTRACTOR Jarormlyainard, Mayor
8320 Craig Street 1751 W. Minnesota Street Atarti filnIA
Address Address MairAtiti Burke, Member
DocuSignetl by
Ex,
034456.
ri-WAlso Member
Indianapolis, IN 46250 Indianapolis, IN 46221
City/State/Zip City/State/Zip Jery' shn1an,PE, City
E gineer
By:q1 12,s2kii By: ATTEST:
r—DocuSigned by
Phone: 317-849-5832 Phone: 317- - 561 cOok-C
1.16"009p)ip.ftf,21erk
6/15/22
Date: Date: 6/17/22 Date:
DocuSign Envelope ID: DEBOC4B9-6AOC-4A20-9F28-E54D9FA5AA63
ATTACHMENT A
Roundabout Improvement-Smoky Row Rd at Keystone Pkwy
Contract Estimated Estimate
Item No. Description(in Words) Unit Quantity Unit Price Total Price for
Item
501 CONSTRUCTION ENGINEERING LS 1.00 $ 17,500.00 $ 17,500.00
502 MOBILIZATION AND DEMOBILIZATION LS 1.00 $ 24,320.58 $ 24,320.58
503 CLEARING RIGHT OF WAY LS 1.00 $ 52,242.28 $ 52,242,28
504 CONCRETE, REMOVE SYS 75.00 $ 55,83 $ 4,187,25
505 EXCAVATION, COMMON CYS 1234.00 $ 88,00 $ 108,592.00
506 TEMPORARY INLET PROTECTION EA 9.00 $ 100.00 $ 900.00
507 TEMPORARY SILT FENCE LET 685.00 $ 1.75 $ 1,198.75
508 TEMPORARY SEED LBS 33.44 $ 2.75 $ 91,96
509 TEMPORARY MULCH,TYPE A TONS 0.45 $ 425.00 $ 189.49
510 SUBGRADE TREATMENT,TYPE III SYS 440.00 $ 5,17 $ 2,274.80
511 STRUCTURE BACKFILL,TYPE 1 CYS 76.00 $ 51.81 $ 3,937.56
512 STRUCTURE BACKFILL,TYPE 4 CYS 24.00 $ 142,24 $ 3,413.76
513 COMPACTED AGGREGATE,NO.53, BASE TON 1343.00 $ 54.80 $ 73,596.40
514 MILLING,ASPHALT, 1,5 IN. SYS 1238.00 $ 9.37 $ 11,600,06
515 QC/QA-HMA,3,70, SURFACE,9.5mm TON 171.00 $ 157.97 $ 27,012.87
516 QC/QA-HMA,3,76,INTERMEDIATE,19.0mm TON 113.00 $ 183.94 $ 20,785.22
517 QC/QA-HMA,3,64,BASE,25.0mm TON 316.00 $ 137.74 $ 43,525.84
518 QC/QA-HMA,3,76,INTERMEDIATE,OG, 19.0mm TON 120.00 $ 146.72 $ 17,606.40
519 HMA SURFACE,TYPE B,9.5mm TON 33,00 $ 254.29 $ 8,391.57
520 HMA INTERMEDIATE,TYPE B, 19.0mm TON 55.00 $ 186.30 $ 10,246.50
521 QC/QA-PCCP,9 IN, SYS 202.00 $ 132.37 $ 26,738.74
522 CURB RAMP,CONCRETE SYS 82.00 $ 239.21 $ 19,615.22
523 DETECTABLE WARNING SURFACE SYS 16.00 $ 469.72 $ 7,515.52
524 CURB, INTEGRAL CONCRETE LFT 271.00 $ 41,70 $ 11,300.70
525 STRAIGHT CURB, CONCRETE LFT 451.00 $ 38.76 $ 17,480.76
526 CURB AND GUTTER,CONCRETE LFT 382.00 $ 51.96 $ 19,848.72
527 CURB AND GUTTER,ROLL CURB LFT 102.00 $ 65.96 $ 6,727.92
52B CENTER CURB,D,CONCRETE SYS 20.00 $ 213.47 $ 4,269.40
529 RIPRAP,REVETMENT TON 5.00 $ 105.63 $ 528.15
530 GEOTEXTILES FOR RIPRAP,TYPE 1A SYS 7.00 $ 96.17 $ 673.19
531 MOBILIZATION AND DEMOBILIZATION FOR SEEDING EA 1.00 $ 50.00 $ 50.00
532 TOPSOIL CYS 61.00 $ 100.58$ 6,135.38
533 SODDING SYS 1079.00 $ 3.00 $ 3,237.00
534 PIPE,TYPE 4,6 IN. LET 714.00 $ 21.36 $ 15,251.04
535 PIPE,TYPE 2 CIRCULAR, 12 IN. LFT 4.00 $ 130.44 $ 521.76
536 PIPE,TYPE 2 CIRCULAR, 15!N. LFT 8,00 $ 158.54 $ 1,268.32
537 PIPE,TYPE 2 CIRCULAR,24 IN. LFT 162.00 $ 135.67 $ 21,978,54
538 PIPE END SECTION,DIA 24" EA 1.00 $ 1,811.68 $ 1,811.68
539 PIPE,REMOVE LFT 12.00 $ 84.36 $ 1,012.32
540 INLET,REMOVE LFT 3.00 $ 920.07 $ 2,760.21
541 FURNISH&ADJUST CASTING TO GRADE EA 1.00 $ 1,211.62 $ 1,211.62
542 MANHOLE,C4 EA 4.00 $ 5,925.81 $ 23,703.24
543 MANHOLE,C15 EA 3.00 $ 8,222.71 $ 24,668.13
DocuSign Envelope ID: DEBOC4B9-6AOC-4A20-9F28-E54D9FA5AA63
ATTACHMENT A
Roundabout Improvement•Smoky Row Rd at Keystone Pkwy
Contract Estimated----- Estimate
Item.No. Description(in Words) Unit Quantity Unit Price Total Price for
Item
544 STRUCTURE, MANHOLE,RECONSTRUCTED _ _ LFT 2,00 $ 1,606.12 $ 3,212.24
545 CASTING,ADJUST TO GRADE -- EA 1.00 $ 1,126.15 $ 1,126.15
546 MANHOLE,REMOVE EA 2.00 $ 1,019.36 $ 2,038.72
547 AGGREGATE FOR UNDERDRAINS CYS 33.00 $ 75.96 $ 2,506.68
548 GEOTEXTILES FOR UNDERDRAINS SYS 343.00 $ 2.15 $ 737.45
549 TEMPORARY PAVEMENT MARKING, REMOVABLE,4 IN LFT 1986.00 $ 0.50 $ 993.00
550 CONSTRUCTION SIGN,C EA 4,00 $ 140.00 $ 560.00
551 CONSTRUCTION SIGN,A EA 12.00 $ 13000 $ 1,560.00 4
552 MAINTAINING TRAFFIC LS 1.00 $ 53,780.01 $ 53,780,01
553 SIGN POST SQ 1 REINFORCED ANCHOR BASE LFT 157.00 $ 39,60 $ 6,217.20
5.54 SHEET SIGN WITH LEGEND,0.080 IN. SFT 60.00 $ 25.20 $ 1,512.00
555 SHEET SIGN WITH LEGEND,0.100 IN. SFT 51.00 $ 28.50 $ 1,453.50
556 SIGN,RELOCATE EA 1.00 $ 323.00 $ 323.00
557 CONTROLLER,REWIRE EA 1.00 $ 3,100.00 $ 3,100.00
558 SIGNAL POLE PEDESTAL,A EA 1.00 $ 962.00 $ 962.00
559 SIGNAL POLE,RELOCATE ' EA 1.00 1 $ 1,700.00 $ 1,700.00
560 SIGNAL CABLE,COPPER,5C/14 GAUGE LFT 67,00 $ 4.70 $ 314.90
561 CABLE POLE,CIRCUIT XHHW NO 10 CU STD LFT 160.00 , $ 1.40 $ 224.00
562 TIGHT POLE,RELOCATE EA 1.00 $ 2,000.00 , $ 2,000.00
563 LIGHTING FOUNDATION TYPE 1 f EA 1.00 $ 1,871.00, $ 1,871.00
564 HANDHOLE, LIGHTING EA 1.00 $ 1,747.00 $ 1,747.00
565 WIRE NO 4 CU IN DUCT IN CONDUIT 4 1/C LFT 404.00 $ 18.70 $ 7,554.80
566 CONDUIT,2 IN.PVC LFT 996.00 $ 27.50 $ 27,390.00
567 TRANSVERSE MARKING,THERMOPLASTIC, CROSSWALK LINE,WHITE,24 LFT 160.00 $ 10.00 $ 1,600.00
IN.568 LINE,THERMOPLASTIC,BROKEN,WHITE,4 IN. LFT 68.00 $ 1.00 $ 68.00
569 LINE,THERMOPLASTIC,SOLID,WHITE,4 IN. LFT 108.00 $ 1.00 $ 108.00
570 LINE,THERMOPLASTIC,SOLID,WHITE,8 IN. LFT 73.00 $ 2.00 $ 146.00
571 LINE,THERMOPLASTIC,DOTTED,WHITE,8 IN. LFT 19.00 $ 2.00 $ 38.00 1
572 TRANSVERSE MARKING,THERMOPLASTIC,YIELD LINE LFT 52.00 $ 18.00 $ 936.00
_ 573 LINE,PREFORMED PLASTIC,SOLID,WHITE,4 IN. _ LFT 203.00 $ 2.25 $ 456.75
574 LINE,PREFORMED PLASTIC,SOLID,YELLOW,4 IN. LFT 295.00 $ 2.25 $ 663.75
PAVEMENT MESSAGE MARKING,PREFORMED PLASTIC,LANE INDICATION
575 ARROW(FISHHOOK) EA 1.00 $ 600.00 $ 600.00
576 PAVEMENT MESSAGE MARKING,PREFORMED PLASTIC,(ONLY) LFT 1.00 $ 325.00 $ 325,00
577 LINE,THERMOPLASTIC,SOLID,YELLOW,4 IN. LFT 724.00 $ 1.00 $ 724.00
578 TRANSVERSE MARKING,THERMOPLASTIC,STOP LINE,24 IN. LFT 13.00 $ 10.00 $ 130.00
579 PAVEMENT MESSAGE MARKING,THERMOPLASTIC, LANE INDICATION $ 250.00 $ 250,00
ARROW EA 1.00
580 SNOWPLOWABLE RAISED PAVEMENT MARKER EA 4.00 1 $ 150.00 $ 600.00
581 7"PCCP=TRUCK APRON -SYS 94.00 ' $ 149.72 $ 14,073.68
Roundabout Improvement-Smokey Row Rd at Keystone Pkwy Total $ 793,523.68