Loading...
HomeMy WebLinkAboutC2.4 EROSION CONTROL PLANXXXXXXXXXX.TC: 884.41Inv. 12" N 882.01Inv. 15" S 882.01TC: 884.98Inv. 10" E 883.23TC: 884.92Inv. Unable to OpenTC: 884.90Inv. Unable to OpenTC: 884.41Inv. 15" W 882.66TC: 885.76Inv. Unable to OpenTC: 884.12COCOCOMMTTTTTEx. End SectionInv. 881.42Ex. End SectionInv. 881.28Ex. End SectionInv. 880.88Ex. End SectionInv. 881.12Ex. End SectionInv. 880.90Ex. End SectionInv. 882.38Ex. End SectionInv. 881.65Ex. End SectionInv. 882.43Ex. End SectionInv. 882.40886 884886886 886886886884 8 8 488688688688688688688788 4 884886886886 886 884 884 884884884 88488 4 884 884883 883 883883 883883 883 882 882882 882882882883 88688688788788 8 888886887888 885883887887885885 88 5 8 8 5885885885885885 885 885 8858858858858"W 8"W 8"W PLPLPLPLPLPL PL PL PLPLPL 2"W2"W2"W10"STM12"STM15"STM15"STMSTME E E E SANSANSAN886.48886.23886.26WetlandHCHCHCHCHC12"STM12"STM12" STM12" STM12"STMDSDSDSCOCO8"RD8"RD8"RD8"RD8"RD 12463EX1EX2EX3EX4EX5EX6886886886886886886886886886884883884 883 884 885 885 884 885 885885 G6"F6"F 6"F6"F12"STMPIVGG8858855CONC. WASHSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SFSF SF SFPROPOSEDBUILDINGADDITIONEXISTINGBUILDING EROSION AND SEDIMENT CONTROL LEGENDEXISTINGPROPOSEDDS0GRAPHIC SCALESCALE IN FEET306090INDEX CONTOURINTERMEDIATE CONTOURBUILDING/WALLSTORM SEWERCATCH BASINMANHOLEDOWNSPOUT ADAPTERGRADING/SEEDING LIMITSSILT FENCE PER DETAIL D/C2.5INLET FILTER PER DETAIL C/C2.5CONC. WASHCONCRETE WASHOUT PERDETAIL B/C2.5REFER TO SHEET TOPOGRAPHIC SURVEYSTMSF800799REVISION:PROJECT NUMBER:20297Sheet Name:© 2021 M+A Architects04 MARCH 2022DATE:SHEET NUMBER:RENOVATION AND ADDITION MEDVET CARMEL - ANIMAL HOSPITAL 9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032STATUS:PROJECT NUMBER:CHECKED BY:DESIGNED BY:1650 WATERMARK DRIVECOLUMBUS, OHIO 43215SUITE 200DRAWN BY:2021-0012PLANEROSION CONTROLC2.4AWMAWMJDBSTABILIZED CONSTRUCTIONENTRANCE PER DETAIL B/12 (C2.12)GENERAL NOTES:1.A COPY OF THE SWPPP PLAN SHALL BE KEPT ONSITE AT ALL TIMES.2.ANY EXISTING STORM INLETS IMPACTED BY THE NEW CONSTRUCTION ACTIVITY WILL NEED THE APPROPRIATEINLET PROTECTION FOR SEDIMENT CONTROL.3.PROVIDE INLET SEDIMENT FILTER PER DETAIL C/C2.5 AT ALL EXISTING AND PROPOSED STORM INLET STRUCTURESRECEIVING FLOW FROM DISTURBED AREAS.4.EROSION AND SEDIMENTATION CONTROL PRACTICES ARE SUBJECT TO FIELD MODIFICATION AT THE DISCRETIONOF THE CITY OF CARMEL AND/OR THE INDIANA EPA.EXISTING WETLAND TO BE PROTECTED. NOGRADING OR CONSTRUCTION ACTIVITY TO BEPERFORMED IN THIS AREA.