Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A0-00 - COVER SHEET
© 2022 M+A Architects GENERAL NOTES CODE DATA SHEET INDEX SITE LOCATION MAP REVISIONS REVISION DATE DESCRIPTION ALTERNATES MEDVET INDIANAPOLIS -ANIMAL HOSPITAL 9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032 RENOVATION AND ADDITION PROJECT NO. 20297 CONTRACT DOCUMENTS04 MARCH 2022 775 YARD STREET, SUITE 325 | COLUMBUS, OHIO 43212 | PH (614) 764-0407 | FAX (614) 764-0237 H0.01 HVAC INDEX SHEET H1.01 FIRST FLOOR HVAC DEMOLITION H1.02 SECOND FLOOR HVAC DEMOLITION H1.03 ROOF HVAC DEMOLITION H2.01A FIRST FLOOR HVAC NEW WORK - AREA A H2.01B FIRST FLOOR HVAC NEW WORK - AREA B H2.01C FIRST FLOOR HVAC NEW WORK - AREA C H2.01D FIRST FLOOR HVAC NEW WORK A- AREA D H2.02 SECOND FLOOR HVAC ROOF PLAN H2.02A SECOND FLOOR HVAC NEW WORK - AREA A H2.02B SECOND FLOOR HVAC NEW WORK - AREA B H2.02C SECOND FLOOR HVAC NEW WORK - AREA C H2.02D SECOND FLOOR HVAC NEW WORK - AREA D H2.02E SECOND FLOOR HVAC NEW WORK - AREA E H2.03 ROOF HVAC NEW WORK H5.01 HVAC SCHEDULES H5.02 HVAC SCHEDULES H6.01 HVAC DETAILS H6.02 HVAC DETAILS E0.00 ELECTRICAL SYMBOLS AND LEGENDS E0.01 ELECTRICAL SITE PLAN - ENABLING / DEMO E0.02 ELECTRICAL SITE PLAN - NEW WORK E1.01 FIRST FLOOR - DEMOLITION PLAN E1.02 SECOND FLOOR - DEMOLITION PLAN E2.01A FIRST FLOOR - LIGHTING PLAN AREA A E2.01B FIRST FLOOR - LIGHTING PLAN AREA B E2.01C FIRST FLOOR - LIGHTING PLAN AREA C E2.01D FIRST FLOOR - LIGHTING PLAN AREA D E2.02A SECOND FLOOR - LIGHTING PLAN AREA A E2.02B SECOND FLOOR - LIGHTING PLAN AREA B E2.02C SECOND FLOOR - LIGHTING PLAN AREA C E2.02D SECOND FLOOR - LIGHTING PLAN AREA D E2.02E SECOND FLOOR - LIGHTING PLAN AREA E E3.01A FIRST FLOOR - POWER PLAN AREA A E3.01B FIRST FLOOR - POWER PLAN AREA B E3.01C FIRST FLOOR - POWER PLAN AREA C E3.01D FIRST FLOOR - POWER PLAN AREA D E3.01M FIRST FLOOR - MECHANICAL POWER PLAN E3.02A SECOND FLOOR - POWER PLAN AREA A E3.02B SECOND FLOOR - POWER PLAN AREA B E3.02C SECOND FLOOR - POWER PLAN AREA C E3.02D SECOND FLOOR - POWER PLAN AREA D E3.02E SECOND FLOOR - POWER PLAN AREA E E3.02M SECOND FLOOR - MECHANICAL POWER PLAN E3.03 ROOF - POWER PLAN E4.01 ELECTRICAL ENLARGED PLANS E5.01 ELECTRICAL SCHEDULES E5.02 ELECTRICAL SCHEDULES E5.03 ELECTRICAL SCHEDULES E5.04 ELECTRICAL SCHEDULES E6.01 ONE LINE DIAGRAM - EXISTING E6.02 ONE LINE DIAGRAM - NEW WORK E6.03 ONE LINE SCHEDULES E6.04 ONE LINE SCHEDULES E7.01 ELECTRICAL DETAILS E7.02 ELECTRICAL DETAILS E7.03 ELECTRICAL DETAILS T0.00 TECHNOLOGY SYMBOLS AND LEGENDS T2.01A FIRST FLOOR - TECHNOLOGY PLAN - AREA A T2.01B FIRST FLOOR - TECHNOLOGY PLAN - AREA B T2.01C FIRST FLOOR - TECHNOLOGY PLAN - AREA C T2.01D FIRST FLOOR - TECHNOLOGY PLAN - AREA D T2.02A SECOND FLOOR - TECHNOLOGY PLAN - AREA A T2.02B SECOND FLOOR - TECHNOLOGY PLAN - AREA B T2.02C SECOND FLOOR - TECHNOLOGY PLAN - AREA C T2.02D SECOND FLOOR - TECHNOLOGY PLAN - AREA D T2.02E SECOND FLOOR - TECHNOLOGY PLAN - AREA E T4.01 TECHNOLOGY DETAILS A8.00 FINISH LEGEND A8.01 ROOM FINISH SCHEDULE A8.02 INTERIOR DETAILS A8.10A FIRST FLOOR FINISH PLAN - AREA A A8.10B FIRST FLOOR FINISH PLAN - AREA B A8.10C FIRST FLOOR FINISH PLAN - AREA C A8.10D FIRST FLOOR FINISH PLAN - AREA D A8.20A SECOND FLOOR FINISH PLAN - AREA A A8.20B SECOND FLOOR FINISH PLAN - AREA B A8.20C SECOND FLOOR FINISH PLAN - AREA C A8.20D SECOND FLOOR FINISH PLAN - AREA D A8.20E SECOND FLOOR FINISH PLAN - AREA E A9.01 MILLWORK ELEVATIONS A9.02 MILLWORK ELEVATIONS A9.03 MILLWORK ELEVATIONS A9.04 MILLWORK ELEVATIONS A9.05 MILLWORK ELEVATIONS A9.06 MILLWORK ELEVATIONS A9.07 MILLWORK ELEVATIONS A9.08 MILLWORK ELEVATIONS A9.09 MILLWORK ELEVATIONS A9.10 MILLWORK ELEVATIONS A9.11 MILLWORK ELEVATIONS A9.12 MILLWORK ELEVATIONS A9.20 MILLWORK DETAILS A9.21 MILLWORK DETAILS A9.22 MILLWORK DETAILS A9.23 MILLWORK DETAILS A9.24 MILLWORK DETAILS A10.00 DOOR SCHEDULE & DETAILS A10.01 DOOR SCHEDULE A10.02 STOREFRONT ELEVATIONS & DETAILS S0.00 STRUCTURAL NOTES S0.01 COLUMN SCHEDULE S1.01 FOUNDATION PLAN S2.01 SECOND FLOOR / LOW ROOF FRAMING PLAN S2.02 ROOF FRAMING PLAN S2.03 SCREENWALL FRAMING PLAN S3.01 FOUNDATION DETAILS S4.01 FRAMING DETAILS S4.02 FRAMING DETAILS S5.01 ROOF DETAILS F0.01 FIRE PROTECTION INDEX SHEET F2.01 FIRST FLOOR FIRE PROTECTION NEW WORK F2.02 SECOND FLOOR FIRE PROTECTION NEW WORK F2.03 ROOF FIRE PROTECTION NEW WORK F6.01 FIRE PROTECTION DETAILS P0.01 PLUMBING INDEX SHEET P1.00 UNDERFLOOR PLUMBING DEMOLITION P1.01 FIRST FLOOR PLUMBING DEMOLITION P1.02 SECOND FLOOR PLUMBING DEMOLITION P1.03 ROOF PLUMBING DEMOLITION P1.11 FIRST FLOOR MEDICAL GAS DEMOLITION P2.00 UNDERFLOOR PLUMBING NEW WORK P2.01A FIRST FLOOR PLUMBING NEW WORK - AREA A P2.01B FIRST FLOOR PLUMBING NEW WORK - AREA B P2.01C FIRST FLOOR PLUMBING NEW WORK - AREA C P2.01D FIRST FLOOR PLUMBING NEW WORK - AREA D P2.02B SECOND FLOOR PLUMBING NEW WORK - AREA B P2.02C SECOND FLOOR PLUMBING NEW WORK - AREA C P2.02D SECOND FLOOR PLUMBING NEW WORK - AREA D P2.02E SECOND FLOOR PLUMBING NEW WORK - AREA E P2.03 ROOF PLUMBING NEW WORK P3.01 FIRST FLOOR MEDICAL GAS NEW WORK P3.02 SECOND FLOOR MEDICAL GAS NEW WORK P5.01 PLUMBING SCHEDULES P6.01 PLUMBING DETAILS P6.02 PLUMBING DETAILS P6.03 PLUMBING DETAILS P7.01 PLUMBING STACKS P7.02 PLUMBING STACKS A0.00 COVER SHEET C0.1 DEMOLITION PLAN C1.1 STAKING PLAN C1.2 STAKING DETAILS C2.1 GRADING & STORM SEWER PLAN C2.2 STORM SEWER DETAILS C2.3 STORM SEWER PROFILES C2.4 EROSION CONTROL PLAN C2.5 EROSION CONTROL DETAILS C3.1 UTILITY PLAN C3.2 UTILITY DETAILS L-1 LANDSCAPE PLAN L-2 PLANT LIST AND DETAILS A0.01 SYMBOLS & ABBREVIATIONS A0.02 INTERIOR PARTITION SCHEDULE A0.03 TYP MOUNTING HEIGHTS A0.04 ACCESSIBILITY STANDARDS A0.30 UL DESIGN NO. U415 A0.31 UL DESIGN NO. U419 A0.32 UL DESIGN NO. U455 & U905 A0.50 FIRST FLOOR LIFE SAFETY PLAN A0.51 SECOND FLOOR LIFE SAFETY PLAN A0.90 PHASING PLAN A1.10 OVERALL FIRST FLOOR DEMO PLAN A1.20 OVERALL SECOND FLOOR DEMO PLAN A1.30 OVERALL ROOF DEMO PLAN A1.40 DEMO - EXTERIOR ELEVATIONS A2.00 ARCHITECTURAL SITE PLAN A2.01 SITE PLANS, ELEVATIONS AND DETAILS A2.02 SITE PLANS, ELEVATIONS AND DETAILS A2.10 OVERALL FIRST FLOOR NEW WORK PLAN A2.10A FIRST FLOOR NEW WORK PLAN - AREA A A2.10B FIRST FLOOR NEW WORK PLAN - AREA B A2.10C FIRST FLOOR NEW WORK PLAN - AREA C A2.10D FIRST FLOOR NEW WORK PLAN - AREA D A2.20 OVERALL SECOND FLOOR NEW WORK PLAN A2.20A SECOND FLOOR NEW WORK PLAN - AREA A A2.20B SECOND FLOOR NEW WORK PLAN - AREA B A2.20C SECOND FLOOR NEW WORK PLAN - AREA C A2.20D SECOND FLOOR NEW WORK PLAN - AREA D A2.20E SECOND FLOOR NEW WORK PLAN - AREA E A2.30 FIRST FLOOR ROOF PLAN A2.31 SECOND FLOOR ROOF PLAN A3.10 OVERALL FIRST FLOOR REFLECTED CEILING PLAN A3.10A FIRST FLOOR RCP - AREA A A3.10B FIRST FLOOR RCP - AREA B A3.10C FIRST FLOOR RCP - AREA C A3.10D FIRST FLOOR RCP - AREA D A3.20 OVERALL SECOND FLOOR REFLECTED CEILING PLAN A3.20A SECOND FLOOR RCP - AREA A A3.20B SECOND FLOOR RCP - AREA B A3.20C SECOND FLOOR RCP - AREA C A3.20D SECOND FLOOR RCP - AREA D A3.20E SECOND FLOOR RCP - AREA E A4.10 OVERALL FIRST FLOOR EQUIPMENT PLAN A4.10A FIRST FLOOR EQUIPMENT PLAN - AREA A A4.10B FIRST FLOOR EQUIPMENT PLAN - AREA B A4.10C FIRST FLOOR EQUIPMENT PLAN - AREA C A4.10D FIRST FLOOR EQUIPMENT PLAN - AREA D A4.20 OVERALL SECOND FLOOR EQUIPMENT PLAN A4.20A SECOND FL EQUIPMENT PLAN - AREA A A4.20B SECOND FL EQUIPMENT PLAN - AREA B A4.20C SECOND FL EQUIPMENT PLAN - AREA C A4.20D SECOND FL EQUIPMENT PLAN - AREA D A4.20E SECOND FL EQUIPMENT PLAN - AREA E A5.01 ENLARGED TOILET PLANS AND ELEVATIONS A5.02 ENLARGED KENNEL RUNS AND ELEVATIONS A6.01 EXTERIOR ELEVATIONS A6.02 EXTERIOR ELEVATIONS A7.01 EXTERIOR WALL SECTIONS A7.02 EXTERIOR WALL SECTIONS A7.03 EXTERIOR WALL SECTIONS A7.04 EXTERIOR WALL SECTIONS A7.05 ELEVATOR - PLANS, SECTIONS & DETAILS A7.06 STAIR - PLANS, SECTIONS & DETAILS A7.07 EXTERIOR DETAILS A7.08 EXTERIOR DETAILS A7.09 EXTERIOR DETAILS SEE LIFE SAFETY PLAN A0.50 & A0.51 PROJECT LOCATION: MEDVET CARMEL 650 MAYFLOWER PARK DRIVE CARMEL, INDIANA 46032 1. ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH ALL GOVERNING CODES AND ORDINANCES, INCLUDING ALL FEDERAL, STATE, LOCAL AND LIFE SAFETY CODES, INCLUDING BUT NOT NECESSARILY LIMITED TO THE 2012 INTERNATIONAL BUILDING CODE (IBC), THE INDIANA BUILDING CODE (2014 EDITION)., THE 2010 A.D.A. GUIDELINES, AND ALL CODES AND REFERENCES NOTED ELSEWHERE ON THESE DRAWINGS OR APPLICABLE DUE TO GOVERNING CODE. 2. REPORT ANY CONFLICTS OR INCONSISTENCIES TO THE ARCHITECT BEFORE PROCEEDING WITH ANY WORK. 3. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTORS TO INITIATE, MAINTAIN, AND SUPERVISE ALL SAFETY MEASURES, PRECAUTIONS, AND PROGRAMS IN CONNECTION WITH THE WORK. 4. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL CONDITIONS; BEFORE PROCEEDING WITH ANY WORK, ALL DISCREPANCIES BETWEEN FIELD CONDITIONS AND DRAWINGS SHALL BE REPORTED TO A/E. 5. FIELD VERIFY ALL DIMENSIONS REQUIRED FOR EQUIPMENT PRIOR TO INSTALLATION. COORDINATE LAYOUT WITH OWNER TO ACCOMMODATE ACTUAL SIZES NEEDED. 6. OBTAIN ANY MISSING DIMENSIONS OR INFORMATION FROM THE ARCHITECT PRIOR TO PROCEEDING WITH THE WORK. DO NOT SCALE ANY DRAWINGS. 7. DO NOT DEMOLISH ANYTHING NOT SPECIFICALLY NOTED ON THESE PLANS. IF CONCEALED ITEMS ARE DISCOVERED IN EXISTING WALLS (OR OTHER CONSTRUCTION ASSEMBLIES) GENERALLY NOTED AS "TO BE DEMOLISHED," THEN DO NOT PROCEED WITH DEMOLITION WITHOUT RECEIVING CONSENT FROM THE ARCHITECT (AND THE CONSULTING ENGINEER, WHEN APPLICABLE). 8. SOME DETAILS, SYSTEMS, AND MEANS OF CONSTRUCTION ARE SHOWN TYPICALLY FOR A SINGLE CONSTRUCTION. WITH REASONABLE MODIFICATION THEY CAN BE APPLIED TO ALL REMAINING SIMILAR DETAILS BY THE CONTRACTOR. 9. CONTRACTOR IS ENCOURAGED TO VISIT THE SITE PRIOR TO BIDDING TO DETERMINE THE ACTUAL SITE CONDITIONS. 10. THE ARCHITECT AND ENGINEERING CONSULTANTS SHALL NOT BE RESPONSIBLE FOR THE MEANS, METHODS, PROCEDURES, TECHNIQUES, OR SEQUENCES OF CONSTRUCTION NOT HEREIN SPECIFIED. 11. ALL EQUIPMENT SHOWN DIAGRAMMATICALLY ONLY. PROVIDE DETAILED DESIGN AS WELL AS ALL INTEGRATED SYSTEM REQUIREMENTS PRIOR TO FABRICATION AND OR INSTALLATION. 12. ALL EQUIPMENT, MILLWORK, AND CABINETRY ARE SHOWN DIAGRAMMATICALLY ONLY. PROVIDE DETAILED DESIGN AS WELL AS ALL MECHANICAL AND ELECTRICAL AND/OR REQUIREMENTS PRIOR TO FABRICATION/INSTALLATION. 13. CUTTING AND PATCHING SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR REQUIRING SUCH WORK. REFER TO GENERAL CONDITIONS. 14. ALL COORDINATION SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR OR HIS DESIGNEE. 15. WORK MAY BE REQUIRED TO BE PERFORMED OFF-HOURS. VERIFY WORK HOURS REQUIREMENTS WITH THE OWNER AND INCLUDE COSTS FOR SAME IN BID. 16. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF HIS OWN WORK UNTIL FINAL ACCEPTANCE. ALL ASSEMBLIES ARE DESIGNED TO BE SELF- SUFFICIENT WHEN IN PLACE AND SHOULD HAVE NECESSARY MEANS OF TEMPORARY PROTECTION PRIOR TO FINAL COMPLETION. 17. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR DAILY REMOVAL OF HIS/HER SPOILS, CUTTINGS, DROPPINGS, EXCESS MATERIAL AND DEBRIS. 18. IN THE EVENT THAT A CONFLICT OF RESPONSIBILITY OCCURS FOR A PART OF THE WORK, THE CONTRACTOR WHO IS RESPONSIBLE FOR THE CSI SPECIFICATION DIVISION IN WHICH THE WORK IS CUSTOMARILY PLACED WILL PERFORM THE WORK. 19. ALL CONTRACTORS SHALL REFER TO MECHANICAL, ELECTRICAL, PLUMBING AND F,F&E DRAWINGS FOR INFORMATION PERTAINING TO THAT SPECIFIC TRADE, WHICH MAY IMPACT THEIR TRADE'S WORK. FIELD VERIFY & COORDINATE PLACEMENT OF ALL RESPECTIVE M/E/P FIXTURES AND/OR F,F&E ITEMS, AND REPORT ALL DISCREPANCIES TO A/E BEFORE PROCEEDING WITH WORK. 20. IF DIRECTIONS ON THESE PLANS CONFLICT WITH DIRECTION ESTABLISHED BY THE OWNER, THEN CONTACT THE OWNER OR THE ARCHITECT FOR CLARIFICATION PRIOR TO PROCEEDING WITH THE WORK. 21. ABIDE BY ALL OWNER'S TYPICAL REQUIREMENTS REGARDING TEMPORARY FACILITIES, INFECTION CONTROL, JOBSITE ACCESS AND SECURITY, AND ALL OTHER APPLICABLE TYPICAL OWNER REQUIREMENTS. 22. ALL RATED FIRE ASSEMBLIES MUST HAVE THE PROPER U.L. RATING. IF WORK HEREIN REQUIRES CUTTING OF EXISTING RATED ASSEMBLIES, THEN PATCHING SHALL CONFORM TO THE ORIGINAL OR LATEST REQUIREMENTS OF THE RELEVANT U.L. RATING. REFER TO THE SPECIFICATIONS FOR MORE INFORMATION. 23. ERECT DUST BARRIERS AS REQUIRED TO PREVENT TRANSFER OF CONSTRUCTION DUST TO NEIGHBORING SPACES. PROVIDE ALL CONTAINMENT AND INFECTION CONTROL PROTOCOLS REQUIRED BY THE OWNER. 24. PROVIDE FRT BLOCKING IN WALLS, AS REQUIRED, IN ORDER TO SECURE ALL EQUIPMENT, ACCESSORIES, HANDRAILS, HARDWARE, CASEWORK, ETC. COORDINATE WITH APPROPRIATE TRADE AND/OR MANUFACTURER AND THE CORRESPONDING INSTALLATION AGENT. BLOCKING TO IS NOT NECESSARY FOR WALL MOUNTED BIO HAZARD CONTAINERS, SHARPS BOX CONTAINERS, SOAP DISPENSERS, GLOVE DISPENSERS OR TOWEL DISPENSERS. 25. REFER TO THE SPECIFIC SCHEDULES FOR DESCRIPTIONS OF DOOR TYPES, GLASS TYPES, HARDWARE SETS AND ACCESSORIES. 26. PROVIDE TRANSITION STRIPS AT ALL FLOOR INTERSECTIONS OF DIFFERENT MATERIALS, EXCEPT AS MAY BE PROVIDED OTHERWISE BY OWNER DIRECTION. 27. DIFFERENT FLOOR MATERIALS SHALL MEET UNDER THE CENTERLINE OF DOORS UNLESS NOTED OTHERWISE. 28. SEPARATE DISSIMILAR METALS TO PREVENT CORROSION CAUSED BY ELECTROLYTIC ACTION OR OTHER CAUSES AS RECOMMENDED BY THE RESPECTIVE PRODUCT MANUFACTURER/SUPPLIER. 29. REFER TO THE PROJECT MANUAL AND GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION FOR ADDITIONAL REQUIREMENTS FOR COMPLETION AND ADMINISTRATION OF THE PROJECT. 30 REFER TO THE PROJECT MANUAL FOR INFORMATION REGARDING THE DOCUMENTATION OF COMPLETED BLOCKING PRIOR TO CONCEALMENT BY SUBSEQUENT CONSTRUCTION. 1650 WATERMARK DRIVE | COLUMBUS, OHIO 43215-7010 | PH. (614) 487-1650 | FAX (614) 487-8981 | CSMEPTKORDA/ NEMETH ENGINEERING, INC. - NONE AT THIS TIME 9240 Robinhood Circle | Westerville, Ohio 43082 | PH. (614) 530-5273 | bking@kla-studios.com | LANDSCAPE ARCHITECTURE + SITE PLANNINGkla studios - 1 2022-03-17 Addendum 01 1 1 PT. OF THE SOUTHWEST 1/4, SECTION 7, TWP. 17 NORTH, RG. 3 EAST, 2ND P.M., CLAY TWP., HAMILTON COUNTY, INDIANA SITE LEGAL DESCRIPTION