Loading...
HomeMy WebLinkAboutA2.20 OVERALL SECOND FLO NEW WORK PLANUP A6.02 A6.01 1 A6.024A6.013 BREAK ROOM 230 KITCHENETTE 231 MOTHERS ROOM 225 IT 226 WELLNESS 229 RR 228T RR 227T CENTRAL SUPPLY 223 ELEVATOR STAIR S200 DENTISTRY 221 SURGERY SUITE 210 XRAY 208 DIRTY PROCEDURE 205 DIRTY STERILE PROCESSING 207A FLUOROSCOPY OR 206 OR 1 201 OR 3 203 OPEN TO BELOW OR 2 202 EX STAIR S201 WORK STATIONS 214 CLINCAL MANAGERS 217 OFFICE 216 OFFICE 215 OFFICE 213 OFFICE 212 COMMUNICATIONS 211 RR 220T CAT I-131 ANTE RM 219 CAT I-131 219A MARKETING CLOSET 218 CORRIDORX220CORRIDOR X230 PRIVATE WORK 221A OR 4 204 CORRIDOR X210 1 CORRIDOR X240 CLEAN STERILE PROCESSING 207B TEAM WORK ROOM 210A DOCTORS 210B CONFERENCE ROOM 232 LOCKER ROOM 224 CORRIDOR X250 DENTISTRY WK RM 221B ROOF ROOF ROOF CORRIDOR X230 A6.02 2 A10.02 8 A6.023 A6.012 A. SEE SHEET A0.02 FOR WALL TYPES. ALL INTERIOR PARTITION WALLS ARE FULL HEIGHT, TYPE S3J, U.N.O. B. SEE SHEET A0.04 FOR TYPICAL ADA INFORMATION. C. SEE SHEETS A0.50 & A0.51 FOR LIFE SAFETY PLANS INDICATING RATED PARTITION WALL CONSTRUCTION. D. SEE SHEET SERIES A3 FOR CEILING HEIGHTS. E. SEE SHEET SERIES A4 FOR EQUIPMENT LAYOUTS. SEE SPECIFICATION APPENDIX FOR MORE DETAILED EQUIPMENT INFORMATION. F. SEE SHEETS A10.0, A10.01 & A10.02 FOR DOOR & WINDOW SCHEDULES & TYPES. G. SEE SHEET SERIES A8 FOR FLOOR PATTERN PLAN AND FINISH INFORMATION. SEE FINISH PLANS FOR LOCATION OF CORNER GUARDS. H. SEE ALL CONSULTANT AND VENDOR DRAWINGS FOR ADDITIONAL INFORMATION. I. ROOM NUMBERS USED HERE ARE FOR THE PURPOSES OF THIS PROJECT. VERIFY ANY FINAL ROOM NUMBERING SYSTEM WITH THE OWNER PRIOR TO MAKING FINAL MARKS OR SCHEDULES RELATED TO ROOM NUMBERS. J. PATCH AND REPAIR ANY SURFACE OR OTHER ITEM DAMAGED BY OR INVOLVED IN CONSTRUCTION ACTIVITIES TO "AS NEW". REFER TO ENGINEERING DRAWINGS FOR MEP WORK THAT MAY REQUIRE PATCHING BY GENERAL TRADES CONTRACTOR. K. AREAS SHADED ARE EXISTING TO REMAIN. L. ALL NEW BLOCKING TO BE DOCUMENTED PER GENERAL NOTES AND PROJECT MANUAL. M. INFILL EXISTING SECOND FLOOR SLAB AT ALL ABANDONED PENETRATIONS WITH "LIKE" STRUCTURE PER STRUCTURAL DRAWINGS. INCLUDE THE VACATED STAIRWAY, SHAFTS, AND PIPING PENETRATIONS. EXISTING SPACE TO REMAIN. FUTURE SPACE AREA OF WORK PLAN KEY © 2022 M+A Architects PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: 20297 OVERALL SECOND FLOOR NEW WORK PLAN 04 MARCH 2022 A2.20MEDVET INDIANAPOLIS -ANIMAL HOSPITAL9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032RENOVATION AND ADDITION3/32" = 1'-0"A2.20 1 overall second floor plan FLOOR PLAN GENERAL NOTES KEY PLAN A B CD E CODED NOTES - FLOOR PLAN 230 FLIP DOWN EXAM TABLE. PROVIDE BLOCKING IN WALL PER MANUFACTURER'S RECOMMENDATIONS. COORDINATE LOCATION WITH OWNER. SEE DETAIL 4/A8.02. 231 WALLS ARE OF DIFFERENT THICKNESS, ALIGN THIS FACE. 232 GYP BOARD ON METAL FURRING TO BE TIGHT TO STEEL COLUMN. SEE PARTITION TYPE "S1D" ON SHEET A0.02. 233 CENTER STUD OF PARTITION WALL ON STEEL COLUMN. 234 ALIGN FINISHED FACE OF INTERIOR PARTITION WALL WITH FINISHED FACE OF WINDOW JAMB. 235 COORDINATE WITH HVAC. INSTALL FURRING PARTITIONS AS CLOSE TO HVAC DUCT AS POSSIBLE 236 FLOOR PENETRATION. COORDINATE WITH HVAC AND STRUCTURAL DRAWINGS. 237 O.R. PASS-THRU. COORDINATE WITH ELEVATIONS 238 FUR VAC 239 PROVIDE ONE LAYER OF 5/8" GWB ON EXISTING WOOD STUDS, FULL HEIGHT, TO DECK. SEE WALL TYPE "S3O" ON SHEET A0.02 FOR TYPICAL INFORMATION. 240 WET TABLE WITH SINK - COORDINATE WITH PLUMBING DRAWINGS 241 JANITOR FLOOR SINK, COORDINATE WITH PLUMBING DRAWINGS 242 STAINLESS STEEL DOUBLE-HUNG PASS THRU WINDOW, SEE ELEVATIONS 244 PATCH HOLE IN EXISTING WALL RESULTING FROM THE REMOVAL OF A DOOR OR WINDOW. PATCH TO MATCH EXISTING CONSTRUCTION. USE SALVAGED MASONRY AS NEEDED. 245 PROVIDE ONE LAYER OF 5/8" GWB ON EXISTING WALL TO A HEIGHT OF 6" ABOVE CEILING. PROVIDE LEAD LINING TO A HEIGHT OF 7'-0" AS SPECIFIED IN PHYSICIST REPORT. 246 SEE EXAM 14 FOR TYPICAL ELEVATIONS AND NOTES. 247 PROVIDE ISO CLIP AND 2 LAYERS OF 5/8" GWB ON EXISTING WOOD STUDS, FULL HEIGHT, TO DECK. SEE WALL TYPE "S3O" ON SHEET A0.02 FOR TYPICAL INFORMATION. 248 WALL MOUNTED, SEMI RECESSED, FIRE EXTINGUISHER IN CABINET - SEE SPECIFICATIONS. 249 EXISTING STRUCTURAL STEEL COLUMN TO REMAIN. 250 THIS ROOM TO HAVE SPECIAL LEAD SHIELDING. COORDINATE WITH PHYSICIST REPORT FOR SPECIFIC SHIELDING REQUIREMENTS AND EXTENT FOR THIS ROOM. 251 30" X 30" ACCESS PANEL, INSTALL BOTTOM 18" ABOVE FINISH FLOOR 252 ROOF CRICKET PROVIDE SLOPE TO DRAINS 253 ROOF DRAIN - SEE PLUMBING DRAWINGS 254 NEW MEMBRANE ROOFING - SEE SPECIFICATIONS 255 PRE-FABRICATED PRE-FINISHED METAL WALL CAP FLASHING 256 PATCH AND REPAIR ALL MEMBRANE ROOFING AT NEW ROOF DRAIN INSTALLATIONS 257 ROOF TOP HVAC UNIT ENCLOSURE - SEE STRUCTURAL DRAWINGS 258 ROOF TOP HVAC UNIT - SEE HVAC DRAWINGS 259 NEW ROOF INFILL - MATCH EXISTING ROOFING 260 48" WIDE X 84" HIGH OPENING IN METAL ENCLOSURE 261 SHEET METAL CONDUCTOR HEAD AND INTEGRAL SCUPPER PER SMACNA SPECIFICATIONS 262 WALL MOUNTED STEEL ROOF LADDER 263 36" X 36" ROOF HATCH 264 INFILL FLOOR AT OLD OPENING WITH LIKE MATERIAL. COORDINATE WITH STRUCTURAL DRAWINGS. 265 NEW 5/8" GWB OVER EXISTING EXTERIOR WALL STUD FRAMING. EXTEND TO UNDERSIDE OF DECK. 266 EXISTING WALLS TO REMAIN. PATCH AND PAINT AS REQUIRED IN FINISH SCHEDULE. 267 PROVIDE LOW E, OPAQUE FILM ON BACK SIDE OF EXISTING STOREFRONT GLASS PANELS. VENT ABOVE CEILING. 268 FUTURE SHELL SPACE AS HIGHLIGHTED WITH CROSSHATCH PATTERN TO BE UNFINISHED. SPACES TO HAVE NO CEILINGS, NO FINISHES NO DRYWALL AND NO LEAD DRYWALL HUNG ON INTERIOR PARTITION WALLS. DRYWALL TO BE HUNG ON INSIDE FACE OF EXTERIOR WALLS ONLY. 269 FLOOR EXPANSION JOINT COVER 07/13/22