Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A7.05 ELEVATOR -PLANS, SECTIONS & DETAILS
FIRST FLOOR 100' -0" SECOND FLOOR 112' -0" ROOF T.O.S. L.P. 126' -0 1/2" ELEV PIT 96' -0"14' - 0 1/2"12' - 0"PIT DEPTH4' - 0"CLEAR OPENING7' - 0"CLEAR OPENING7' - 0"MIN. ROUGH OPENING8' - 3"MIN. ROUGH OPENING8' - 3"1' - 4"3' - 6"PIT LADDER: 2.5" x 3/8" FLAT BAR STRINGERS, 3/4" DIA RUNGS 12" @ O.C., 4 1/2" CLEARANCE BETWEEN RUNGS AND WALL. LOCATE AS SHOWN ON APPROVED ELEVATOR SHOP DWGS. SILL SUPPORT BY ELEV MFR WATERPROOFING 8" CONC WALL 4" PREF FDN DRAIN AROUND PIT WATERPROOFING ON BOTTOM OF SLAB HOIST BEAM ELEVATOR POWER UNIT CLEAR2" MIN.13' - 7 1/4" (12 '- 5" MIN. CLEAR)ELEVATOR HOISTWAY VENT AS REQUIRED 8" CMU -COORDINATE W/ STRUCTURAL DRAWINGS FIRE STOP AND SEALANT IN FLUTES 1HR RATED OVERHEAD COILING DOOR 1 HR RATED CEILING - SEE RCP 1 A7.05 2' - 6" CLEAR OPENING 3' - 6"2' - 6" LEAVE OUT UNTIL ELEV FRAME AND CONTROLER ARE IN PLACE 8' - 6" ROUGH OPENING A7.05 3 PIT LADDER -LOCATE PER ELEV MFR SHOP DWGS SUMP BY P.C., LOCATE PER ELEV MFR SHOP DWGS ELEVATOR CAB PROVIDE POCKETS IN CORRIDOR WALL FOR HALL FIXTURES AS DIRECTED BY ELEV CONTRACTOR PROVIDE LIGHT AND SWITCH NEAR LADDER CONTROL PANEL 7 3/4"1 1/2"2"1/2"2" 8" C.M.U. JAMB FRAME BY ELEVATOR MFR G.C. FILL BETWEEN R.O. AND FRAME AFTER FRAME IS SET 5/8" GYP BD ON 7/8" MTL FURRING CORRIDOR SIDE OF OPENING © 2022 M+A Architects PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: 20297 ELEVATOR -PLANS, SECTIONS & DETAILS 04 MARCH 2022 A7.05MEDVET INDIANAPOLIS - ANIMAL HOSPITAL9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032RENOVATION AND ADDITION1/2" = 1'-0"A7.05 1 section -elevator shaft 1/2" = 1'-0"A7.05 2 enlarged plan -elevator shaft 1 1/2" = 1'-0" A7.05 3 detail -elevator dr jamb 07/13/22