Loading...
HomeMy WebLinkAboutA8.10A FIRST FLOOR FINISH PL -AREA AEXISTING SPACE TO REMAIN. FUTURE SPACE AREA OF WORK PLAN KEY RR 105T WAITING ROOM 101 CAT-FRIENDLY WAITING 103 VESTIBULE 100 EX STAIR S101 WP-1 FLOORING DIRECTION FLOORING DIRECTION FLOORING DIRECTION RSF-2 RSF-1 RSF-2 RSF-1 FLOORING DIRECTION PT-9 CG-1 CG-1 CG-1 CG-1 CG-1 CG-1 CG-11' - 0"1' - 0" CG-1 1' - 0"RECEPTION 102 A8.10BA8.10BA8.10CA8.10C809 809 FLOORING DIRECTION RSF-2 RSF-1 809 810 CG-1 © 2022 M+A Architects PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: 20297 FIRST FLOOR FINISH PLAN -AREA A 04 MARCH 2022 A8.10AMEDVET INDIANAPOLIS - ANIMAL HOSPITAL9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032RENOVATION AND ADDITIONKEY PLAN A BC D 1/4" = 1'-0"1 First Floor Finish Plan - Area A CODED NOTES - FINISH 802 PAINT ALL SIDES OF EXPOSED COLUMN TO MATCH ADJACENT WALL COLOR. 803 INSTALL WALL PROTECTION TO 48" A.F.F. AT THIS LOCATION. 805 INSTALL FRP-1 TO 8' A.F.F. AT THIS LOCATION. 806 INSTALL FRP-1 ON PANEL BEHIND WET TABLE AT THIS LOCATION. 807 INSTALL FRP-1 TO 48"A.F.F. AT THIS LOCATION. 808 INSTALL WALL PROTECTION TO ALIGN WITH BACKSPLASH AT THIS LOCATION, TYP. U.N.O. 809 PAINT SOFFIT ABOVE PT-1 ALL SIDES INCLUDING BOTTOM. REFER TO SHEET A8.00 AND A3 SERIES FOR FURTHER INFORMATION. 810 PAINT ALL SIDES OF COLUMN PT-1. 1 2022-03-17 Addendum 01 1 07/13/22