Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A8.10C FIRST FLOOR FINISH PL -AREA C
EXISTING SPACE TO REMAIN. FUTURE SPACE AREA OF WORK PLAN KEY INTERNAL MEDICINE 143 I.M. PRIVATE WORK 143B SURGERY RECEIVING 141 ENDOSCOPY 143A DOCTORS OFFICE 142 RR 140T RR 139T ELEVATOR 0000 STAIR S100 RAD. TECH WORK AREA 152 CORRIDOR X140 EXAM 14 134 EXAM 9 129 EXAM 13 133 EXAM 10 130 EXAM 12 132 EXAM 11 131 EXAM 8 128 EXAM 7 127 EXAM 15 136 EXAM 3 123 EXAM 4 124 EXAM 5 125 CORRIDOR X150 RR 119T SHELLED CT 152A GRIEF 137 GRIEF 138 EXAM 6 126 EXAM 2 122 CORRIDOR X130 CORRIDOR X110 PT-4 / WP-2 PT-3PT-3PT-3PT-3PT-3PT-3PT-3PT-3 PT-3 SURG RECEIVING WK RM 141A CG-1 CG-2 CG-2 CG-1 CG-1 CG-1 803 WP-1 WP-1 FLOORING DIRECTION FLOORING DIRECTIONFLOORING DIRECTION FLOORING DIRECTION FLOORING DIRECTION FLOORING DIRECTION FLOORING DIRECTION FLOORING DIRECTION FLOORING DIRECTION FLOORING DIRECTION A8.10BA8.10BA8.10A A8.10AA8.10DA8.10D808 CG-1 PT-3PT-3PT-3PT-3PT-3PT-3FLOORING DIRECTION FLOORING DIRECTION FLOORING DIRECTION FLOORING DIRECTION FLOORING DIRECTION FLOORING DIRECTION FLOORING DIRECTION FLOORING DIRECTION FLOORING DIRECTION FLOORING DIRECTION FLOORING DIRECTION FLOORING DIRECTION CG-1 CG-1 CG-1 CG-1 RSF-3 RSF-1 FLOORING DIRECTION RSF-1 ST-2 WP-1 FLOORING DIRECTION ST-2 RSF-1 RSF-3 ST-2 RSF-2 RSF-1 FLOORING DIRECTION RSF-2 RSF-1 RSF-2 RSF-1RSF-1 RSF-2 RSF-1 RSF-2 RSF-1 RSF-2 RSF-2 RSF-3 RSF-2 RSF-1 RSF-2 RSF-1 RSF-2 RSF-1 CORRIDOR X120 RSF-2 RSF-3 FLOORING DIRECTION FLOORING DIRECTION FLOORING DIRECTION RSF-1 RSF-2 RSF-1 RSF-2 RSF-1 RSF-2 RSF-2 RSF-3 RSF-1 RSF-2 RSF-1 RSF-2 RSF-1 RSF-2 RSF-1 RSF-2 RR 106T EXAM 1 121 MEP 135 SEALED RSF-2 RSF-1 RSF-2 RSF-1 RSF-2 CG-1 CG-1 CG-1 CG-1 CG-1 CG-1 CG-1 809 809 809 809 809 809 809 809 FLOORING DIRECTIONPT-3© 2022 M+A Architects PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: 20297 FIRST FLOOR FINISH PLAN -AREA C 04 MARCH 2022 A8.10CMEDVET INDIANAPOLIS - ANIMAL HOSPITAL9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032RENOVATION AND ADDITIONKEY PLAN A BC D 1/4" = 1'-0"A8.10C 1 First Floor Finish Plan -Area C CODED NOTES - FINISH 802 PAINT ALL SIDES OF EXPOSED COLUMN TO MATCH ADJACENT WALL COLOR. 803 INSTALL WALL PROTECTION TO 48" A.F.F. AT THIS LOCATION. 805 INSTALL FRP-1 TO 8' A.F.F. AT THIS LOCATION. 806 INSTALL FRP-1 ON PANEL BEHIND WET TABLE AT THIS LOCATION. 807 INSTALL FRP-1 TO 48"A.F.F. AT THIS LOCATION. 808 INSTALL WALL PROTECTION TO ALIGN WITH BACKSPLASH AT THIS LOCATION, TYP. U.N.O. 809 PAINT SOFFIT ABOVE PT-1 ALL SIDES INCLUDING BOTTOM. REFER TO SHEET A8.00 AND A3 SERIES FOR FURTHER INFORMATION. 810 PAINT ALL SIDES OF COLUMN PT-1. 07/13/22