Loading...
HomeMy WebLinkAboutA8.20B SECOND FLOOR FINISH PLAN -AREA BEXISTING SPACE TO REMAIN. FUTURE SPACE AREA OF WORK PLAN KEY SURGERY SUITE 210 CORRIDOR X220 DIRTY STERILE PROCESSING 207A FLUOROSCOPY OR 206 CORRIDOR X210 OR 4 204 DIRTY PROCEDURE 205 XRAY 208 CG-1, TYP. CG-1 CG-1 CG-1 CG-1, TYP. CG-1 CG-1 CG-1 CG-1 CG-1 DOCTORS 210B TEAM WORK ROOM 210A A8.20A A8.20AA8.20DA8.20D803 803 CLEAN STERILE PROCESSING 207B 803 FLOORING DIRECTION FLOORING DIRECTION FLOORING DIRECTION 806806 FLOORING DIRECTION CG-1 RSF-3 RSF-5 RSF-3 RSF-5 RSF-3 RSF-5 809 809 © 2022 M+A Architects PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: 20297 SECOND FLOOR FINISH PLAN -AREA B 04 MARCH 2022 A8.20BMEDVET INDIANAPOLIS - ANIMAL HOSPITAL9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032RENOVATION AND ADDITIONKEY PLAN A B CD E 1/4" = 1'-0" A8.20B 1 Second Floor Finish Plan -Area B CODED NOTES - FINISH 802 PAINT ALL SIDES OF EXPOSED COLUMN TO MATCH ADJACENT WALL COLOR. 803 INSTALL WALL PROTECTION TO 48" A.F.F. AT THIS LOCATION. 805 INSTALL FRP-1 TO 8' A.F.F. AT THIS LOCATION. 806 INSTALL FRP-1 ON PANEL BEHIND WET TABLE AT THIS LOCATION. 807 INSTALL FRP-1 TO 48"A.F.F. AT THIS LOCATION. 808 INSTALL WALL PROTECTION TO ALIGN WITH BACKSPLASH AT THIS LOCATION, TYP. U.N.O. 809 PAINT SOFFIT ABOVE PT-1 ALL SIDES INCLUDING BOTTOM. REFER TO SHEET A8.00 AND A3 SERIES FOR FURTHER INFORMATION. 810 PAINT ALL SIDES OF COLUMN PT-1. 07/13/22