Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A8.20C SECOND FLOOR FINISH PLAN -AREA C
EXISTING SPACE TO REMAIN. FUTURE SPACE AREA OF WORK PLAN KEY WORK STATIONS 214 OFFICE 213 OFFICE 212COMMUNICATIONS 211 OFFICE 215OFFICE 216 CLINCAL MANAGERS 217 CAT I-131 219A CAT I-131 ANTE RM 219 MARKETING CLOSET 218 RR 220T CORRIDOR X230A8.20DA8.20D805805 WP-1 FLOORING DIRECTION CG-1 CG-1 CG-1 RSF-5 RSF-3 RSF-1 RSF-3 CPT-1 RSF-3 809 809 © 2022 M+A Architects PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: 20297 SECOND FLOOR FINISH PLAN -AREA C 04 MARCH 2022 A8.20CMEDVET INDIANAPOLIS - ANIMAL HOSPITAL9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032RENOVATION AND ADDITIONKEY PLAN A B CD E 1/4" = 1'-0"A8.20C 1 Second Floor Finish Plan -Area C CODED NOTES - FINISH 802 PAINT ALL SIDES OF EXPOSED COLUMN TO MATCH ADJACENT WALL COLOR. 803 INSTALL WALL PROTECTION TO 48" A.F.F. AT THIS LOCATION. 805 INSTALL FRP-1 TO 8' A.F.F. AT THIS LOCATION. 806 INSTALL FRP-1 ON PANEL BEHIND WET TABLE AT THIS LOCATION. 807 INSTALL FRP-1 TO 48"A.F.F. AT THIS LOCATION. 808 INSTALL WALL PROTECTION TO ALIGN WITH BACKSPLASH AT THIS LOCATION, TYP. U.N.O. 809 PAINT SOFFIT ABOVE PT-1 ALL SIDES INCLUDING BOTTOM. REFER TO SHEET A8.00 AND A3 SERIES FOR FURTHER INFORMATION. 810 PAINT ALL SIDES OF COLUMN PT-1. 07/13/22