Loading...
HomeMy WebLinkAboutA8.20D SECOND FLOOR FINISH PLAN -AREA DEXISTING SPACE TO REMAIN. FUTURE SPACE AREA OF WORK PLAN KEY DENTISTRY 221 PRIVATE WORK 221A STAIR S200 CENTRAL SUPPLY 223 ELEVATOR 000 A8.20CA8.20CA8.20BA8.20BA8.20EA8.20ECORRIDOR X240 DENTISTRY WK RM 221B CHASE 00 807 803 803 CG-1, TYP. CG-1 CG-1 CG-1 CG-1 FLOORING DIRECTION FLOORING DIRECTION FLOORING DIRECTION CG-1 CG-1 CG-1 CG-1 CG-1 RSF-3 SEALED J.C. 222 807 SEALED ST-2 RSF-3 ST-2 CG-1 807 807 807 CG-1 803 © 2022 M+A Architects PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: 20297 SECOND FLOOR FINISH PLAN -AREA D 04 MARCH 2022 A8.20DMEDVET INDIANAPOLIS - ANIMAL HOSPITAL9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032RENOVATION AND ADDITIONKEY PLAN A B CD E 1/4" = 1'-0"A8.20D 1 Second Floor Finish Plan -Area D CODED NOTES - FINISH 802 PAINT ALL SIDES OF EXPOSED COLUMN TO MATCH ADJACENT WALL COLOR. 803 INSTALL WALL PROTECTION TO 48" A.F.F. AT THIS LOCATION. 805 INSTALL FRP-1 TO 8' A.F.F. AT THIS LOCATION. 806 INSTALL FRP-1 ON PANEL BEHIND WET TABLE AT THIS LOCATION. 807 INSTALL FRP-1 TO 48"A.F.F. AT THIS LOCATION. 808 INSTALL WALL PROTECTION TO ALIGN WITH BACKSPLASH AT THIS LOCATION, TYP. U.N.O. 809 PAINT SOFFIT ABOVE PT-1 ALL SIDES INCLUDING BOTTOM. REFER TO SHEET A8.00 AND A3 SERIES FOR FURTHER INFORMATION. 810 PAINT ALL SIDES OF COLUMN PT-1. 07/13/22