Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
C2.5 EROSION CONTROL DETAILS
3/4" MIN. DRAIN ROCK 4" X 6" TRENCH OVER THE FILTER MATERIAL. PONDING HT. 12" MIN.12" MIN. 8" 6"6" 16" MAX. FLOW PONDING HT. FLOW 9" MAX. STORAGE HT. NOTES: GENERAL 1. CONSTRUCT SILT FENCE BEFORE UPSLOPE DISTURBANCE BEGINS. 2. BRING ENDS OF SILT FENCE UPSLOPE SLIGHTLY SO THAT PONDING WATER WILL BE PREVENTED FROM FLOWING AROUND ENDS. 3. WHEN POSSIBLE PRESERVE VEGETATION 5 FEET UP UPSLOPE OF THE SILT FENCE. IF REMOVED, REESTABLISH WITHIN 7 DAYS FROM INSTALLATION OF FENCE. 4. SILT FENCE SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDING EFFICIENCY. 5. THE FILTER FABRIC SHALL BE PURCHASED IN A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID THE USE OF JOINTS. WHEN JOINTS ARE NECESSARY, FILTER CLOTH SHALL BE SPLICED TOGETHER ONLY AT A SUPPORT POST, WITH A MINIMUM OF A 6 INCH OVERLAP, AND SECURELY SEALED. 6. THE STANDARD STRENGTH FILTER FABRIC SHALL BE STAPLED OR WIRED TO THE FENCE, AND 8 INCHES OF THE FABRIC SHALL BE EXTENDED INTO THE TRENCH. THE FABRIC SHALL NOT EXTEND MORE THAN 16 INCHES ABOVE THE ORIGINAL GROUND SURFACE. FILTER FABRIC SHALL NOT BE STAPLED TO EXISTING TREES. 7. THE TRENCH SHALL BE BACKFILLED AND SOIL COMPACTED OVER THE FILTER FABRIC. 8. SILT FENCES SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFUL PURPOSE, BUT NOT BEFORE THE UPSLOPE AREA HAS BEEN PERMANENTLY STABILIZED. 9. THE USE OF STRAW WATTLES HAS PROVEN TO BE A VERSATILE AND EFFECTIVE ESC BMP, ESPECIALLY IN RESIDENTIAL SETTINGS. STRAW WATTLES MAY BE SUBSTITUTED FOR SILT FENCE. 10. THE USE OF COMPOST FILTER SOCKS AND COMPOST BLANKETS ARE GAINING WIDER ACCEPTANCE NATIONWIDE. THEY ARE NOW APPROVED FOR USE ON ALL COLUMBUS SWP3 PLANS AND CONSTRUCTION SITES. 11. STRAW WATTLES AND COMPOST ROLLS TO BE A MINIMUM OF 12" IN DIAMETER. MAINTENANCE 1. SILT FENCES AND FILTER BARRIERS SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. SHOULD THE FABRIC ON A SILT FENCE OR FILTER BARRIER DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER IS STILL NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY. 2. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM EVENT. THEY MUST BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER. 3. ANY SEDIMENT DEPOSITS REMAINING AFTER THE SILT FENCE OR FILTER BARRIER IS NO LONGER REQUIRED SHALL BE DRESSED TO CONFORM WITH THE EXISTING GRADE, PREPARED AND SEEDED. TRENCH DETAIL INSTALLATION WITHOUT TRENCHING 2" X 2" STAKES, SPACED A MAXIMUM OF 10'-0" APART AND DRIVEN SECURELY INTO THE GROUND 12" (MINIMUM). CONTINUOUS SYNTHETIC FILTER FABRIC STAPLE FILTER MATERIAL TO STAKES AND EXTEND 8" OF FILTER MATERIAL INTO THE EXCAVATED TRENCH. FLOW 4"X6" TRENCH WITH COMPACTED BACKFILL STEEL OR WOOD POST 32" LENGTH MIN. 6" DETAIL SILT FENCE N.T.S.D MOUNTABLE BERM (6" MIN.) 3' PROFILE 100' MINIMUM LENGTH 10' MIN. EXISTING PAVEMENT 20' MINIMUM WIDTH 10' MIN. 10' MIN.PLAN VIEW NOTES: 1. LENGTH - MINIMUM OF 100' 2. WIDTH - 20' MINIMUM, SHOULD BE FLARED AT THE EXISTING ROAD TO PROVIDE A TURNING RADIUS. 3. GEOTEXTILE FABRIC (FILTER CLOTH) SHALL BE PLACED OVER THE EXISTING GROUND PRIOR TO PLACING STONE. 4. STONE - CRUSHED AGGREGATE (#2 TO #3) OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT SHALL BE PLACED AT LEAST 6" DEEP OVER THE LENGTH AND WIDTH OF THE ENTRANCE. 5. SURFACE WATER - ALL SURFACE WATER FLOWING TO OR DIVERTED TOWARD CONSTRUCTION ENTRANCES SHALL BE PIPED THROUGH THE ENTRANCE, MAINTAINING POSITIVE DRAINAGE. PIPE INSTALLED THROUGH THE STABILIZED CONSTRUCTION ENTRANCE SHALL BE PROTECTED WITH A MOUNTABLE BERM WITH 5:1 SLOPES AND A MINIMUM OF 6" OF STONE OVER THE PIPE. 6. LOCATION - A STABILIZED CONSTRUCTION ENTRANCE SHALL BE LOCATED AT EVERY POINT WHERE CONSTRUCTION TRAFFIC ENTERS OR LEAVES A CONSTRUCTION SITE. VEHICLES LEAVING THE SITE MUST TRAVEL OVER THE ENTIRE LENGTH OF THE STABILIZED CONSTRUCTION ENTRANCE. 7. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC RIGHT-OF-WAY MUST BE REMOVED IMMEDIATELY. 8. WASHING - WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAYS. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH STONE AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. 9. PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN. EXISTING PAVEMENT MINIMUM 6" OF #2-#3 AGGREGATE OVER LENGTH AND WIDTH OF STRUCTURE EARTH FILL 12" PIPEGEOTEXTILE CLASS 'C' OR BETTER EXISTING GROUND 5 :1 5:1 DETAIL STABILIZED CONSTRUCTION ENTRANCE N.T.S.E SEWN IN SPOUT R 15'15'TOP VIEW SIDE VIEW BAG PLACED ON AGGREGATE OR STRAW HIGH STRENGTH DOUBLE STITCHED "J" TYPE SEAMS HIGH STRENGTH STRAPPING FOR HOLDING HOSE IN PLACE WATER FLOW FROM PUMP PUMP DISCHARGE HOSE OPENING ACCOMMODATES UP TO 4" DISCHARGE HOSE AGGREGATE OR STRAW UNDERLAYMENT DIRTBAG DETAIL DEWATERING BAG N.T.S. A SIGN 0.5 MM PLASTIC LINER5' MIN.8' MIN. SILT FENCE PER DETAIL D, THIS SHEET HOLLOW OUT AREA6"MIN.5' MIN.HOLLOW OUT AREA 6" MIN. DEPTH 8' MIN. SILT FENCE PER DETAIL D, THIS SHEET. PLAN VIEW NOTES: 1. CONCRETE TRUCKS SHALL UTILIZE AREAS TO WASHOUT TRUCKS. 2. ACCUMULATED CONCRETE SHALL BE REMOVED FROM THE SITE AND DISPOSED PROPERLY. 3. PLACE PLASTIC LINER OVER THE ENTIRE HOLLOW OUT AREA PRIOR TO USE. 4. PROVIDE ITEMS NOTED ABOVE INCLUDING REMOVAL OF CONCRETE WASHOUT UPON COMPLETION OF THE PROJECT AS NOTED IN THE BID PRICE FOR THE PROJECT. 5. FILL HOLLOW AREA TO A DEPTH OF 4 TO 6 INCHES WITH CMSC ITEM 703 AGGREGATE, SIZE #57, #2, OR #4. 6. USE OF ROLL AWAY OR OTHER PORTABLE CONTAINERS IS AN ACCEPTABLE ALTERNATIVE (AND HIGHLY ENCOURAGED) PROVIDED THEY ARE USED IN ACCORDANCE WITH NPDES GUIDELINES ON CONCRETE WASHOUT. CONCRETE WASHOUT AREA SIGN ELEVATION 4x4 Wood Post DETAIL CONCRETE TRUCK WASHOUT AREA N.T.S. B SIGN INSTALLATION: 1. REMOVE GRATE. 2. INSTALL BAG (RESTS ON LIP OF CASTING). 3. REINSTALL GRATE. MAINTENANCE: 1. REMOVE GRATE. 2. BAG CAN BE CLEANED SEVERAL WAYS: A) PICK UP BAG AND DUMP IT. B) SHOVELING DEBRIS OUT OF BAG C) VAC-UNIT 3. SHAKE LOOSE DEBRIS OUT OF BAG OR RINSE WITH WATER. 4. REINSTALL BAG. 5. REINSTALL GRATE. TO BE USED ON STRUCTURES: EXISTING: EX2, EX3, EX5 PROPOSED: 1, 2, 4, 5, 6 DETAIL INLET FILTER (BELOW GRATE INLET PROTECTION) N.T.S.C NOTES: 1. ALL INLETS RECEIVING FLOW FROM RUNOFF, PUMPING ACTIVITIES, OR OTHER DIRECT DISCHARGES SHALL BE FITTED WITH AN INLET PROTECTION DEVICE THAT IS PROPERLY SIZED AND SECURED TO REDUCE THE DISCHARGE OF SEDIMENT INTO THE STORM SEWER AND RECEIVING STREAM. INLET PROTECTION IS REQUIRED ON ALL INLETS RECEIVING DISCHARGE REGARDLESS OF WHETHER OR NOT THE INLET IS TRIBUTARY TO ANY DOWNSTREAM EROSION AND SEDIMENT CONTROLS. 2. DISCHARGE HOSES USED DURING PUMPING ACTIVITIES SHALL BE FITTED WITH SEDIMENT BAGS THAT ARE PROPERLY SIZED PER MANUFACTURER'S RECOMMENDATIONS REGARDLESS OF WHAT OTHER SEDIMENT CONTROLS ARE IN PLACE FURTHER DOWNSTREAM. SEDIMENT BAGS MUST BE PROPERLY SECURED TO THE DISCHARGE HOSE AND PLACED OVER VEGETATED AREAS, WHERE FEASIBLE, DURING DISCHARGE. SEE DETAIL ABOVE OF A TYPICAL SEDIMENT BAG INSTALLATION. REVISION: PROJECT NUMBER: 20297 Sheet Name: © 2021 M+A Architects 04 MARCH 2022 DATE: SHEET NUMBER:RENOVATION AND ADDITIONMEDVET CARMEL - ANIMALHOSPITAL9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032STATUS: PROJECT NUMBER: CHECKED BY: DESIGNED BY: 1650 WATERMARK DRIVE COLUMBUS, OHIO 43215 SUITE 200 DRAWN BY: 2021-0012 DETAILS EROSION CONTROL C2.5AWM ELIJAH MEHAN JDB INSTALLATION: 1. REMOVE GRATE. 2. INSTALL BAG (RESTS ON LIP OF CASTING). 3. REINSTALL GRATE. 4. INSTALL BONNET GUARD WITH TABS BETWEEN GRATE & BONNET CASTING MAINTENANCE: 1. REMOVE THE BONNET GUARD. 2. REMOVE GRATE. 3. BAG CAN BE CLEANED SEVERAL WAYS: A) PICK UP BAG AND DUMP IT. B) SHOVELING DEBRIS OUT OF BAG. C) VAC-UNIT 4. SHAKE LOOSE DEBRIS OUT OF BAG OR RINSE WITH WATER. 5. REINSTALL BAG. 6. REINSTALL GRATE. 7. REINSTALL BONNET GUARD. TO BE USED ON STRUCTURES: EXISTING: EX4 PROPOSED: N/A 07/13/22