Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
H1.02 - SECOND FLOOR HVAC DEMOLITION
x5 x6.5 x7 x8 x10 x10 xA xB xC xD xE xF x2 x2 T 1 1 2 2 2 1 1 5 3 3 3 3 4 2 6 T 6 PROJECT NUMBER: CHECKED BY: DESIGNED BY: 1650 WATERMARK DRIVE COLUMBUS, OHIO 43215 SUITE 200 DRAWN BY: © 2021 M+A Architects PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: KEY PLAN 2021-0012 A B CD E 20297 SECOND FLOOR HVAC DEMOLITION 04 MARCH 2022 H1.02Eric Stephens Caleb Ledford Ann Guan MEDVET INDIANAPOLIS -ANIMAL HOSPITAL9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032RENOVATION AND ADDITIONN 0'4' 8'2' 1' SCALE: 1/8" = 1'-0"1 FLOOR PLAN SECOND FLOOR DEMOLITION -OVERALL CODED NOTES: 1. REMOVE EXISTING RTU. 2. REMOVE EXISTING EXHAUST FAN ON ROOF. 3. UPTO EXISTING RTU ON ROOF. 4. UP TO EXISTING EXHAUST FAN ON ROOF. 5. EXISTING SPLIT SYSTEM CONDENSING UNIT ON ROOF. 6. REMOVE EXISTING THERMOSTATS. 07/13/22