Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
H2.01D - FIRST FLOOR HVAC NEW WORK A- AREA D
2.2 D F A C B E xD xE xF EX MRI CASSETTE 151 ELECT. 150 RECEIVING / MORGUE 149 SHELL REHAB 146 NEURO SHELL SPACE 144 ULTRASOUND 145 READING RM 148 RR 147T 2 EF2 D1-8"Ø 225 D1-6"Ø 100 D1-8"Ø 125 D1-8"Ø 1508/108/10R1-22/10 R1-22/10 1 3 4 R3-16/10 700 1 R2-16/10 R1-22/10 200 R2-16/10 AC1 8-1-7 TB22-500/350(4.0KW) 12/8 18/1214/1210/10TT 8-1-8 TB24-950/520(6.5KW) 8-1-9 TB22-450/220(1.5KW) T 14/10 14/1016/8 1/4"C 5 6 8/88/8 16/10 R3-22/10 100 PROJECT NUMBER: CHECKED BY: DESIGNED BY: 1650 WATERMARK DRIVE COLUMBUS, OHIO 43215 SUITE 200 DRAWN BY: © 2021 M+A Architects PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: KEY PLAN 2021-0012 A BC D 20297 FIRST FLOOR HVAC NEW WORK A-AREA D 04 MARCH 2022 H2.01DEric Stephens Caleb Ledford Ann Guan MEDVET INDIANAPOLIS -ANIMAL HOSPITAL9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032RENOVATION AND ADDITIONN 0' 2' 4'1' SCALE: 1/4" = 1'-0"1 FLOOR PLAN FIRST FLOOR NEW WORK - AREA D CODED NOTES: 1. UP TO LEVEL 02 ABOVE. 2. TERMINATE EXHAUST IN SIDEWALL PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. 3. EXISTING CT CASSETTE WITH INTEGRAL HVAC. 4. REFRIGERANT LINESET UP TO OUTDOOR AIR COOLED CONDENSING UNIT ON ROOF. SINGLE LINE REPRESENTS BOTH PIPES IN LINESET. SIZE PIPING PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. 5. ROUTE CONDENSATE TO THROUGH EXTERIOR WALL AT 18" ABOVE GRADE AND TURN DOWN. 6. UP TO EF4 ON ROOF ABOVE. 07/13/22