Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
H2.02B - SECOND FLOOR HVAC NEW WORK - AREA B
x1x7 x9 x10 54 x11 x4 x3 x5.5 21 22 24 26 27 28 20 23 23 25 xD xE x2 Y Y Z Z FLUOROSCOPY OR 206 OR 5 205 OR 4 204 DIRTY STERILE PROCESSING 207A CORRIDOR X210 XRAY 208 SURGERY SUITE 210 CORRIDOR X220 CLEAN STERILE PROCESSING 207B DOCTORS 210B TEAM WORK ROOM 210A CORRIDOR X240 12/10 12/6 12/10 9-2-01 TB23-675/300(4.5KW) 9-2-03 TB23-675/300(4.5KW) H15 H6.01 4 2"LPS H1 6 7 3/4"C 1 2 D1-10"Ø 250 D1-8"Ø 200 D1-10"Ø 300 8-2-9 TB23-750/750(5.0KW)12/12R1-22/22 R1-22/10 250 8/8 D1-8"Ø 175 D1-8"Ø 175 D1-8"Ø 175D1-8"Ø 175 D1-8"Ø 225 D1-8"Ø 22514/128-2-10 TB23-925/500(6.5KW) 8-2-11 TB21-225/145(2.0KW) R1-22/10 D1-8"Ø 150 D1-8"Ø 125 D1-8"Ø 125 8/8 8-2-8 TB21-250/250(3.0KW) 8-2-7 TB21-250/250(2.5KW) R1-22/10 R1-22/10 R1-22/10 T T T T T 12/108/1030/18 30/14 1 30/1426/12 16/1212/1012/612/612/1012/1012/612/1014/10 14/6 14/6 12/1016/12D2-10"Ø 225 (TYP. 3) D2-10"Ø 225 (TYP. 3) D2-10"Ø 240 (TYP. 4) R2-8/14 240 (TYP. 2) R2-8/14 240 (TYP. 2) R2-8/16 410 3 3 3 9-2-02 TRE2-475/200 9-2-04 TRE2-475/200 9-2-11 TB23-960/300(6.0KW) 9-2-12 TRE3-760/200 5 5 H6.01 36/14 1/2" 10/108 D1-6"Ø 100 18/1230/14 14/6PROJECT NUMBER: CHECKED BY: DESIGNED BY: 1650 WATERMARK DRIVE COLUMBUS, OHIO 43215 SUITE 200 DRAWN BY: © 2021 M+A Architects PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: KEY PLAN 2021-0012 A B CD E 20297 SECOND FLOOR HVAC NEW WORK -AREA B 04 MARCH 2022 H2.02BEric Stephens Caleb Ledford Ann Guan MEDVET INDIANAPOLIS -ANIMAL HOSPITAL9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032RENOVATION AND ADDITIONN 0' 2' 4'1' SCALE: 1/4" = 1'-0"1 FLOOR PLAN SECOND FLOOR NEW WORK - AREA B CODED NOTES: 1. UP TO RTU9 ON ROOF ABOVE. 2. UP TO EF6ON ROOF ABOVE. 3. LOCATE RETURN GRILLE IN SIDEWALL OF CHASE. BOTTOM OF GRILLE AT 1'-0" A.F.F. 4. STAINLESS STEEL DUCTWORK MINIMUM 1'-0" LENGTH UPSTREAM AND 5'-0" LENGTH DOWNSTREAM OF DUCT MOUNTED HUMIDIFIER. MAKE DUCT TRANSITIONS AS NECESSARY FOR HUMIDIFIER DUCT SIZE. 5. WALL MOUNTED STEAM GENERATOR UNIT FOR HUMIDIFIER. COORDINATE EXACT LOCATION WITH OWNER. 6. MAKE-UP WATER PIPING FOR HUMIDIFIER STEAM GENERATOR. 7. REFER TO SHEET H2.02D FOR CONDENSATE DRAIN PIPE CONTINUATION. 8. 4" Ø EXHAUST VENT DOWN TO DRYER. UP TO ROOF AND TERMINATE PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. COORDINATE WITH FINAL EQUIPMENT LOCATION. 07/13/22