HomeMy WebLinkAboutP0.01 - PLUMBING INDEX SHEETGENERAL NOTES –PLUMBING (APPLY TO ALL PLUMBING DRAWINGS) 1. THE SYSTEM DESIGN IS BASED ON THE LATEST EDITION OF THE OHIO PLUMBING CODE, INCLUDING ALL AMENDMENTS THROUGH THE DATE OF DRAWING ISSUE. 2. FINISHED GROUND FLOOR ELEVATION IS 100.00'. U.N.O. (USGS ELEVATION 886.6). 3. INVERTS AND LOCATIONS SHOWN FOR PIPING CONNECTIONS TO THE VARIOUS SITE UTILITIES HAVE BEEN COORDINATED WITH THE CIVIL ENGINEER ’S DOCUMENTS PRIOR TO BIDDING. CONTRACTOR SHALL VERIFY INVERTS, PIPE SIZES, AND LOCATIONS WITH SITE CONTRACTOR PRIOR TO ANY INSTALLATION. REPORT ANY DISCREPANCIES TO THE ARCHITECT. 4. COORDINATE ALL PIPING WITH CEILING ELEVATIONS, STRUCTURE, MECHANICAL AND ELECTRICAL WORK. UNLESS DESIGNATED AS BELOW SLAB, ALL PIPING IS INTENDED TO BE CONCEALED ABOVE FINISHED CEILING IN AREAS WITH CEILINGS. IF THERE IS NO CEILING, COORDINATE PIPING TO RUN AS HIGH AS POSSIBLE. DO NOT INSTALL PIPING IN FRONT OF OR OVER TOP OF ELECTRICAL SWITCH GEAR OR PANELS. 5. ALL DOWNSPOUTS, STACKS, RISERS, ETC. SHALL BE CAREFULLY INSTALLED SO AS TO BE CONCEALED BY FINISHED CONSTRUCTION. WHERE PIPING IS EXPOSED, LOCATIONS SHALL BE COORDINATED WITH OTHER TRADES. 6. UNLESS NOTED OTHERWISE, SLOPE ALL SANITARY AND STORM PIPING AT NO LESS THAN 1/8" PER FOOT. ALL SANITARY PIPING SMALLER THAN 3” SHALL BE SLOPED AT NO LESS THAN ¼” PER FOOT. 7. REFER TO PIPING DIAGRAMS, DETAILS, AND STACKS FOR PIPING AND PIPE SIZES NOT SHOWN ON THE FLOOR PLANS. PIPE SIZES SERVING INDIVIDUAL FIXTURES ARE INDICATED ON THE PLUMBING FIXTURE SCHEDULE. 8. ALL FLOOR DRAINS ARE CONSIDERED "EMERGENCY FLOOR DRAIN" UNLESS DFU'S ARE ASSIGNED. ALL FLOOR DRAINS SHALL BE PROVIDED WITH ASSE 1072 COMPLIANT BARRIER TYPE TRAP SEAL. 9. ROOF DRAINS, BODIES, PANS, AND RECEIVERS SHALL BE INSULATED. ALL HORIZONTAL STORM PIPING (PRIMARY AND SECONDARY) AND ALL VERTICAL SECONDARY STORM PIPING SHALL BE INSULATED. 10. PROVIDE ISOLATION VALVES IN ALL SUPPLY BRANCHES SERVING MULTIPLE FIXTURES. PROVIDE ADDITIONAL ISOLATION VALVES AS SHOWN ON THE DRAWINGS. PROVIDE BALANCING VALVES ON ALL HOT WATER RETURN PIPE BRANCHES. 11. SEAL ALL THROUGH FLOOR PENETRATIONS AIR AND WATER TIGHT. 12. ALL EXPOSED INSULATED PIPING IN FINISHED AREAS SHALL HAVE A PVC JACKET. 13. ALL EXTERIOR EXPOSED NATURAL GAS PIPING SHALL BE PROTECTED AGAINST CORROSION WITH TWO COATS OF PRIMER AND ONE COAT OF FINISH PAINT. COORDINATE COLOR SELECTION WITH ARCHITECT. 14. GAS PIPING IN RETURN AIR PLENUMS SHALL NOT HAVE SHUT-OFF VALVES, UNIONS, FITTINGS OR THREADED FITTINGS WITHIN THE PLENUM SPACE. 15. ALL CONNECTIONS TO GAS FIRED EQUIPMENT SHALL BE MADE WITH DIRT LEG, UNION AND SHUT OFF VALVE. PIPE ALL APPLIANCE REGULATOR VENTS TO THE BUILDING EXTERIOR PER NFPA. 16. MAKE ALL CONNECTIONS TO KITCHEN EQUIPMENT. PROVIDE SHUT - OFF VALVES, UNIONS, SUPPLIES, AND WASTES REQUIRED FOR A COMPLETE CONNECTION. SUPPLIES TO KITCHEN FAUCETS AT SINKS SHALL HAVE CHECK VALVES. ALL UNDERGROUND WASTE PIPING IN KITCHEN AREAS SHALL BE CAST IRON. 17. MINIMUM SIZE FOR OXYGEN AND NITROGEN PIPING SHALL BE ½". MINIMUM SIZE FOR VACUUM PIPING SHALL BE ¾". 18. THE EXISTING AND DEMOLITION DRAWINGS HAVE BEEN GENERATED BASED ON RECORD DRAWINGS AND LIMITED FIELD INVESTIGATIONS. ALL EXISTING WORK MUST BE FIELD VERIFIED PRIOR TO BEGINNING CONSTRUCTION. FIELD VERIFY EXACT SIZES AND LOCATIONS OF ALL EXISTING EQUIPMENT AND PIPING BEFORE GENERATING COORDINATION DRAWINGS. 19. PRIOR TO ANY DEMOLITION, VERIFY WHICH EQUIPMENT IS TO BE REMOVED AND TURNED OVER TO THE OWNER. ALL OTHER ITEMS ARE TO BE REMOVED FROM THE SITE BY THE PLUMBING CONTRACTOR. PROTECT EXISTING EQUIPMENT THAT IS TO REMAIN IN SERVICE. ALL EXISTING PIPING INSULATION THAT IS DAMAGED DURING THE DEMOLITION OR NEW WORK PROCESS SHALL BE REPLACED. 20. COORDINATE THE EXACT AREA OF CEILING REMOVAL NECESSARY FOR ALL WORK. THE CEILING REMOVAL SHALL BE BY THE GENERAL TRADES CONTRACTOR AT THE PLUMBING CONTRACTOR ’S EXPENSE. 21. NOTE THAT THE EXISTING PLUMBING AND MEDICAL GAS SYSTEMS SERVE AREAS OUTSIDE OF THE RENOVATION AND MUST REMAIN IN OPERATION THROUGHOUT THE PROJECT. COORDINATE REQUIRED SHUTDOWNS WITH THE OWNER ’S REPRESENTATIVE. CAP AND SEAL ALL REMAINING PIPING IMMEDIATELY AFTER DEMOLITION OF PORTIONS OF SYSTEM. 22. COORDINATE ALL CONSTRUCTION ACTIVITIES AND REQUIRED PHASING THAT MAY AFFECT NORMAL BUILDING OPERATIONS WITH THE OWNER ’S REPRESENTATIVE. IT WILL BE NECESSARY FOR SOME WORK INDICATED ON THIS PLAN TO BE PERFORMED OUT OF PHASE AND/OR DURING NIGHTS OR WEEKENDS. BP S M SPECIALTIES AND MISCELLANEOUS WALL HYDRANT (FREEZE PROOF) THROUGH FLOOR AT LEVEL SHOWN VALVES BACKFLOW PREVENTER PLUMBING SYMBOLS LIST VALVE IN RISER/DROP CONNECT TO EXISTING ROOF DRAIN FLOOR OR AREA DRAIN SHOCK ABSORBER YARD HYDRANT HOSE BIBB CLEANOUT VENT THROUGH ROOF (VTR) UNION THERMOMETER PIPE RISE PIPE DROP P-TRAP METER GAUGE FLEXIBLE CONNECTION PIPE SLEEVE CAPPED PIPE GAS PRESSURE REGULATOR MEDICAL OXYGEN OUTLET SOLENOID VALVE PRESSURE RELIEF VALVE PRESSURE REDUCING VALVE PLUG VALVE GLOBE VALVE CHECK VALVE BUTTERFLY VALVE BALL VALVE WITH GAUGE TAPPINGS BALANCING/SHUT-OFF VALVE FUTURE N2O N2 WAGD FLOW ARROW UNDER FLOOR PIPING EXISTING TO BE ABANDONED EXISTING TO BE REMOVED EXISTING TO REMAIN NITROUS OXIDE NITROGEN WASTE GAS DISPOSAL MV VC CA MA O2 P MEDICAL VACUUM VACUUM CLEANING COMPRESSED AIR MEDICAL AIR MEDICAL OXYGEN PROPANE G FOV NATURAL GAS FUEL OIL VENT FOR FOS AV V FUEL OIL RETURN FUEL OIL SUPPLY ACID VENT VENT PD COMB IND HW AW PUMPED DISCHARGE COMBINATION SEWER INDIRECT WASTE HOT WASTE ACID WASTE STM SAN DE DW RW STORM SANITARY DEIONIZED WATER DISTILLED WATER RAW WATER DHWR (XXX°F) TW (XXX°F) DOMESTIC HOT WATER RETURN (XXX°F) TEMPERED WATER (XXX°F) DHW (XXX°F) SW DCW W DOMESTIC HOT WATER (XXX°F) SOFT WATER DOMESTIC COLD WATER WATER SERVICE NOTE: ALL SYMBOLS NOT NECESSARILY USED PIPING CO 1 RD EMERGENCY STORM E-STM HEAT TRACED PIPE GATE VALVE OC FOR COORDINATION OR REFERENCE DENOTES ITEM PROVIDED BY ANOTHER CONTRACTOR, SHOWN CO2CARBON DIOXIDE FOGFAT, OIL AND GREASE WASTE GENERAL VACVACUUM IAINSTRUMENT AIR UDUNDER DRAIN MEDICAL AIR OUTLET MEDICAL VACUUM OUTLET CARBON DIOXIDE OUTLET NITROGEN OUTLET NITROUS OXIDE OUTLET INSTRUMENT AIR OUTLET STRAINER SLIDE WASTE ANESTHESIA GAS DISPOSAL O A V C N NO I S W PROJECT NUMBER: CHECKED BY: DESIGNED BY: 1650 WATERMARK DRIVE COLUMBUS, OHIO 43215 SUITE 200 DRAWN BY: © 2021 M+A Architects PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: 2021-0012 20297 PLUMBING INDEX SHEET 04 MARCH 2022 P0.01Eric Stephens Nathan Criss Nathan Criss MEDVET INDIANAPOLIS -ANIMAL HOSPITAL9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032RENOVATION AND ADDITIONPLUMBING SHEET INDEX SHEET NUMBER SHEET NAME P0.01 PLUMBING INDEX SHEET P1.00 UNDERFLOOR PLUMBING DEMOLITION P1.01 FIRST FLOOR PLUMBING DEMOLITION P1.02 SECOND FLOOR PLUMBING DEMOLITION P1.03 ROOF PLUMBING DEMOLITION P1.11 FIRST FLOOR MEDICAL GAS DEMOLITION P2.00 UNDERFLOOR PLUMBING NEW WORK P2.01A FIRST FLOOR PLUMBING NEW WORK - AREA A P2.01B FIRST FLOOR PLUMBING NEW WORK - AREA B P2.01C FIRST FLOOR PLUMBING NEW WORK - AREA C P2.01D FIRST FLOOR PLUMBING NEW WORK - AREA D P2.02B SECOND FLOOR PLUMBING NEW WORK - AREA B P2.02C SECOND FLOOR PLUMBING NEW WORK - AREA C P2.02D SECOND FLOOR PLUMBING NEW WORK - AREA D P2.02E SECOND FLOOR PLUMBING NEW WORK - AREA E P2.03 ROOF PLUMBING NEW WORK P3.01 FIRST FLOOR MEDICAL GAS NEW WORK P3.02 SECOND FLOOR MEDICAL GAS NEW WORK P5.01 PLUMBING SCHEDULES P6.01 PLUMBING DETAILS P6.02 PLUMBING DETAILS P6.03 PLUMBING DETAILS P7.01 PLUMBING STACKS P7.02 PLUMBING STACKS 07/13/22