Loading...
HomeMy WebLinkAboutP1.01 - FIRST FLOOR PLUMBING DEMOLITIONx1 x1x5 x6 x6.5 x7 x7 x8 x9 x10 x12 x11 x11 x4 x3 x5.5 xA xB xC xD xE xF x2 G1 2 3 2 4 4 5 6 6 6 6 6 6 6 7 8 PROJECT NUMBER: CHECKED BY: DESIGNED BY: 1650 WATERMARK DRIVE COLUMBUS, OHIO 43215 SUITE 200 DRAWN BY: © 2021 M+A Architects PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: KEY PLAN 2021-0012 A BC D 20297 FIRST FLOOR PLUMBING DEMOLITION 04 MARCH 2022 P1.01Eric Stephens Nathan Criss Nathan Criss MEDVET INDIANAPOLIS -ANIMAL HOSPITAL9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032RENOVATION AND ADDITIONN 0'4' 8'2' 1' SCALE: 1/8" = 1'-0"1 FLOOR PLAN FIRST FLOOR DEMOLITION - OVERALL CODED NOTES: 1. REMOVE ALL NATURAL GAS PIPING. 2. REMOVE ALL EXISTING PLUMBING FIXTURES UNLESS NOTED OTHERWISE. CAP SANITARY PIPE UNDER FLOOR. REPAIR FLOOR TO MATCH EXISTING FLOOR. 3. EXISTING WALL HYRANT TO REMAIN. 4. REMOVE EXISTING SANITARY ABOVE FIRST FLOOR CEILING. 5. REMOVE EXISTING SANITARY STACK. 6. REMOVE PLUMBING FIXTURE. CAP SANITARY PIPE UNDER FLOOR. DEMOLISH ALL ASSOCIATED DCW AND DHW BACK TO MAIN OR AS SHOWN ON PLANS AND CAP. 7. EXISTING DOMESTIC WATER HEATER TO REMAIN FOR AS LONG AS NECASSARY TO COMPLETE RENOVATION. REMOVE WATER HEATER AFTER DHW1 AND DHW2 SERVE THE ENTIRE BUILDING. DEMOLISH EXISTING ASSOCIATED DHW AND DCW BACK TO MAIN AND CAP. DEMOLISH NATURAL GAS TO ABOVE CEILING AND CAP. 8. 2" EXISTING DCW SERVICE AND BACKFLOW PREVENTER TO REMAIN. 07/13/22