Loading...
HomeMy WebLinkAboutP1.02 - SECOND FLOOR PLUMBING DEMOLITIONx5 x6.5 x7 x8 x10 x10 xA xB xC xD xE xF x2 x2GG 1 2 23 3 PROJECT NUMBER: CHECKED BY: DESIGNED BY: 1650 WATERMARK DRIVE COLUMBUS, OHIO 43215 SUITE 200 DRAWN BY: © 2021 M+A Architects PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: KEY PLAN 2021-0012 A B CD E 20297 SECOND FLOOR PLUMBING DEMOLITION 04 MARCH 2022 P1.02Eric Stephens Nathan Criss Nathan Criss MEDVET INDIANAPOLIS -ANIMAL HOSPITAL9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032RENOVATION AND ADDITIONN 0'4' 8'2' 1' SCALE: 1/8" = 1'-0"1 FLOOR PLAN SECOND FLOOR OVERALL -DEMOLITION CODED NOTES: 1. REMOVE ALL NATURAL GAS PIPING ON SECOND FLOOR. 2. REMOVE ALL PLUMBING FIXTURES ON SECOND FLOOR. 3. REMOVE ALL DCW, DHW, AND DHWR PIPING ON SECOND FLOOR. DEMO BACK TO FIRST FLOOR MAIN AND CAP. 07/13/22