Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
P1.11 - FIRST FLOOR MEDICAL GAS DEMOLITION
x1 x1x5 x6 x6.5 x7 x7 x8 x9 x10 x12 x11 x11 x4 x3 x5.5 xA xB xC xD xE xF x2 11 1 2 O2N2WAGDPROJECT NUMBER: CHECKED BY: DESIGNED BY: 1650 WATERMARK DRIVE COLUMBUS, OHIO 43215 SUITE 200 DRAWN BY: © 2021 M+A Architects PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: PROJECT NUMBER: Sheet Name: DATE: SHEET NUMBER: REVISION: STATUS: KEY PLAN 2021-0012 A BC D 20297 FIRST FLOOR MEDICAL GAS DEMOLITION 04 MARCH 2022 P1.11Eric Stephens Nathan Criss Nathan Criss MEDVET INDIANAPOLIS -ANIMAL HOSPITAL9650 MAYFLOWER PARK DRIVE | CARMEL, IN 46032RENOVATION AND ADDITIONN 0'4' 8'2' 1' SCALE: 1/8" = 1'-0"1 FLOOR PLAN FIRST FLOOR DEMOLITION -OVERALL CODED NOTES: 1. REMOVE ALL MEDICAL GAS OUTLETS IN THIS AREA. REMOVE ALL ASSOCIATED MEDICAL GAS PIPING AS SHOWN ON PLAN. 2. REMOVE EXISTING WASTE ANESTHESIA SUCTION PUMP. 07/13/22